Claas Tractors ARION EN Time Schedule Manual – PDF DOWNLOAD
Original price was: $67.00.$20.95Current price is: $20.95.
Claas Tractors ARION EN Time Schedule Manual – PDF DOWNLOAD
Description
Claas Tractors ARION EN Time Schedule Manual – PDF DOWNLOAD
DESCRIPTION:
Claas Tractors ARION EN Time Schedule Manual – PDF DOWNLOAD
INTRODUCTION TO THE REPAIR TIME SCHEDULE
This document is intended for the CLAAS dealer network and gives the time required to carry out maintenance/repair operations on the ARION from 400 to 600C range of tractors, these times are broken down as follows:
ยท Dem: time required to remove a component
ยท Rep: time required to refit a component
ยท Adj: time required for inspection/adjustment
ยท Total: overall removal/replacement/inspection/adjustment time for a given operation
ยท lnd: this column enables the insertion of an index referring to a note at the end of the time schedule
Times are expressed in hundredths of an hour rounded to the nearest ยผ of an hour. No operation therefore takes less than 0.25 H. The times given apply to the ARION from 400 to 600C range for operations carried out in accordance with the methods recommended in the repair manual. Any operation where times differ will be identified either by an index: A, B, C, D.
TABLE OF CONTENTS:
Claas Tractors ARION EN Time Schedule Manual – PDF DOWNLOAD
01 Engine accessories
02 Engine
03 Clutches
041 “HEXASHIFT” and
“QUADRISHIFT” gearbo
05 Rear axle
06 Brakes
07 Linkage
08 Hitch
09 Hydraulic systems
10 Powered front axle
101 Floating powered front axle 2029
102 Floating powered front axle 2025
11 Cab sheet metal trim
12 Electronic equipment
13 Electrical equipment
14 Front Axle – Tyres – Wheels
15 Driven components
IMAGES PREVIEW OF THE MANUAL:

PLEASE NOTE:
- This is the same manual used by the DEALERSHIPS to SERVICE your vehicle.
- The manual can be all yours – Once payment is complete, you will be taken to the download page from where you can download the manual. All in 2-5 minutes time!!
- Need any other service / repair / parts manual, please feel free to contact us atย [email protected]ย . We may surprise you with a nice offer
S.M



