★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Cat Bucyrus SCH5000 Hydra-Trac Hydraulic Track Drill Service Manual SN 411310 – PDF DOWNLOAD

$32.95

Cat Bucyrus SCH5000 Hydra-Trac Hydraulic Track Drill Service Manual SN 411310 – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Cat Bucyrus SCH5000 Hydra-Trac Hydraulic Track Drill Service Manual SN 411310 – PDF DOWNLOAD

FILE DETAILS:

Cat Bucyrus SCH5000 Hydra-Trac Hydraulic Track Drill Service Manual SN 411310 – PDF DOWNLOAD

Language : English
Pages : 767
Downloadable : Yes
File Type : PDF

IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:

Cat Bucyrus SCH5000 Hydra-Trac Hydraulic Track Drill Service Manual SN 411310 – PDF DOWNLOAD

Safety Instructions:
Before Operation:
• Do notify the owner of overhead or underground power lines before drilling. Be sure to comply
with all local regulations regarding safe operating distances from power lines. See table 1-1 for
general guidelines for safe distances from high voltage lines.
• Do study this manual and fully understand the controls.
• Do be sure all safety guards are securely in place.
• Do wear safety helmet, glasses and hearing protection when operating or working on machine.
• Do be sure all personnel are clear of the machine and work area before starting the engine or
operating machine.
• Do be sure drill area is clear of all obstructions before operating machine.
• Do attach safety chain when using towbar.
• Do Not operate machine with:
• Hydraulic or air leaks
• Broken or damaged electrical wiring or components
• Damaged hydraulic hoses or fittings

Operation:
• Do examine the surface before drilling to determine the possible presence of unfired explosives.
• Do provide sufficient ventilation when running the engine in an enclosed area. Exhaust gasses
contain carbon monoxide, a deadly poison, which is colorless and odorless.
• Do keep work areas clean and clear of cuttings, hand tools and other objects.
• Do place feed in horizontal position with feed resting on feed rest (if equipped) when tramming
over rough ground or during long moves. When moving from hole to hole, be sure feed is high
enough to clear ground obstacles. If feed hits something while tramming, feed can fall causing
serious injury or death.
• Do Not use the machine for any other purpose than what it was designed for. This machine is
designed for blasthole drilling operations only.
• Do Not wear jewelry or loose fitting clothing when working on machinery. Keep clothing and
hands clear of moving parts.
• Do Not travel on steep inclines, soft or unstable ground or close to unsupported excavations.
• Do Not move boom or machine if it is in a potentially unstable position.
• Do Not stand directly under a boom or feed.
• Do Not drill into or near a “bootleg” hole or any hole that may contain explosives.
After Operation:
• Follow Shut Down Procedures as listed in Operator’s Manual.
Maintenance:
• Do have two people present when performing service work, both being fully trained on the safety
issues. One person shall supervise from the operator’s position and have immediate access to an
emergency stop in all situations. Visual, audible or verbal communication signals must be established
and understood by both persons.
• Do make sure each person is adequately trained to perform service and maintenance procedures.
• Do place a warning tag on starting controls to alert personnel that someone is working on the
machine and disconnect battery before making repairs or adjustments to machine.
• Do have adequate lighting when performing service work at night.
• Do relieve pressure on hydraulic or pneumatic systems before loosening connections or parts.
• Do make sure machine and components are well supported before servicing or replacing parts.
• Do maintain a metal-to-metal contact between the fill nozzle and fuel tank when filling the fuel
tank. This will prevent sparks and the possibility of an explosion.
• Do make sure no tools or other loose objects are left on the engine or drive mechanisms. They
could be thrown by this equipment with a powerful force.
• Do Not service or perform maintenance while machine is running.
• Do Not smoke or use an open flame near batteries, when servicing the batteries. Batteries can
give off hydrogen which is a highly explosive gas.
• Do Not hammer bit or drill steel. Use only proper tools to make repair or adjustments.
• Do Not weld or grind near oil lines.
• Do Not attempt to remove radiator cap when engine is hot or has overheated.

TABLE OF CONTENTS:

Cat Bucyrus SCH5000 Hydra-Trac Hydraulic Track Drill Service Manual SN 411310 – PDF DOWNLOAD

SCH5000Service.pdf......................................................................................................................  0
	Introduction........................................................................................................................  4
		Table of Contents...............................................................................................................  5
		U.S./Metric Conversions......................................................................................................... 13
		Glossary of Terms............................................................................................................... 15
		Component Locations (C-10 engine)............................................................................................... 17
		Component Locations (3306 engine)............................................................................................... 21
	Section 1........................................................................................................................... 28
	SAFETY.............................................................................................................................. 28
		Overview of Potential Hazards................................................................................................... 29
		Safety Instructions............................................................................................................. 30
		Clearances from High Voltage Lines.............................................................................................. 30
	Section 2........................................................................................................................... 34
	MAIN FRAME/TRACKS (INTERTRACTOR CRAWLERS)........................................................................................... 34
		Track Oscillation Cylinders..................................................................................................... 35
			Removal..................................................................................................................... 35
			Installation................................................................................................................ 35
		Track Maintenance............................................................................................................... 36
		Track Tension Adjustment........................................................................................................ 37
		Metric Bolt Torque Specifications............................................................................................... 39
		Track Assembly.................................................................................................................. 40
			Separate Track Chain Assembly............................................................................................... 40
			Track Link - Repair & Replace............................................................................................... 41
			Track Shoe (grouser) - Mounting to Track Chain.............................................................................. 43
			Grouser Bolt Torque (Direct Torque Method).................................................................................. 45
			Grouser Bolt Torque (Torque Turn Method).................................................................................... 46
			Track Chain & Shoe - Assembly & Installation................................................................................ 47
		Final Drive - General Description............................................................................................... 49
			Removal from Track Frame.................................................................................................... 50
			Installation into Track Frame............................................................................................... 51
			Final Drive Maintenance..................................................................................................... 52
				Oil Check / Change...................................................................................................... 52
				Final Drive Oil......................................................................................................... 53
			Final Drive Assembly........................................................................................................ 55
				Brake Assembly.......................................................................................................... 58
		Idler Unit...................................................................................................................... 59
			General Description......................................................................................................... 59
			Removal and Disassembly..................................................................................................... 61
			Assembly and Installation................................................................................................... 63
		Track Rollers................................................................................................................... 66
			General Description......................................................................................................... 66
			Removal & Disassembly....................................................................................................... 67
			Track Roller - Assembly..................................................................................................... 69
			Track Roller - Test and Install............................................................................................. 70
		Support Rollers................................................................................................................. 71
			General Description......................................................................................................... 71
			Removal & Disassembly....................................................................................................... 72
	Reedrill Crawlers (early machines).................................................................................................. 74
		Track Oscillation Cylinders..................................................................................................... 75
			Removal..................................................................................................................... 75
			Installation................................................................................................................ 75
		Track Tension Adjustment........................................................................................................ 76
		Track Assembly.................................................................................................................. 78
			Separate Track Chain Assembly............................................................................................... 78
			Connect Track Assemblies.................................................................................................... 80
		Front Idler & Recoil Spring..................................................................................................... 82
			Removal..................................................................................................................... 82
			Replace..................................................................................................................... 83
			Front Idler Disassembly..................................................................................................... 84
			Front Idler Assembly........................................................................................................ 86
		Track Carrier Rollers........................................................................................................... 88
			Removal..................................................................................................................... 88
			Replace..................................................................................................................... 89
			Duo-Cone Seals.............................................................................................................. 90
		Final Drive Oil................................................................................................................. 94
			Checking Oil Level in Final Drive........................................................................................... 95
			Changing Oil in Final Drive................................................................................................. 95
			Towing Procedure (late models).............................................................................................. 97
			Gear Drive Disconnect (machines with spacer)................................................................................ 97
			Gear Drive Disconnect (early model machines with spring).................................................................... 99
			Final Drive Disengage Spacer Retrofit.......................................................................................101
			Final Drive Assembly........................................................................................................103
				Final Drive Repair......................................................................................................107
				Final Drive Motors......................................................................................................108
	Section 3...........................................................................................................................112
	POWER TRAIN.........................................................................................................................112
		Hydraulic Pumps.................................................................................................................113
			Removal and Installation....................................................................................................113
		Pump Drive......................................................................................................................114
			Funk Pump Drive - Removal (for machines built after May, 1998)..............................................................114
			Funk Pump Drive Gearbox - Repair............................................................................................115
			Terrell Pump Drive Gearbox - Repair.........................................................................................119
		Hydraulic Pump Retrofit Procedure...............................................................................................124
			Rexroth Pump Installation...................................................................................................125
		Fuel System - Cat 3306 Engine...................................................................................................133
			Fuel Tank Maintenance.......................................................................................................133
			Fuel Filters - Every 250 Hours of Operation.................................................................................134
			Priming the Fuel System.....................................................................................................134
		Fuel System - Cat C-10 Engine...................................................................................................135
			Fuel Tank Maintenance.......................................................................................................135
			Fuel Filters - Every 250 Hours of Operation.................................................................................136
			Priming the Fuel System.....................................................................................................136
		Coolers - 3306 Engine...........................................................................................................137
			Engine Radiator - Capacity and Service......................................................................................137
			Coolant Specifications......................................................................................................138
			Coolers - Removal and Installation..........................................................................................141
		Coolers - C-10 Engine...........................................................................................................139
			Engine Radiator - Capacity and Service......................................................................................139
			Coolant Specifications......................................................................................................140
			Coolers - Removal and Installation..........................................................................................143
	Section 4...........................................................................................................................146
	HYDRAULIC/ELECTRICAL SYSTEMS/CAB COMPONENTS.........................................................................................146
		Hydraulic System................................................................................................................147
		Basic Hydraulic Schematic (Vickers Pump)........................................................................................148
		Basic Hydraulic Schematic (Rexroth Pumps).......................................................................................149
		Tram Console with Boom Hosing...................................................................................................150
		Hydraulic Schematic - Drill Console.............................................................................................151
		Hydraulic Schematic - Cab.......................................................................................................152
		Rod Changer Piping..............................................................................................................154
		Boom Piping.....................................................................................................................155
		Hydraulic Valves - Maintenance..................................................................................................156
			Boom/Feed Pilot Valve.......................................................................................................156
			Tram Pilot Valve............................................................................................................157
		Electrical Arrangement - 3306 Engine............................................................................................158
		D.C. Schematic - Non-Cab (3306 Engine)..........................................................................................161
		D.C. Schematic - with Cab (3306 Engine).........................................................................................163
		Wiring Diagram - with Cab (3306 Engine).........................................................................................169
		Wire Number/Color Code Chart (3306 Engine)......................................................................................172
		Wiring Diagram - Boom Control Panel.............................................................................................175
		Wiring Diagram - Drill Control Panel............................................................................................176
		Wiring Diagram - Tram Control Panel.............................................................................................177
		Wiring Diagram - Instrument Panel (3306 Engine).................................................................................178
		Air Ride Seat Assembly..........................................................................................................179
		Electrical Arrangement - C-10 Engine............................................................................................184
		D.C. Schematic with Cab (C-10 Engine)...........................................................................................187
		Wiring Diagram - Instrument Panel (C-10 Engine).................................................................................192
		Wiring Diagram with Cab (C-10 Engine)...........................................................................................193
	Section 5...........................................................................................................................195
	AIR SYSTEM..........................................................................................................................195
		Air Receiver Tank...............................................................................................................196
			Preventive Maintenance......................................................................................................196
			Troubleshooting.............................................................................................................198
		Air System Components...........................................................................................................200
		Compressor Oil Piping...........................................................................................................201
			Thermostatic Bypass Valve...................................................................................................201
		Air Valve Piping (cab machines).................................................................................................202
		Air Valve Piping (non-cab machines).............................................................................................203
		Compressor Assembly.............................................................................................................204
			Compressor Unit.............................................................................................................205
			Drive Coupling - Replacement................................................................................................205
			Air Compressor Drive Motor..................................................................................................206
				Variable Displacement Motor Adjustment..................................................................................207
		Detergent Tank Piping...........................................................................................................208
	Section 6...........................................................................................................................209
	Boom & Feed Components..............................................................................................................209
		Boom Lift Cylinder..............................................................................................................210
			Removal.....................................................................................................................210
			Replace.....................................................................................................................211
			Cylinder Bleeding Procedure and Final Installation:.........................................................................211
		Boom Swing Cylinder.............................................................................................................212
			Removal.....................................................................................................................212
			Replace.....................................................................................................................213
			Cylinder Bleeding Procedure and Final Installation:.........................................................................213
		Feed Dump Cylinder..............................................................................................................214
			Removal.....................................................................................................................214
			Replace.....................................................................................................................215
			Cylinder Bleeding Procedure and Final Installation:.........................................................................215
		Feed Swing Cylinder.............................................................................................................216
			Removal.....................................................................................................................217
			Replace.....................................................................................................................219
			Cylinder Bleeding Procedure and Final Installation:.........................................................................219
			Indexing the Feed Swing Cylinder............................................................................................220
		Feed Extension Cylinder.........................................................................................................223
			Removal.....................................................................................................................223
			Replace.....................................................................................................................225
			Cylinder Bleeding Procedure and Final Installation:.........................................................................225
		Boom Shim/Wear Pad Replacement..................................................................................................226
			Boom Wear Pads - Inspection.................................................................................................227
			Feed and Feed Table - Removal from Boom.....................................................................................228
			Inner Boom Tube - Removal...................................................................................................231
			Rear Wear Pads and Shims - Installation.....................................................................................233
			Front Wear Pads and Shims - Installation....................................................................................235
			Feed and Feed Table - Installation on Boom..................................................................................236
			Boom Wear Pads - Final Inspection...........................................................................................239
		HPR2 Hydraulic Rock Drill.......................................................................................................240
			Removal from Feed...........................................................................................................241
			Mounting Slide Adjustment...................................................................................................242
		Feed Chain Adjustment...........................................................................................................243
		Traveling Hose Reel Timing......................................................................................................244
		Feed Table Wear Pad Adjustment..................................................................................................246
		Feed Table Pivot Pin............................................................................................................247
			Adjustment and Maintenance..................................................................................................247
	Section 7...........................................................................................................................249
	PRESSURE SETTINGS & ADJUSTMENTS.....................................................................................................249
		Engine Adjustments - Caterpillar 3306...........................................................................................250
		Engine Adjustments - Cat C-10...................................................................................................252
		Brake Valve Adjustments.........................................................................................................254
		Tram System.....................................................................................................................258
		Feed/Boom Valve Adjustment......................................................................................................269
		Main Pump Adjustments (Vickers PVD45)...........................................................................................270
		Main Pump Adjustments (Rexroth A11VLO)..........................................................................................274
		Rotation Pump Circuit...........................................................................................................278
		Drill & Feed Valve Adjustments..................................................................................................282
		Collaring Circuit Adjustment....................................................................................................284
		Anti-Jam / Collaring Circuit....................................................................................................286
		Reverse Percussion Option.......................................................................................................289
		Dust Collector Assembly.........................................................................................................294
			Function of Dust Collector..................................................................................................295
			Initial Start-up and Tuning.................................................................................................296
			Dust Collector Valve - Adjustment...........................................................................................296
			Air Pressure Regulator - Adjustment.........................................................................................297
			Timer - Adjustment..........................................................................................................298
			Filter Elements.............................................................................................................300
			Operational Variables.......................................................................................................301
			Fine Tuning.................................................................................................................301
			Manometer Setup Instructions................................................................................................303
			Timer Installation..........................................................................................................304
			Control Circuit.............................................................................................................305
			Fan Removal and Installation................................................................................................306
			Troubleshooting Hints.......................................................................................................307
		Centralizer Adjustment..........................................................................................................309
		Vertical Indicator..............................................................................................................310
		Rod Changer Valve...............................................................................................................312
			Pressure Adjustments........................................................................................................312
		3 Bank Valve - Cab/Drill Console................................................................................................314
			Pressure Adjustments........................................................................................................314
		Coupling Grease System..........................................................................................................316
			Adjustments.................................................................................................................317
			Daily Maintenance...........................................................................................................317
			Air Pressure Regulator......................................................................................................318
			Filter Assembly.............................................................................................................319
			Lubricator Assembly.........................................................................................................320
			3-Way Air Valve.............................................................................................................322
	Section 8...........................................................................................................................327
	VENDOR SERVICE INFORMATION..........................................................................................................328
		Bonfiglioli.....................................................................................................................331
		Char-Lynn / H Series............................................................................................................363
		Char-Lynn 2000 Series...........................................................................................................371
		Fairfield / CT26C...............................................................................................................381
		Fairfield S1A Final Drive.......................................................................................................423
		General Engineering.............................................................................................................436
		Lincoln / 82716 - Series "F"....................................................................................................439
		Rexroth / A2FM90................................................................................................................449
		Rexroth / A6VM107...............................................................................................................469
		Rexroth / A11VLO130.............................................................................................................497
		Rexroth / A4FM28................................................................................................................545
		Star Dynamics...................................................................................................................548
		Sundstrand/Series 51............................................................................................................551
		Texas Hydraulics................................................................................................................570
		Vickers / PVE19L................................................................................................................587
	Section 9...........................................................................................................................619
	Hydraulic Rock Drill Repair.........................................................................................................619
	HPR2 Service 408860.pdf.............................................................................................................620
		Table of Contents...............................................................................................................623
		Overview of Potential Hazards...................................................................................................629
		Safety Instructions.............................................................................................................630
		Maintenance and Equipment Transfer..............................................................................................632
		Start-Up Procedure..............................................................................................................635
		Operation and After Operation...................................................................................................631
		General Maintenance Tips........................................................................................................636
		Preventive Maintenance..........................................................................................................637
		At the beginning of every shift:................................................................................................638
		TROUBLESHOOTING.................................................................................................................641
		General Tips on Drill Overhaul..................................................................................................649
		Tool Requirements...............................................................................................................650
		Special Tool List...............................................................................................................652
		Drill Torque Specifications.....................................................................................................656
		Removal of Drill from the Feed..................................................................................................658
		Installation of Drill on the Feed...............................................................................................660
		Drill Disassembly...............................................................................................................661
		Drill Assembly..................................................................................................................685
		Charging the Accumulators.......................................................................................................729
		Hydraulic Oils for Percussion Drills............................................................................................735
		Hydraulic Drill Rotation Unit Lubrication.......................................................................................736
		HPR2 Wear Tolerances (51mm shank)...............................................................................................737
		HPR2 Wear Tolerances (68mm shank)...............................................................................................743
		Section 10......................................................................................................................754
		LUBRICATION & TORQUE SPECIFICATIONS.............................................................................................754
			Hydraulic Oils for Percussion Drills........................................................................................755
			Lubrication and Inspection..................................................................................................756
			Engine Oil..................................................................................................................756
			Preventive Maintenance Chart................................................................................................757
			Bolt Maintenance............................................................................................................759
			Bolt Torque Specifications..................................................................................................760
			Maintenance Record..........................................................................................................761

Customer Support: [email protected]

https://vimeo.com/866709972?share=copy

PLEASE NOTE:

  • This is the SAME MANUAL used by the dealerships to diagnose your vehicle
  • No waiting for couriers / posts as this is a PDF manual and you can download it within 2 minutes time once you make the payment.
  • Your payment is all safe and the delivery of the manual is INSTANT – You will be taken to the DOWNLOAD PAGE.
  • So have no hesitations whatsoever and write to us about any queries you may have : heydownloadss @gmail.com

S.V

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order