Claas Tractors AXOS 300 EN Time Schedule Manual – PDF DOWNLOAD
Original price was: $78.00.$20.95Current price is: $20.95.
Claas Tractors AXOS 300 EN Time Schedule Manual – PDF DOWNLOAD
Description
Claas Tractors AXOS 300 EN Time Schedule Manual – PDF DOWNLOAD
DESCRIPTION:
Claas Tractors AXOS 300 EN Time Schedule Manual – PDF DOWNLOAD
INTRODUCTION TO THE REPAIR TIME SCHEDULE
This document is intended for the CLAAS dealer network and gives the time required to carry out maintenance/repair operations on the AXOS from 31 O to 340 range of tractors, these times are brokendown as follows:
Β· Dem: time required to remove a component
Β· Rep: time required to refit a component
Β· Adj: time required for inspection/adjustment
Β· Total: overall removal/replacement/inspection/adjustment time for a given operation
Β· lnd: this column enables the insertion of an index referring to a note at the end of the time schedule.
limes are expressed in hundredths of an hour rounded to the nearest ΒΌ of an hour. No operation therefore takes less than 0.25 H. The times given apply to the AXOS from 31 O to 340 range for operations carried out in accordance with the methods recommended in the repair manual. Any operation where times differ will be identified either by an index: A, B, C, D.
TABLE OF CONTENTS:
Claas Tractors AXOS 300 EN Time Schedule Manual – PDF DOWNLOAD
01 Engine accessories
02 Engine
03 Clutches
04 “HEXASHIFT” Gearbox
05 Rear axle
06 Brakes
07 Linkage
08 Hitch
09 Hydraulic systems
10 Powered front axle
11 Cab sheet metal trim
12 Electronic equipment
13 Electrical equipment
14 Front Axle – Tyres – Wheels
15 Driven components
IMAGES PREVIEW OF THE MANUAL:

PLEASE NOTE:
- This is the same manual used by the DEALERSHIPS to SERVICE your vehicle.
- The manual can be all yours – Once payment is complete, you will be taken to the download page from where you can download the manual. All in 2-5 minutes time!!
- Need any other service / repair / parts manual, please feel free to contact us atΒ [email protected]Β . We may surprise you with a nice offer
S.M



