Challenger EU Hay Equipment 9195 9196 DKHE DKHET Rotary Disc Header Repair Time Schedule Manual 79034796B
$98.95 Original price was: $98.95.$19.95Current price is: $19.95.
Challenger EU Hay Equipment 9195 9196 DKHE DKHET Rotary Disc Header Repair Time Schedule Manual 79034796B – PDF DOWNLOAD
Description
Challenger EU Hay Equipment 9195 9196 DKHE DKHET Rotary Disc Header Repair Time Schedule Manual 79034796B – PDF DOWNLOAD
IMAGES PREVIEW OF THE MANUAL:
DESCRIPTION:
Challenger EU Hay Equipment 9195 9196 DKHE DKHET Rotary Disc Header Repair Time Schedule Manual 79034796B – PDF DOWNLOAD
A. TIME ALLOWANCE:
The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained dealer mechanic, of normal ability has taken to carry out the operation in a typical d ealership, using stand and workshop tooling and equipment including air tools, located for reasonable access and working conditions. They DO NOT include any traveling to or from the farm or site.
- The machine is assumed to be clean and to be bare of any extra equipment or attachment of non “AGCO” manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perbrm the operations are immediately available. The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended tools shown in the workshop manual.
- The times are based on a second hand machine in reasonable condition properly maintained using approved parts. Extra time may be required to deal with seiz ed, rusted or damaged parts. Allowances are included in the operation times quoted for obtaining all tools and par ts, cleaning and testing after repair. Diagnostic time is included in the time allo.vance unless a separate code is listed for diagonistic time. The times given in this Repair Time Schedule are for a complete job from start to finish, including allONances for intermediate operations.
B.TIMES :
All the operating times are presented in hours and the decimal parts of an hour. Decimal times rrust be used on all warranty claims. The times given in this repair time schedule are for a complete job from start to finish. Where access has been gained for an adjacent repair only the additional time for the second repair will be accepted and not the total time for the two failures.
TABLE OF CONTENTS:
Challenger EU Hay Equipment 9195 9196 DKHE DKHET Rotary Disc Header Repair Time Schedule Manual 79034796B – PDF DOWNLOAD
Drives
Cutter
Electrical
Hay Conditioner
Frame and Shields
Hydraulics
Decal and Kits
CHALLENGER EU HAY EQUIPMENT 9195 9196 DKHE DKHET ROTARY DISC HEADER REPAIR TIME SCHEDULE MANUAL 79034796B:
PLEASE NOTE:
- This is the SAME manual used by the dealers to troubleshoot any faults in your vehicle. This can be yours in 2 minutes after the payment is made.
- Contact us at [email protected] should you have any queries before your purchase or that you need any other service / repair / parts operators manual.
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Challenger MT 600B Series MT 655 665B Techstar CVT Parts Manual - PDF DOWNLOAD

Challenger MT700B Series Track Tractors Parts Manual - PDF DOWNLOAD

Challenger PH13 PH15 Pickup Header Parts Manual - PDF DOWNLOAD



