Ag Chem L2020 L3020 RoGator New Leader System Repair Time Schedule Manual_AG331637A – PDF DOWNLOAD
$89.95 Original price was: $89.95.$28.95Current price is: $28.95.
Ag Chem L2020 L3020 RoGator New Leader System Repair Time Schedule Manual_AG331637A – PDF DOWNLOAD
Description
Ag Chem L2020 L3020 RoGator New Leader System Repair Time Schedule Manual_AG331637A – PDF DOWNLOAD
FILE DETAILS:
Ag Chem L2020 L3020 RoGator New Leader System Repair Time Schedule Manual_AG331637A – PDF DOWNLOAD
Language : English
Pages : 354
Downloadable : Yes
File Type : PDF
Size: 17.7 MB
IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:
Ag Chem L2020 L3020 RoGator New Leader System Repair Time Schedule Manual_AG331637A – PDF DOWNLOAD
TIME ALLOWANCE :
The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained Dealer mechanic, of normal ability has taken to carry out the operation in a typical Dealership, using standard workshop tooling and equipment, located for reasonable access and working conditions.
- They DO NOT include any travelling to or from the farm or site. The machine is assumed to be clean and to be bare of any extra equipment or attachment of non AGCO manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available.
- The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended Special Tools shown in the workshop manual.
- The times are based on a second hand machine in reasonable condition properly maintained using approved parts. Extra time may be required to deal with seized, rusted or damaged parts, which must be claimed for separately when carrying out warranty work.
- Allowances are included in the operation times quoted for setting up the machine in the workshop, obtaining all tools and parts, cleaning and testing after repair.
- Time required to remove and install mounted implements, such as loaders, hedge cutters, etc., which interfere with performing a specific job is NOT INCLUDED in the time allowed.
- The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediated operations.
TABLE OF CONTENTS:
Ag Chem L2020 L3020 RoGator New Leader System Repair Time Schedule Manual_AG331637A – PDF DOWNLOAD
TANK AND SADDLE GROUP
BOX AND CONVEYOR GROUP
PRODUCT DISTRIBUTION GROUP
HYDRAULIC GROUP
ELECTRICAL GROUP
CONTROLLER GROUP
FOAM MARKER GROUP
DECAL GROUP
OPTION GROUP
UNKNOWN
Need help? Contact: [email protected]
PLEASE NOTE:
- This is the SAME exact manual used by your dealers to fix your vehicle.
- The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
- Any queries / doubts regarding your purchase, please feel free to contactย [email protected]
S.V
What Our Customers Say
๐ Related Products
Discover more professional manuals for your equipment

Ag Chem 1386 RoGator Chassis Repair Time Schedule Manual AG334910A - PDF DOWNLOAD

Ag Chem 984 1184 984H 1184H 1386 RoGator Liquid System Repair Time Schedule Manual AG334913A - PDF DOWNLOAD

Ag Chem 984 1184 Rogator Chassis Repair Time Schedule Manual_AG334911B - PDF DOWNLOAD
