Class Forage Harvesters DIRECT DISC 520 Comfort JAGUAR 900 890 870 850 830 Typ 493 Time Schedule Manual FR DE EN RU
Original price was: $78.00.$19.95Current price is: $19.95.
Class Forage Harvesters DIRECT DISC 520 Comfort JAGUAR 900 890 870 850 830 Typ 493 Time Schedule Manual FR DE EN RU
Description
Class Forage Harvesters DIRECT DISC 520 Comfort JAGUAR 900 890 870 850 830 Typ 493 Time Schedule Manual FR DE EN RU
DESCRIPTION:
Class Forage Harvesters DIRECT DISC 520 Comfort JAGUAR 900 890 870 850 830 Typ 493 Time Schedule Manual FR DE EN RU
CLAAS assembly time schedules are a valuable tool for all CLAAS dealers for determining costs. They also make it possible to prepare preliminary cost estimates for larger scale repairs and provide you with an indispensable aid for scheduling overhaul work on CLAAS machinery which you have sold. Essential components for achieving the listed assembly time schedules are a well equipped workshop and service department vehicle, the complete kit of CLAAS special tools and well trained specialist fitters with CLAAS experi- ence.
- ย To determine these assembly time schedules, the work procedures involved for all items were carried out on the whole machine. That is to say, all time schedules are absolute net values, which also take account of the time required for possible preassembly work (removing protective guards, jacking or raising machinery) and, where necessary, the time for a second fitter.
- Only those tools and auxiliary materials commonly found in any workshop have been used, such as assembly stands, a hoist and a jack.
- Set-up times involving cleaning machinery, assembling tools and auxiliary equipment and spare parts have not been taken into consideration.
- The structure of the time schedule list is based on assembly groups and individual items which correspond to the illustrations shown in the spare parts list, so that individual items, which are listed by name, can be quickly identified.
FILE DETAILS:
Class Forage Harvesters DIRECT DISC 520 Comfort JAGUAR 900 890 870 850 830 Typ 493 Time Schedule Manual FR DE EN RU
Language : FR DE EN RU
Pages :36
Downloadable : Yes
File Type : PDF
Size:1.76 mb
IMAGES PREVIEW OF THE MANUAL:

PLEASE NOTE:
- This is the SAME exact manual used by your dealers to fix your vehicle.
- The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
- Any queries / doubts regarding your purchase, please feel free to contactย [email protected]
S.M



