★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
⚡
Instant Delivery
Available Immediately

AGCO® NA 5200 Draper Header REPAIR TIME SCHEDULE Manual 79034450 A – PDF DOWNLOAD

$25.95

AGCO® NA 5200 Draper Header REPAIR TIME SCHEDULE Manual 79034450 A – PDF DOWNLOAD

Buy now
⚡
Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

AGCO® NA 5200 Draper Header REPAIR TIME SCHEDULE Manual 79034450 A – PDF DOWNLOAD

FILE DETAILS:

AGCO® NA 5200 Draper Header REPAIR TIME SCHEDULE Manual 79034450 A – PDF DOWNLOAD

Language : English
Pages :113
Downloadable : Yes
File Type : PDF
Size:20.9 MB

DESCRIPTION:

AGCO® NA 5200 Draper Header REPAIR TIME SCHEDULE Manual 79034450 A – PDF DOWNLOAD

INTRODUCTION

A. TIME ALLOWANCE

  • The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained dealer mechanic, of normal ability has taken to carry out the operation in a typical dealership, using standard workshop tooling and equipment including air tools, located for reasonable access and working conditions.
  • They DO NOT include any traveling to or from the farm or site. The machine is assumed to be clean and to be bare of any extra equipment or attachment of non “AGCO” manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available.
  • The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended tools shown in the workshop manual. The times are based on a second hand machine in reasonable condition properly maintained using approved parts.
  • Extra time may be required to deal with seized, rusted or damaged parts. Allowances are included in the operation times quoted for obtaining all tools and parts, cleaning and testing after repair. Diagnostic time is included in the time allowance unless a separate code is listed for diagonistic time. The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediate operations.

B.TIMES

All the operating times are presented in hours and the decimal parts of an hour. Decimal times must be used on all warranty claims. The times given in this repair time schedule are for a complete job from start to finish. Where access has been gained for an adjacent repair only the additional time for the second repair will be accepted and not the total time for the two failures.

C.REVIEW OF TIMES 

If you find any improvement in the method which reduces the time of an operation or you find you cannot meet an operation time after more than three attempts using the recommended method, a “Request for Review of Time” form (see next page) must be submitted quoting all relevant details. Photo copy the form and fax it to the following address:

TABLE OF CONTENTS:

AGCO® NA 5200 Draper Header REPAIR TIME SCHEDULE Manual 79034450 A – PDF DOWNLOAD

Section
Contents
Description
Drives
Electrical
Sickle
Draper
Frame and Shields
Hydraulics
Decals and Kits
INDEX
5200 I DHW DRAPER HEADER
DECALS AND KITS
DECALS AND LOCATION DIAGRAM-LEFT 76
DECALS AND LOCATION DIAGRAM-RIGHT 77
FORE AND AFT REEL KIT-ELECTRIC (71401122 FORE AND AFT REEL KIT) 108
FORE AND AFT REEL KIT-ELECTRIC-CONT 109
GAUGE WHEEL ASSEMBLY (700717027 GAUGE WHEEL ASSEMBLY) 111
GAUGE WHEEL KIT (FIXED) (71393027 GAUGE WHEEL KIT) (LEFT SIDE SHOWN, RIGHT SIDE
OPPOSITE) 100
GAUGE WHEEL KIT (SWIVEL) (71404110 GAUGE WHEEL KIT-SWIVEL) 110
HEADER STAND KIT (71396012 HEADER STAND KIT) (LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE)
101
INSERT-NARROW OPENING KIT (71399058 INSERT-NARROW OPENING KIT) 102
KIT-AUSTRALIAN GUARDS, NARROW SPACED (71394609 KIT-AUSTRALIAN GUARDS) 112
PICKUP REEL CAM-18 FOOT (HARTCARTER) (LEFT SIDE) 87
PICKUP REEL CAM-18 FOOT (HARTCARTER) (RIGHT SIDE) 88
PICKUP REEL CAM-22 FOOT (HARTCARTER) (LEFT SIDE) 91
PICKUP REEL CAM-22 FOOT (HARTCARTER) (RIGHT SIDE) 92
PICKUP REEL CAM-25 FOOT (HARTCARTER) (LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE) 95
PICKUP REEL CAM-30 FOOT (HARTCARTER) (LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE) 98
PICKUP REEL KIT-18 FOOT (HARTCARTER) 89
PICKUP REEL KIT-18 FOOT (HARTCARTER) (71401110 PICKUP REEL KIT) 86
PICKUP REEL KIT-18 FOOT (UNIVERSAL) (71375019 PICKUP REEL KIT) 78
PICKUP REEL KIT-22 FOOT (HARTCARTER) 93
PICKUP REEL KIT-22 FOOT (HARTCARTER) (71401111 PICKUP REEL KIT) 90
PICKUP REEL KIT-22 FOOT (UNIVERSAL) (71375020 PICKUP REEL KIT) 80
PICKUP REEL KIT-25 FOOT (HARTCARTER) 96
PICKUP REEL KIT-25 FOOT (HARTCARTER) (71401112 PICKUP REEL KIT) 94
PICKUP REEL KIT-25 FOOT (UNIVERSAL) (71393019 PICKUP REEL KIT) 82
PICKUP REEL KIT-30 FOOT (HARTCARTER) 99
PICKUP REEL KIT-30 FOOT (HARTCARTER) (71401114 PICKUP REEL KIT) 97
PICKUP REEL KIT-30 FOOT (UNIVERSAL) (71393020 PICKUP REEL KIT) 84
PICKUP REEL MOUNTING AND CAM-18 FOOT (UNIVERSAL) 79
PICKUP REEL MOUNTING AND CAM-22 FOOT (UNIVERSAL) 81
PICKUP REEL MOUNTING AND CAM-25 FOOT (UNIVERSAL) 83
PICKUP REEL MOUNTING AND CAM-30 FOOT (UNIVERSAL) 85
SKID SHOE KIT (71394219 SKID SHOE KIT) (LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE) 103
WEARPLATE KIT (18 FOOT) (71401116 WEARPLATE KIT) 104
WEARPLATE KIT (22 FOOT) (71401117 WEARPLATE KIT) 105
WEAR PLATE KIT (25 FOOT) (71401118 WEARPLATE KIT) 106
WEARPLATE KIT (30 FOOT) (71401120 WEARPLATE KIT) 107
DRAPER
DECK ASSEMBLY-LEFT (18 FOOT) 21
DECK ASSEMBLY-LEFT (22 FOOT) 23
DECK ASSEMBLY-LEFT (25 FOOT) 25
DECK ASSEMBLY-LEFT (30 FOOT) 27
DECK ASSEMBLY-LEFT (36 FOOT) 29
DECK ASSEMBLY-RIGHT (18 FOOT) 22
DECK ASSEMBLY-RIGHT (22 FOOT) 24
DECK ASSEMBLY-RIGHT (25 FOOT) 26
DECK ASSEMBLY-RIGHT (30 FOOT) 28
DECK ASSEMBLY-RIGHT (36 FOOT) 30
DRAPERS 31
ROLLER MOUNTING-LEFT 19
ROLLER MOUNTING-RIGHT 20
DRIVES
GEARBOX ASSEMBLY (700721728 GEARBOX ASSEMBLY) 7
REEL DRIVE 5
SICKLE DRIVE MOUNTING 6
ELECTRICAL
ELECTRICAL 8
5200 / DHW DRAPER HEADER
FRAME AND SHIELDS
DIVIDER, STAND AND MAINFRAME (LEFT) (18 FOOT HEADER) 34
DIVIDER, STAND AND MAINFRAME (LEFT) (22, 25, 30 AND 36 FOOT HEADERS) 35
DIVIDER, STAND AND MAINFRAME (RIGHT) 36
DOUBLE SWATH MOUNTING (LEFT) 38
DOUBLE SWATH MOUNTING (RIGHT) 39
HYDRAULIC SHIELDS (18 FOOT) 40
HYDRAULIC SHIELDS (22 FOOT) 41
HYDRAULIC SHIELDS (25 FOOT) 42
HYDRAULIC SHIELDS (30 FOOT) 43
HYDRAULIC SHIELDS (36 FOOT) 44
REEL ARM-LEFT 32
REEL ARM-RIGHT 33
SHIELD-LEFT 37
TORQUE SHAFT 45
HYDRAULICS
CONVEYOR DRIVE HYDRAULIC-CENTER (DOUBLE SWATH) 68
CONVEYOR DRIVE HYDRAULIC-LEFT (18 FOOT) 56
CONVEYOR DRIVE HYDRAULIC-LEFT (22 AND 25 FOOT) 58
CONVEYOR DRIVE HYDRAULIC-LEFT (30 FOOT) 60
CONVEYOR DRIVE HYDRAULIC-LEFT (36 FOOT) 62
CONVEYOR DRIVE HYDRAULIC-LEFT (DOUBLE SWATH) 70
CONVEYOR DRIVE HYDRAULIC-RIGHT (18 FOOT) 57
CONVEYOR DRIVE HYDRAULIC-RIGHT (22 AND 25 FOOT) 59
CONVEYOR DRIVE HYDRAULIC-RIGHT (30 FOOT) 61
CONVEYOR DRIVE HYDRAULIC-RIGHT (36 FOOT) 63
CONVEYOR DRIVE HYDRAULIC-RIGHT (DOUBLE SWATH) (22 AND 25 FOOT) 71
CONVEYOR DRIVE HYDRAULIC-RIGHT (DOUBLE SWATH) (30 FOOT) 72
HYDRAULIC CONTROL VALVE ASSEMBLY (66411 CONTROL VALVE ASSEMBLY) 75
HYDRAULIC CYLINDER ASSEMBLY (MASTER) (700718834 HYDRAULIC CYLINDER ASSEMBLY) 55
HYDRAULIC CYLINDER ASSEMBLY (SLAVE) (700718835 HYDRAULIC CYLINDER ASSEMBLY) 54
HYDRAULIC CYLINDER ASSEMBLY-(DECK SHIFT) (700718836 HYDRAULIC CYLINDER ASSEMBLY)
69
HYDRAULIC MOTOR ASSEMBLY-SICKLE DRIVE (700719893 HYDRAULIC MOTOR ASSEMBLY) 67
MANIFOLD RELIEF VALVE ASSEMBLY (700725552 RELIEF VALVE ASSEMBLY) 66
REEL AND SICKLE DRIVE-CENTER (18 FOOT) 46
REEL AND SICKLE DRIVE-CENTER (22, 25, 30 AND 36 FOOT) 47
REEL AND SICKLE DRIVE-LEFT (18 FOOT) 48
REEL AND SICKLE DRIVE-LEFT (22 FOOT) 49
REEL AND SICKLE DRIVE-LEFT (25 FOOT) 50
REEL AND SICKLE DRIVE-LEFT (30 FOOT) 51
REEL AND SICKLE DRIVE-LEFT (36 FOOT) 52
REEL AND SICKLE DRIVE-RIGHT (18, 22, 25, 30 AND 36 FOOT) 53
VALVE ASSEMBLY-LEFT 73
VALVE ASSEMBLY-RIGHT 74
VALVE-DUAL FLOW CONTROL ASSEMBLY (700721404 VALVE-DUAL CONTROL ASSEMBLY) (OLD
VERSION) 64
VALVE-DUAL FLOW CONTROL ASSEMBLY (700729067 VALVE-DUAL CONTROL ASSEMBLY) (NEW
VERSION) 65
SICKLE
SICKLE ASSEMBLY (18 FOOT) (700721819 KNIFE ASSEMBLY) 9
SICKLE ASSEMBLY (22 FOOT) (700721821 KNIFE ASSEMBLY) 10
SICKLE ASSEMBLY (25 FOOT) (700721823 KNIFE ASSEMBLY) 11
SICKLE ASSEMBLY (30 FOOT) (700721825 KNIFE ASSEMBLY) 12
SICKLE ASSEMBLY (36 FOOT) (700721827 KNIFE ASSEMBLY) 13
SICKLE GUARD MOUNTING (18 FOOT) 14
SICKLE GUARD MOUNTING (22 FOOT) 15
SICKLE GUARD MOUNTING (25 FOOT) 16
SICKLE GUARD MOUNTING (30 FOOT) 17
SICKLE GUARD MOUNTING (36 FOOT) 18
4
INDEX

IMAGES PREVIEW OF THE MANUAL:

Questions? Email us: [email protected]

https://vimeo.com/837809020?share=copy

PLEASE NOTE:

  • This is the same manual used by the DEALERSHIPS to SERVICE your vehicle.
  • The manual can be all yours – Once payment is complete, you will be taken to the download page from where you can download the manual. All in 2-5 minutes time!!
  • Need any other service / repair / parts manual, please feel free to contact us at heydownloadss @gmail.com . We may surprise you with a nice offer

S.M

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
🛒
Recently Purchased
🕒 verified order