CAT SKF Infinity Blasthole Drill Service Manual – PDF DOWNLOAD
$31.95
CAT SKF Infinity Blasthole Drill Service Manual – PDF DOWNLOAD
Serial No.TRX68skFJDNAC0019
Description
CAT SKF Infinity Blasthole Drill Service Manual – PDF DOWNLOAD
FILE DETAILS:
CAT SKF Infinity Blasthole Drill Service Manual – PDF DOWNLOAD
Language : English
Pages : 653
Downloadable : Yes
File Type : PDF
DESCRIPTION:
CAT SKF Infinity Blasthole Drill Service Manual – PDF DOWNLOAD
Serial No.TRX68skFJDNAC0019
Safety Information
This safety alert symbol indicates important safety messages in this manual.
When you see this symbol, carefully read the message that follows and be alert to
the possibility of personal injury or property damage.
WARNING: BEFORE starting engine:
• Study Operator and Service Manuals
• Study Engine Operator and Maintenance Manual
• Practice All Safety Precautions
• Make Pre-operation Check
• Learn Controls Before Operating
- This manual is furnished with your Infinity Series rotary blasthole drill to aid you in performing the necessary service work to maintain your drill in good operating condition. This manual contains repair and adjustment information for all major operating systems on the machine.
- In some cases such as hydraulic pumps and motors it is better to replace the unit with a new or rebuilt unit than to perform major repairs.
- Should further information be desired or should particular problems arise which are not covered sufficiently in this manual, the matter should be referred to manufacturer. The descriptions and specifications contained in this manual were in effect at the time of printing.
- The right is reserved to make changes at any time without notice and without obligation. It is YOUR responsibility to understand and follow manufacturer’s instructions on machine operation and service, and to observe pertinent safety precautions, laws and regulations.
- Failure to read and understand this manual and all safety, capacity and instruction placards on the machine before operating the unit, constitutes a misuse of the machine. It is your responsibility to know the manufacturer’s specific requirements, government regulations, required precautions and any work hazards which may exist.
- You must make these known to all personnel working with the equipment or in the area, so that all may take the necessary and required safety precautions.
- Keep all children, visitors, and untrained personnel away from the equipment. It is also your responsibility to operate your equipment with skill, good judgment, and caution. Following recognised safety procedures will help you avoid accidents. Failure to heed these instructions can result in property damage, serious injury or death.
IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:
CAT SKF Infinity Blasthole Drill Service Manual – PDF DOWNLOAD
Section 1 Contents 1-3
Safety 1-5
Overview of Potential Hazards 1-5
Personal Protective Equipment 1-5
Noise 1-5
Electrical Contact 1-5
Contaminated Air 1-6
Moving and Rotating Parts 1-7
High Pressure Air or Fluid 1-7
Before Operation 1-7
During Operation 1-8
Maintenance 1-10
Equipment Transfer 1-10
Safety Locator 1-11
Notes 1-14
Section 2 – Operator’s Cab / Controls 2-1
Section 2 Contents 2-3
Graphic Symbol Legend 2-5
Graphic Symbol Legend 2-5
Warning Decals 2-9
Warning Decals 2-9
Operator Control and Instrument Panels 2-12
Control Panels 2-12
Right Hand Control Panel 2-12
Instrument Panel 2-14
Circuit Breakers 2-15
Light Switches 2-15
System Pressure Gauge Panel 2-16
Left Hand Control Panels 2-18
Cab Foot Controls 2-22
Thread Grease Switch 2-22
Pipe Safety Arm Override Switch 2-22
Machine Stability 2-23
Tramming Procedure 2-23
Track Adjustments 2-23
New Machine Procedure 2-24
General Maintenance Checks While Tramming 2-24
Roller Locations 2-25
Temperature and Condition Record Chart for Walking 2-26
Propelling the Machine 2-27
Stability Limits 2-29
SKF Transient Stability Limits 2-30
Cab Heater 2-31
Cab Heater Fault Isolation 2-31
BI620402
Bucyrus International, Inc ®
SKF-98 Introduction Int-6 November, 10 Version 1
Contents
Air Conditioner 2-32
T7 Series Split System Air Conditioning Manual 2-32
Section 1 0 Technical Data and Control Settings 2-33
Section 2 0 Installation and Commissioning 2-35
Section 3 0 Routine Maintenance Procedures 2-41
Section 4 0 Fault Diagnosis 2-42
Section 5 0 Reference Drawings 2-51
Notes 2-56
Section 3 – Main Frame / Crawlers 3-1
Section 3 Contents 3-3
Main Frame Repair – General 3-5
Main Frame Repair 3-5
Weld Inspection Schedule 3-6
Main Frame 3-6
Levelling Jacks 3-7
Levelling Jacks Cylinder 3-7
Levelling Jacks 3-8
Limit Switch 3-8
Levelling Jack Cylinders 3-8
Mast Elevating Cylinders 3-9
Mast Elevating Cylinders 3-9
Internal Counterbalance Valve 3-10
Fuelling Valves 3-12
Hydrau-Flo® Fuelling Valves 3-12
Crawler Assembly 3-14
Crawler Assembly 3-14
Crawler Component Repair 3-15
Tramming 3-16
Maintenance checks for Tramming 3-16
Track Adjustments 3-16
New Machine Procedure 3-17
General Maintenance Checks While Tramming 3-17
Roller Locations 3-18
Temperature and Condition Record Chart for Walking 3-19
Metric Bolt Torque 3-20
Metric Bolt Torque Specifications 3-20
Track Maintenance 3-21
Before Operating the Machine 3-21
General Maintenance 3-21
Track Tension 3-22
Track Assembly 3-22
Hydraulic Tensioner 3-24
Track Tension Unit 3-25
Track and Support Rollers 3-26
Track Roller Assembly 3-26
Track Roller Unit 3-27
Track Roller – Removal and Disassembly 3-27
BI620402
Bucyrus International, Inc ®
November, 10 Version 1 Int-7 SKF-98 Introduction
Contents
Track Roller – Assembly 3-28
Track Roller – Test and Install 3-29
Support Roller Assembly 3-31
Support Rollers Unit 3-32
Support Roller – Removal and Disassembly 3-32
Support Roller – Assembly 3-33
Track Chain 3-35
Track Chain – Separate 3-35
Track Chain Repair 3-36
Track Shoes Installation 3-38
Track Link Position 3-38
Track Shoe – Mounting to Track Chain 3-38
Track Shoe Bolt Torque (Direct Torque Method) 3-40
Bolt Torque KN111 3-40
Track Shoe Bolt Torque (Torque Turn Method) 3-41
Bolt Torque KN111 3-41
Track Chain and Shoe Installation 3-42
Track Chain with Shoes 3-42
Track Chain and Shoe – Assembly and Installation 3-42
Final Drive Unit 3-44
Final Drive Unit 3-44
Removal from Track Frame 3-45
Installation into Track Frame 3-46
Final Drive Maintenance 3-47
Final Drive Oil 3-48
Final Drive Assembly 3-50
Parking Brake – Description 3-51
General Description 3-52
General Recommendations for Disassembly and Assembly Operations 3-52
Final Drive – Disconnect and Parking Brake 3-54
Towing Procedure – Gear Drive Disconnect 3-54
Parking Brake – Description 3-55
Parking Brake – Removal and Installation 3-55
Sealing Compounds and Adhesives 3-56
Filling and Checks 3-58
Service Schedule 3-58
Tightening Torques 3-59
Lubrication / Greasing – Grades and Application Range 3-59
Troubleshooting 3-60
Special Tools 3-60
Idler Unit 3-61
Idler Unit – Assembly 3-61
Idler Unit – Removal 3-62
Track and Sprocket Inspection 3-65
Track Inspection and Wear Limit Guide 3-65
Sprocket Wear Patterns 3-70
BI620402
Bucyrus International, Inc ®
SKF-98 Introduction Int-8 November, 10 Version 1
Contents
Auxiliary Crane 3-76
Hydraulic Crane – Rear Deck Crane Palfinger PC1500 3-76
Rear Deck Crane Palfinger PC1500 Service information 3-77
Checking Bolted Connections 3-77
Maintenance Chart 3-78
Lubrication 3-80
Hydraulic Fluids 3-83
Oil Change / Oil Maintenance 3-84
Cleaning Agents and Equipment 3-84
Repairing Paint Damage 3-85
Removal From Service and Disposal 3-85
Notes 3-86
Section 4 – Engine / Drive Train / Compressor 4-1
Section 4 Contents 4-3
Power Group Locator 4-5
Power Group Locator 4-5
Test Point Locator 4-6
Test Point Locator 4-6
Engine 4-8
Cummins Engine 4-8
Oil Reserve Systems 4-9
LED Monitor Readings 4-10
Adjustment of Running Oil Level 4-10
Wiring Diagram – Oil Reserve Basic Circuit 4-11
Oil Pressure Switch 4-11
Oil Reserve System 4-11
Troubleshooting 4-12
Maintenance 4-12
Engine Fuel System – QSK19 Tier II 4-13
Filtration Hardware Mounting 4-17
Fuel Plumbing 4-17
Installation Requirements 4-18
Installation and Operation Recommendations 4-18
Fuel Filter (Stage 1) 4-20
Fuel Filter (Stage 2) 4-24
Engine and Compressor Air Cleaners 4-27
Engine and Compressor Air Cleaner Service Assembly 4-27
Engine and Compressor Air Cleaner Service 4-28
Flexible Drive Coupling 4-31
Flexible Drive Coupling Service 4-31
Pump Drive 4-33
Pump Drive Assembly – Removal and Replacement 4-33
Pump Drive Gearbox 4-34
Pump Drive Gearbox Repair 4-34
Hydraulic Pumps 4-36
Pump Arrangement 4-36
Hydraulic Pumps – Removal and Replacement 4-37
BI620402
Bucyrus International, Inc ®
November, 10 Version 1 Int-9 SKF-98 Introduction
Contents
Compressor Installation 4-38
1700cfm / 125psi Compressor Assembly 4-38
Safety 4-39
Compressor Installation 4-42
Compressor Drive Coupling 4-43
Compressor Alignment 4-44
Mounting Instructions for Arcusaflex™ Flywheel Couplings 4-45
Taper-Loc Bushing Installation – Model AC-T5 SN F2 V1 3535 4-46
Tightening Torques for Arcusaflex™ Flywheel Couplings 4-46
Compressor Shaft Seal 4-47
Compressor Shaft Seal 4-47
Low Pressure Compressor 4-49
Description 4-49
Compressed Air Functions 4-49
Compressor Inlet Valve Control System 4-53
Inlet Valve 4-54
Compressor Regulation 4-56
Relieving Regulators 4-57
Reducing Regulators 4-59
System Blowdown Valve 4-61
Running Blowdown Valve 4-62
Spiral Valve 4-64
Compressor Air and Oil Circuits – 1700cfm @ 125psi 4-64
Compressor Air Circuit Parts List 4-67
Compressor Air Circuit Legend 4-67
Compressor Control Set-up Closed Poppet Inlet – Shutdown 4-68
Compressor Control Set-up Closed Poppet Inlet – Initial Start-up Below 50psi 4-69
Compressor Control Set-up Closed Poppet Inlet – Initial Start-up Above 50psi 4-70
Compressor Control Set-up Closed Poppet Inlet – Run Unloaded 4-71
Compressor Control Set-up Closed Poppet Inlet – Drilling 4-72
Compressor Control Set-up Closed Poppet Inlet – Shutting Down 4-73
Operation 4-74
Compressor Maintenance 4-76
General Maintenance 4-76
Discharge Check Valve 4-78
Compressor Receiver Tank Assembly 4-79
Separator Elements 4-80
Scavenge Line 4-81
Compressor Discharge Temperature Gauge, Switch and Sender 4-83
Minimum Pressure Valve 4-84
Minimum Pressure / Check Valve Maintenance 4-84
Thermal Bypass Valve 4-85
Thermal Bypass Valve Maintenance 4-86
Compressor Fluid Filter 4-88
Changing Filter Elements 4-89
Oil Stop Valve 4-90
Troubleshooting 4-91
BI620402
Bucyrus International, Inc ®
SKF-98 Introduction Int-10 November, 10 Version 1
Contents
Coolers 4-93
Hydraulic Oil / Hydraulic Cooler Assembly 4-93
Compressor Oil Cooler 4-94
Fan Speed 4-94
Engine Cooler / Radiator 4-95
Aluminium Tube Air to Oil Cooler 4-96
Aluminium Tube Air to Oil Cooler – Standard Parts 4-96
Removal and Replacement 4-97
Internal Cleaning 4-99
Radiator Cooler 4-101
Typical Radiator Core – Standard Parts 4-101
Cleaning 4-102
Tube Removal 4-103
Seal Installation 4-104
Lubrication Seals and Tube Ends 4-104
Tube Installation 4-105
Notes 4-108
Section 5 – Dust Control System 5-1
Section 5 Contents 5-3
Dust Control System 5-5
Dust Control Systems 5-5
Tipton FC-4500 Dust Collector 5-7
Dust Collector 5-9
Blower Assembly 5-9
Manometer Readings 5-10
Air Regulator / Filter 5-11
Electric Timer 5-12
Compressed Air Supply 5-13
Filter Maintenance 5-13
Routine Maintenance 5-14
Troubleshooting Guide 5-15
Water Injection 5-16
Water Injection and Dust Collector Circuit 5-16
Water Tanks 5-17
Water Injection Pump 5-18
Water Injection Relief Valve 5-18
Water Injection Control 5-19
Water Injection Basic Circuit 5-21
Water Pump 5-22
Water Injection Pump Assembly 5-22
Pump Specifications 5-23
Torque Requirements 5-23
Servicing Instructions 5-23
Servicing the Plunger Packings 5-23
Reassembling Plunger Packings 5-24
BI620402
Bucyrus International, Inc ®
November, 10 Version 1 Int-11 SKF-98 Introduction
Contents
Servicing the Pump Valves 5-24
Reassembling Valve Parts 5-24
Servicing the Crankshaft 5-25
Servicing the Crossheads 5-25
Replacing Piston Cup Seals 5-26
Replacing Suction and Discharge Valves 5-27
Replacing Power End Bearings 5-28
Servicing the Wrist Pin Bearings 5-29
Fastener Torque Requirements 5-29
Recommended Lubricants 5-30
Water Pump Motor Repair 5-30
Water Pump Drive Coupling 5-30
Level and Flow Transducer 5-30
Notes 5-31
Section 6 – Mast / Rotary Drive / Pipe Rack 6-1
Section 6 Contents 6-3
Mast Weldment 6-5
Mast Repair 6-5
Weld Inspection Schedule 6-6
Mast Inspection 6-6
Mast Assembly and Installation 6-7
Mast Assembly 6-7
Mast Pivot Caps 6-8
Mast Elevate Cylinders 6-9
Angle Drilling 6-9
Mast / Drill Without Mast 6-10
Mast Assembly 6-11
Raising the Mast 6-11
Hoist / Pulldown Cylinder 6-13
Hoist / Pulldown Cylinder 6-13
Feed Cylinder System 6-14
Removal 6-15
Installation 6-16
Repair 6-17
General Information 6-17
Hoist / Pulldown Cable 6-18
Hoist / Pulldown Cable Adjustment 6-18
Hoist / Pulldown Cable Replacement 6-19
Wire Rope 6-20
Rotary Drive 6-21
Alignment Procedure 6-21
Rotary Drive Assembly 6-22
Rotary Drive – Removal from Mast 6-23
Rotary Drive – Installation 6-23
Single Motor Rotary Drive Gearbox 6-24
BI620402
Bucyrus International, Inc ®
SKF-98 Introduction Int-12 November, 10 Version 1
Contents
Manufacturers Recommendations – Blast Hole Drilling Consumables 6-25
Air Swivel (Single Seal Style) 6-26
Rotary Drive Motor – Repair 6-27
Torque Limit Table Grade 8 UNC 6-28
Torque Limit Table Grade 8 UNF 6-29
Rotary Drive Motor 6-30
Deck Wrench 6-31
Deck Wrench 6-31
H O B O Wrench 6-32
H O B O Wrench 6-32
Tong Dies 6-33
Optional Hydraulic Operated Bit Basket – H O B B 6-34
Pipe Positioner 6-35
Pipe Positioner 6-35
Carousel Pipe Rack 6-36
Carousel Pipe Rack 6-36
Chain Drive – Adjustment / Replace 6-36
Pipe Rack Bearings – Replace 6-37
Carousel Top Tube Bearing – Replace 6-38
Carousel Lower Bearing – Replace 6-40
Upper Pivot Support Bearing 6-41
Carousel Pivot Support Upper Bearing – Replace 6-42
Pivot Support Pipe Lower Bushing 6-43
Carousel Pivot Support Lower Bearing – Replace 6-44
Mid Point Carousel Pivot Support 6-45
Carousel Rotate Motor 6-45
Top Sub Saver 6-46
Replacement Procedure 6-46
Notes 6-47
Section 7 – Hydraulic Systems 7-1
Section 7 Contents 7-3
Hydraulic Symbols 7-7
Hydraulic Symbols 7-7
Pressure Setting Sequence 7-9
Pressure Setting Sequence 7-9
Hydraulic System 7-9
Main Hydraulic Pumps 7-10
Pump Arrangement 7-10
Hydraulic Tank 7-11
Hydraulic Tank 7-11
Hydraulic System 7-12
Main Return and Case Drain Filter 7-13
Routine Maintenance 7-14
Changing Filter Elements 7-14
BI620402
Bucyrus International, Inc ®
November, 10 Version 1 Int-13 SKF-98 Introduction
Contents
Loop Filters 7-15
Loop Filters 7-15
Loop Filter cross section 7-16
Filter Assembly Loop 7-17
Changing Filter Elements 7-18
Charge Circuit 7-19
Routine Maintenance 7-19
Changing Filter Elements 7-20
Charge Circuit 7-20
Charge Pressure 7-21
Set Charge Pressure – 350psi (24bar) 7-21
Charge Pumps 7-22
Charge Circuit Schematic 7-23
Main Pumps Circuit 7-24
Main Pumps Circuit 7-24
Right Track / Left Track / Rotation Pumps 7-25
Linde Hpv-02 Bi-directional Variable Displacement Closed Loop Pump 7-25
Dimensions 7-27
Operational Parameters 7-28
Linde HPV-02 Pump Schematic 7-29
Controls 7-30
Hydraulic Piston Pumps – Removal and Replacement 7-33
Main Pumps 7-33
EP (24V DC) Control 7-33
Main Pump Adjustments 7-34
Technical Data 7-35
Setting Linde HPV-02 Main pumps – Neutral Setting 7-36
Setting Linde HPV-02 Main pumps – Pressure Settings 7-37
Setting Linde HPV-02 Main pumps – Pre-setup Checks 7-38
Main Pumps Linde HPV-02 7-39
Setting Procedure 7-40
Diverter Valve 7-41
Closed Loop Pump Circuit 7-41
Operation 7-41
Diverter Valve 7-41
Rotation Circuit 7-42
Basic Rotation Circuit 7-42
Rotation Circuit Schematic 7-43
Rotation Circuit 7-44
Tram Circuit 7-45
Tram circuit – Two Speed 7-45
Tram Circuit Schematic 7-46
Brake Test Procedure 7-47
Rotary Drive Gearbox Motor 7-48
Variable Displacement Rotation Motor 7-48
Pilot Control Manifold 7-52
Pilot Control Manifold 7-52
Pilot Control Manifold Assembly 7-53
Control Valve Assembly 7-54
Electro Proportional Valves 7-61
Proportional Valve set-up 7-62
Auto Pulldown Card 7-62
Torque Control 7-63
Proportional Pulldown 7-64
OEM Controllers / EP Levers 7-65
Auxiliary Pump Circuit 7-66
Feed and Auxiliary Pump Circuit 7-66
Linde HPR-02 Self-Regulating Pump 7-67
Auxiliary Pump Circuit Schematic 7-68
Feed and Auxiliary Functions Pump 7-69
Linde HPR-02 Self-Regulating Pump 7-70
Hydraulic Piston Pumps – Removal and Replacement 7-71
Auxiliary Circuit 7-73
Auxiliary Circuit Functions 7-73
Auxiliary Valves 7-75
Jack Control and Mast Elevating Circuit 7-78
Jack Control and Mast Elevating Circuit Schematic 7-78
Jack Control and Mast Elevating Control Valve 7-79
Jack Control and Mast Elevating Circuit 7-80
Counterbalance Valves 7-81
Counterbalance Valve Adjustments 7-81
Internal Counterbalance Valve 7-82
Levelling Jack Cylinders 7-84
Jack Leg Cylinder 7-84
Counterbalance Valve Test Procedure 7-84
Mast Elevating Cylinders 7-85
Mast Elevating Cylinders 7-85
Hydraulic Operated Breakout Wrench 7-86
H O B O Wrench 7-86
Setting of H O B O Sequence Valves 7-87
H o b o Float Valve 7-87
Hydraulic Feed Circuit 7-88
Hydraulic Feed Circuit 7-88
Hoist and Pulldown Control 7-90
Directional Control Valve MP22 7-90
Hoist / Pulldown Circuit Schematic 7-92
Feed Valve Assembly 7-93
Feed Valve Assembly 7-93
Control Valve Assembly 7-95
Technical Data 7-95
BI620402
Bucyrus International, Inc ®
November, 10 Version 1 Int-15 SKF-98 Introduction
Contents
Cooler Fan Circuit 7-97
Cooler Fan Circuit 7-97
Setting Cooler Fan Speed 7-97
Hydraulic cooler – Thermal valve 7-99
Basic Cooler Fan Circuit 7-100
Cooler Fan Motor 7-101
Cooler Fan Motor Assembly 7-101
Hydraulic Motor 7-102
Water Pump Motor 7-105
Water Pump Motor Repair Information 7-105
Shaft Seal Repair 7-106
Hydraulic Cylinder Repair 7-109
Hydraulic Cylinders 7-109
General Information 7-110
H Head 7-112
N Head 7-113
Z Head 7-114
Z Head (Two Piece) 7-115
K Head 7-116
M Head 7-117
Z Piston 7-118
Z Piston (Threaded) 7-119
H and K Piston 7-120
M Piston 7-121
N Piston 7-124
Notes 7-125
Section 8 – Electrical Components 8-1
Section 8 Contents 8-3
Electrical Locator 8-5
Electrical Component Location 8-5
Jump Starting 8-8
Jump Starting 8-8
Batteries 8-10
Batteries 8-10
Welding Precautions 8-11
Welding Precautions 8-11
Electrical Components 8-12
Electrical Circuits 8-12
Transducers 8-12
EP Levers 8-13
Joystick Adjustments 8-14
Vigilante Guide 8-16
Important Information 8-16
Touchscreen 8-20
Laser Depth System 8-21
Start-up and Shutdown 8-24
Hydraulic Function Enable 8-24
Alarms 8-24
Solenoid Control 8-25
Auto Lube 8-27
Gauges 8-28
Level Switches 8-30
Dust Suppression 8-30
Acknowledgements 8-30
Disclaimers 8-31
Notes 8-32
N B: For further information on specific electronic components, please refer to
Vendor Documents in Table of Contents on Service Manual CD
Section 9 – Lubrication and Preventive Maintenance 9-1
Section 9 Contents 9-3
Central Lube System 9-5
Auto Lube Basic Operation 9-5
Central Lube Tank Assembly 9-6
Auto Lube Grease Pump 9-7
Auto Lube Tube Pump 9-13
Graco Vent Valve 9-18
Central Lube System Circuit 9-19
Basic Operational Principles of Auto Lube Injectors 9-20
SL-V and SL-V XL Injectors 9-20
SL-1 and Sl-11 Injectors 9-21
SL-32 Injectors 9-22
Typical Grease System Circuit 9-23
First 50 Hours Service 9-24
Lube Faults / Operation 9-25
Auto Lube Timer 9-26
Lube Pressure Screen 9-26
Air Service Units 9-27
Filter Regulator 9-27
Air Line Oiler 9-28
Soft Start Dump Valve 9-29
Air Service Unit 9-30
Pipe Thread Lubricator 9-31
Air Operator Pipe Thread Pump 9-31
Filter Locator 9-39
Filter Locator Assembly 9-39
Lubrication and Preventive Maintenance 9-40
General Lubrication 9-40
Equipment Lubrication 9-40
Care of Lubrication Points 9-40
Safety 9-41
Isolation Battery Switch 9-42
Track Gear 9-43
Engine Maintenance 9-44
Engine Fuel System – QSK19 Tier II Modular Common Rail Fuel System
(MCRS) Installation Requirements 9-45
Installation and Operation Recommendations 9-45
Fuel Filter (Stage 1) 9-47
Fuel Filter (Stage 2) 9-51
Air Cleaners 9-54
Air Filter Elements 9-54
Alternator Maintenance 9-54
Pump Drive and Drive Shaft Maintenance 9-55
Compressor Maintenance 9-55
Cooler Packs 9-55
A-frame and Pivot Point Maintenance 9-57
Pull Down and Hoist Ropes and Sheaves Maintenance 9-57
Rotary Head Maintenance 9-57
Hydraulic System Maintenance 9-59
Hydraulic Maintenance 9-59
Water Pump Maintenance 9-59
Cab Maintenance 9-59
Air Conditioner Maintenance 9-61
Battery Maintenance 9-61
Lubrication System Maintenance 9-61
Fire Suppression Maintenance 9-61
Drill Folding Stairway – Inspection Requirements 9-63
Weld Inspection Schedule 9-64
Weld Inspection Schedule SK Series 9-64
Track and Sprocket Inspection 9-65
Track Inspection and Wear Limit Guide 9-65
Sprocket Wear Patterns 9-70
Lubrication Recommendations 9-76
Lubrication Recommendations 9-76
Lubrication and Maintenance Chart – 250hr 9-77
Lubrication and Maintenance Chart – 500hr 9-87
Lubrication and Maintenance Chart – 1000hr 9-98
Lubrication and Maintenance Chart – 2000hr 9-109
Lubricant Specifications 9-121
Hydraulic System 9-121
Hydraulic Tank Capacity 9-121
Compressor Lubrication 9-122
Compressor Lubricant Specifications 9-122
Lubricating Grease 9-123
Gear Lubricant 9-123
Scheduled Oil Sampling Analysis 9-123
Torque Values for Split Flange Connections 9-124
Torque Values for Split Flange Connections 9-124
Procedure No 1-87 Revision A 9-126
Notes
Contact us: [email protected]
https://vimeo.com/864272658?share=copy
PLEASE NOTE:
- This is the SAME exact manual used by your dealers to fix your vehicle.
- The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
- Any queries / doubts regarding your purchase, please feel free to contact [email protected]
S.M
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Cat 216 226 228 236 246 248 Wiring Electrical Schematics Manual - Pdf Download

CAT Bucyrus RH120E Hydraulic Shovel Parts Catalog Manual BI015166 - PDF DOWNLOAD

CAT Bucyrus RH120E Hydraulic Shovel Spare Parts Catalog Manual BI015184 - PDF DOWNLOAD
