Challenger RG900 RG1100 RG1300 Rogator Liquid System Repair Time Schedule Manual
$98.95 Original price was: $98.95.$22.95Current price is: $22.95.
Challenger RG900 RG1100 RG1300 Rogator Liquid System Repair Time Schedule Manual – PDF DOWNLOAD
Description
Challenger RG900 RG1100 RG1300 Rogator Liquid System Repair Time Schedule Manual – PDF DOWNLOAD
CHALLENGER RG900 RG1100 RG1300 ROGATOR LIQUID SYSTEM REPAIR TIME SCHEDULE MANUAL:
IMAGES PREVIEW OF THE MANUAL:
FILE DETAILS:
Challenger RG900 RG1100 RG1300 Rogator Liquid System Repair Time Schedule Manual – PDF DOWNLOAD
Size: 15.9 MB
Format: PDF
Language: English
Brand: Challenger
Type of Machine: Applicators
Type of document: Repair Time Schedule
Model: Challenger EU RoGator RG900 RG1100 RG1300 Row Crop Liquid System
Number of Pages: 476 pages
Part Number: 558138D1A
Date Modified: 08/2011
DESCRIPTION:
Challenger RG900 RG1100 RG1300 Rogator Liquid System Repair Time Schedule Manual – PDF DOWNLOAD
A.TIME ALLOWANCE :
The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained Dealer mechanic, of normal ability has taken to carry out the operation in a typical Dealership, using standard workshop tooling and equipment, located for reasonable access and working conditions. They DO NOT include any travelling to or from the farm or site.
- The machine is assumed to be clean and to be bare of any extra equipment or attachment of non AGCO manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available. The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended Special Tools shown in the workshop manual.
- The times are based on a second hand machine in reasonable condition properly maintained using approved parts. Extra time may be required to deal with seized, rusted or damaged parts, which must be claimed for separately when carrying out warranty work.
- Allowances are included in the operation times quoted for setting up the machine in the workshop, obtaining all tools and parts, cleaning and testing after repair.
- Time required to remove and install mounted implements, such as loaders, hedge cutters, etc., which interfere with performing a specific job is NOT INCLUDED in the time allowed. The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediated operations.
TABLE OF CONTENTS:
Challenger RG900 RG1100 RG1300 Rogator Liquid System Repair Time Schedule Manual – PDF DOWNLOAD
01 Tank and Saddle Group
02 Product Pump & Pressure
Plumbing Group
03 Boom Group
04 Boom Plumbing Group
05 Hydraulic Group
06 Electric Group
07 Air System Group
08 Foam Marker Group
09 Controller Group
10 Option Group
PLEASE NOTE:
- This is the SAME exact manual used by your dealers to fix your vehicle.
- The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
- Any queries / doubts regarding your purchase, please feel free to contact [email protected]
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Challenger 1074C Rogator Chassis Row Crop Chassis Parts Manual - PDF DOWNLOAD

Challenger MT700B Series Track Tractors Parts Manual - PDF DOWNLOAD

Challenger MT700 Series Track Tractors Parts Manual - PDF DOWNLOAD




