Challenger EU Harvesting DHW Draper Header Repair Time Schedule Manual 79034451B
$89.95 Original price was: $89.95.$19.95Current price is: $19.95.
Challenger EU Harvesting DHW Draper Header Repair Time Schedule Manual 79034451B – PDF DOWNLOAD
Form Number 79034451 B Rev.
Description
Challenger EU Harvesting DHW Draper Header Repair Time Schedule Manual 79034451B – PDF DOWNLOAD
CHALLENGER EU HARVESTING DHW DRAPER HEADER REPAIR TIME SCHEDULE MANUAL 79034451B:
IMAGES PREVIEW OF THE MANUAL:
DESCRIPTION:
Challenger EU Harvesting DHW Draper Header Repair Time Schedule Manual 79034451B – PDF DOWNLOAD
Form Number 79034451 B Rev.
A. TIME ALLOWANCE :
The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained dealer mechanic, of normal ability has taken to carry out the operation in a typical dealership, using standard workshop tooling and equipment including air tools, located for reasonable access and working conditions. They DO NOT include any traveling to or from the farm or site. The machine is assumed to be clean and to be bare of any extra equipment or attachment of non “AGCO” manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available.
- The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended tools shown in the workshop manual. The times are based on a second hand machine in reasonable condition properly maintained using approved parts.
- Extra time may be required to deal with seized, rusted or damaged parts. Allowances are included in the operation times quoted for obtaining all tools and parts, cleaning and testing after repair. Diagnostic time is included in the time allowance unless a separate code is listed for diagonistic time. The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediate operations.
B.TIMES :
- All the operating times are presented in hours and the decimal parts of an hour. Decimal times must be used on all warranty claims. The times given in this repair time schedule are for a complete job from start to finish. Where access has been gained for an adjacent repair only the additional time for the second repair will be accepted and not the total time for the two failures.
- All times contained in this schedule are based on the latest information available at the time of this publication. The right is reserved to publish revision at any time. All operation times are subject to amendment if the d esign, method or technique changes result in alteration of time taken.
TABLE OF CONTENTS:
Challenger EU Harvesting DHW Draper Header Repair Time Schedule Manual 79034451B – PDF DOWNLOAD
Description
Drives
Electrical
Sickle
Draper
Frame and Shields
Hydraulics
Decals and Kits
PLEASE NOTE:
- This is the same manual used by the dealers to diagnose and troubleshoot your vehicle
- You will be directed to the download page as soon as the purchase is completed. The whole payment and downloading process will take anywhere between 2-5 minutes
- Need any other service / repair / parts manual, please feel free to contact [email protected]. We still have 50,000 manuals unlisted
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Challenger 874 1074 1274 Rogator Liquid System Row Crop Chassis Parts Manual - PDF DOWNLOAD

Challenger DKHC Rotary Header Conditioner-Roller Parts Manual - PDF DOWNLOAD

Challenger Massey Ferguson MT 600B Series MT 655 665B Parts Manual




