★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately
Sale!

Challenger 670 Combine Repair Time Schedule Manual – PDF DOWNLOAD

Original price was: $89.95.Current price is: $19.95.

Challenger 670 Combine Repair Time Schedule Manual – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Challenger 670 Combine Repair Time Schedule Manual – PDF DOWNLOAD

IMAGES PREVIEW OF THE MANUAL:

Challenger 670 Combine Repair Time Schedule Manual - PDF DOWNLOAD
Challenger 670 Combine Repair Time Schedule Manual – PDF DOWNLOAD
Challenger 670 Combine Repair Time Schedule Manual - PDF DOWNLOAD
Challenger 670 Combine Repair Time Schedule Manual – PDF DOWNLOAD

DESCRIPTION:

Challenger 670 Combine Repair Time Schedule Manual – PDF DOWNLOAD

A. TIME ALLOWANCE :

The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained Dealer mechanic, of normal ability has taken to carry out the operation in a typical Dealership, using standard workshop tooling and equipment including air tools, located for reasonable access and working conditions. They DO NOT include any traveling to or from the farm or site.

  • The machine is assumed to be clean and to be bare of any extra equipment or attachment of non “AGCO” manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available.
  • The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended tools shown in the workshop manual. The times are based on a second hand machine in reasonable condition properly maintained using approved parts.
  • Extra time may be required to deal with seized, rusted or damaged parts. Allowances are included in the operation times quoted for obtaining all tools and parts, cleaning and testing after repair. Diagnostic time is included in the time allowance unless a separate code is listed for diagonistic time. The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediate operations.

B.TIMES :

All the operating times are presented in hours and the decimal parts of an hour. Decimal times must be used on all warranty claims. The times given in this repair time schedule are for a complete job from start to finish. Where access has been gained for an adjacent repair only the additional time for the second repair will be accepted and not the total time for the two failures.

TABLE OF CONTENTS:

Challenger 670 Combine Repair Time Schedule Manual – PDF DOWNLOAD

INDEX
CHALLENGER 670 COMBINE
ACCESSORIES
BEACON LIGHT178
CAB
AIR CONDITIONER COMPRESSOR (SANDEN) 42
AIR CONDITIONER LINES 41
BRAKE MASTER CYLINDER 31
CONTROL PARK BRAKE & HYDRO PROPEL CABLE 32
CONTROL SERVICE BRAKES 30
CONTROL STEERING COLUMN33
DECK EXTENSION 145″ TREAD AND DUALS 25
FRAME & MOUNTING 19
HEATER LINES43
HVAC BLOWER ASY EVANS TEMPCON 40
HVAC CONTROL PANEL 38
HVAC PRESSURIZER UNIT & DUCTING37
HVAC PRESSURIZER UNIT EVANS-TEMPCON 39
INTERIOR COVERINGS & TRIM LOWER AND REAR 23
INTERIOR COVERINGS & TRIM UPPER AND FRONT 22
LH DOOR INTERIOR & EXTERIOR HANDLES 21
MIRRORS & EXTREMITY LIGHTS MANUAL & ELECTRIC ADJUST 27
PIVOTING LADDER LH 24
ROOF & INTERIOR/EXTERIOR LIGHTS 29
SEAT BASE & SUSPENSION 35
SEAT CUSHION AND BACKREST 36
SEAT OPERATOR & INSTRUCTOR 34
STAIRCASE LADDER & PLATFORM 26
WINDOWS AND DOORS 20
WINDSHIELD WIPER 28
CHOPPER & SPREADER
CHAFF SPREADER FAN HOUSING, REKORD 103
CHAFF SPREADER HYDRAULIC DRIVE 102
CHAFF SPREADER HYDRAULICS, REKORD104
JACKSHAFT DRIVE 95
STRAW CHOPPER DRIVE 96
STRAW CHOPPER DRIVE KIT HEAVY DUTY 97
STRAW CHOPPER HOUSING REDEKOP 98
STRAW CHOPPER ROTOR 99
STRAW SPREADER COMPONENTS 101
STRAW SPREADER DRIVE 100
DRIVES
BELTS LEFT 175
BELTS RIGHT 176
CHAINS DRIVE177
ELECTRICAL
BEACON LIGHTS FIELD KIT 55
CAB COMPONENTS CONTROLS & SWITCHES 48
CAB COMPONENTS FUSE PANEL & HYDRO HANDLE 49
CAB COMPONENTS RADIO AND ANTENNA 51
CAB COMPONENTS UPPER CONSOLE 50
ELECTRICAL HARNESSES & SWITCHES FRONT 45
ELECTRICAL HARNESSES REAR54
ENGINE & BATTERY WIRING (EFF S/N HR36101) 47
ENGINE & BATTERY WIRING (PRIOR S/N HR36101)46
FEEDER ELECTRICAL44
HARNESSES & LIGHTING GRAIN BIN 53
HIGH INTENSITY LIGHTING FIELD KIT 56
MONITORING SYSTEMS DIGITAL TACHOMETER 52
ENGINE
AIR INTAKE & EXHAUST 11
COOLING FAN DRIVE (TIER 2 ENG PRIOR S/N HP36176) 8
CHALLENGER 670 COMBINE
ENGINE (CONTINUED)
COOLING FAN DRIVE (TIER 3 ENGINE) (EFF S/N HP36— PROD’N MID-RUN)10
COOLING FAN DRIVE (TIER 3 ENGINE) (EFF S/N HP36176 THRU PROD’N MID-RUN) 9
COOLING SYSTEM 13
ENGINE & MOUNTS 7
FUEL LINES (EFF S/N HP36101) 18
FUEL LINES (PRIOR S/N HP36101)17
MAIN ENGINE DRIVES 12
RADIATOR SLINGER 14
ROTARY SCREEN DOOR & SCREEN15
ROTARY SCREEN MOTOR & DRIVE16
FEEDER
CONVEYOR (EFF S/N HP36101) 72
CONVEYOR (PRIOR S/N HP36101) 71
COUNTERSHAFT HEADER DRIVE (PRIOR S/N HP36101) 68
COUNTERS HAFT VARIABLE & FIXED SPEED HEADER DRIVE (EFF S/N HP36101) 69
FEED FLOOR59
HEADER REVERSER DRIVE & HYDRAULICS (EFF S/N HP36101) 74
HEADER REVERSER LINES & FITTINGS (PRIOR S/N HP36101) 73
HOUSING & SHIELDS (EFF S/N HP36101) 58
HOUSING & SHIELDS (PRIOR S/N HP36101) 57
HYDRAULIC LINES VS HEADER DRIVE (EFF S/N HP36101) 66
JACKSHAFT & C’SHAFT DRIVE IDLER FIXED SPEED HEADER DRIVE (EFF S/N HP36101) 67
JACKSHAFT & VS IDLER VS HEADER DRIVE (EFF S/N HP36101) 65
JACKSHAFT DRIVE RH FEEDERHOUSE (EFF S/N HP36101) 64
LATCH HEADER 70
LH PIVOT DRIVE (EFF S/N HP36101) 62
PIVOT SHAFT (EFF S/N HP36101) 61
PIVOT SHAFT (PRIOR S/N HP36101) 60
REVERSER MOTOR & CLUTCH COMPONENTS (PRIOR S/N HP36101) 75
REVERSER MOTOR CLUTCH HOUSING & SHAFT ASSEMBLY (EFF S/N HP36101) 76
REVERSER MOTOR TORQUE MOTOR ASY (EFF S/N HP36101) 77
RH DRIVE (PRIOR S/N HP36101) 63
GRAIN BIN & ELEVATOR
FUEL TANKS 127
GRAIN BIN LOWER STRUCTURE125
GRAIN BIN UPPER STRUCTURE & MOUNTS 126
GRAIN ELEVATOR BIN FILL AUGER 114
GRAIN ELEVATOR HEAD ASSEMBLY 113
GRAIN ELEVATOR LOWER 112
RETURN ELEVATOR DRIVE 119
RETURN ELEVATOR LOWER (EFF S/N HP36101) 116
RETURN ELEVATOR LOWER (PRIOR S/N HP36101) 115
RETURN ELEVATOR UPPER 117
STAINLESS STEEL ELEVATOR PACKAGE RICE 118
UNLOADER DRIVE 124
UNLOADING AUGER LOWER 120
UNLOADING AUGER UPPER 123
UNLOADING AUGER VERTICAL EFFECTIVE S/N HN36101 122
UNLOADING AUGER VERTICAL PRIOR S/N HN36101 121
HYDRAULICS
ACCUMULATOR PARKER 136
CONTROL VALVE STACK140
FEEDER REVERSER VALVE 143
HEADER LIFT CYLINDERS137
HEADER LIFT VALVE 141
HYDRAULIC PUMP 149
HYDRAULIC PUMP & LINES 148
PRIORITY VALVE 139
REEL DRIVE VALVE 145
REEL LIFT VALVE 142
INDEX
CHALLENGER 670 COMBINE
HYDRAULICS (CONTINUED)
RESERVOIR & FILTER153
ROTARY SCREEN MOTOR LINES 147
ROTARY SCREEN VALVE & MOTOR 146
ROTOR PUMP AND MOTOR LINES 154
STEERING & HEADER FUNCTIONS 132
STEERING CYLINDER RWA AXLE 135
STEERING CYLINDER STD ADJUSTABLE AXLE (EFF S/N HP36101) 134
STEERING CYLINDER STD ADJUSTABLE AXLE (PRIOR S/N HP 36101) 133
UNLOADER ENGAGE LINES (EFF S/N HP36101)151
UNLOADER ENGAGE LINES (PRIOR S/N HP36101) 150
UNLOADER ENGAGE VALVE 152
UNLOADER SWING CYLINDER138
UNLOADER SWING VALVE 144
LATERAL TILT
ANCHORS & SENSOR 79
HOUSING78
HYDRAULICS80
VALVE & CONTROL 81
PROCESSOR
CONCAVE & CONTROLS 87
FRONT BEATER 82
FRONT BEATER DRIVE AND IDLER 85
INLET HOUSING AND STONE TRAP 86
MAIN COUNTERSHAFT 83
MAIN COUNTERSHAFT DRIVE AND IDLER 84
MOTOR, HYDROSTATIC ROTOR 94
POWER CONCAVE CONTROL 88
REAR ROTOR HOUSING 89
ROTOR 91
ROTOR DRIVE 2-SPEED GEARBOX 93
ROTOR DRIVE GEARBOX SHIFT LINKAGE 92
SEPARATOR GRATES 90
SEPARATOR
GRAIN ELEVATOR DRIVE (EFF S/N HP36101) 111
GRAIN ELEVATOR DRIVE (PRIOR S/N HP36101) 110
LOWER AUGER HOUSING AND FANNING MILL 105
PITMAN DRIVE 109
SEPARATOR PAN 107
SHAKER SHOE AND SIEVES 108
VARIABLE SPEED FAN DRIVE 106
SHIELDS
ENGINE COVERS 128
MUD SHIELDS LEFT SIDE (EFF S/N HP36101) 131
MUD SHIELDS RIGHT SIDE 130
SIDE SHIELDS RIGHT SIDE 129
TRANSMISSION & AXLES
DRUM BRAKES SERVICE & PARKING 168
FINAL DRIVE 4″ AXLE RISERS 163
FINAL DRIVE S39 162
MAIN FRAME AND AXLE SUPPORTS 169
MOTOR, HYDRO PROPEL COMPONENTS 157
PROPEL PUMP COMPONENTS, 1 OF 4 155
PROPEL PUMP COMPONENTS, 4 OF 4 156
REAR AXLE & WHEELS ADJUSTABLE TREAD (EFF S/N HP36101) 171
REAR AXLE & WHEELS ADJUSTABLE TREAD (PRIOR S/N HP36101) 170
REAR AXLE & WHEELS REAR WHEEL ASSIST 172
REAR WHEEL ASSIST SELECTOR VALVE & FLOW DIVIDER 174
REAR WHEEL ASSIST WHEEL MOTOR UNIT 173
ROTOR PUMP FRONT, 1 OF 4 159
CHALLENGER 670 COMBINE 6
INDEX
TRANSMISSION & AXLES (CONTINUED)
ROTOR PUMP FRONT, 4 OF 4 160
ROTOR PUMP REAR, 4 OF 4 161
ROTOR PUMPS TANDEM PUMP 158
TRANSMISSION, GEAR DIFFERENTIAL 167
TRANSMISSION, GEAR INPUT SHAFT & GEARS 165
TRANSMISSION, GEAR INTERMEDIATE & MAIN SHAFT 166
TRANSMISSION, GEAR PRESSURE LUBE & HYDRO MOTOR164

CHALLENGER 670 COMBINE REPAIR TIME SCHEDULE MANUAL – PDF DOWNLOAD:

PLEASE NOTE:

  • This is the same manual used by the DEALERSHIPS to SERVICE your vehicle.
  • The manual can be all yours – Once payment is complete, you will be taken to the download page from where you can download the manual. All in 2-5 minutes time!!
  • Need any other service / repair / parts manual, please feel free to contact us at heydownloadss @gmail.com . We may surprise you with a nice offer

S.V

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order