Class Tractors ARES ARES 506/606 507/607 range RepairTime Schedule Manual – PDF DOWNLOAD
Original price was: $78.00.$19.95Current price is: $19.95.
Class Tractors ARES ARES 506/606 507/607 range RepairTime Schedule Manual – PDF DOWNLOAD
Description
Class Tractors ARES ARES 506/606 507/607 range RepairTime Schedule Manual – PDF DOWNLOAD
DESCRRIPTION:
Class Tractors ARES ARES 506/606 507/607 range RepairTime Schedule Manual – PDF DOWNLOAD
INTRODUCTION TO THE REPAIR TIME SCHEDULE
This document is intended for the CLAAS dealer network and gives the time required to carry out maintenance/repair operations on the ARES 506/606 507/607 range of tractors; these times are broken down as follows:
Β· Dep: time required to remove a component
Β· Rep: time required to refit a component
Β· Cr: time required for inspection/adjustment
Β· Total: overall removal/replacement/inspection/adjustment time for a given operation
Β· Ind: this column enables the insertion of an index referring to a note at the end of the time schedule.
Times are expressed in hundredths of an hour rounded to the nearest ΒΌ of an hour. No operation therefore takes less than 0.25 H. The times given apply to the ARES 506/606 507/607 range for operations carried out in accordance with the methods recommended in the repair manual. Any operation where times differ will be identified either by an index: A, B, C, D, or by an additional line headed 507/607. Any operation not identified by an index or by a supplementary line will require the same time for both 506/507 and 606/607 ranges
TABLE OF CONTENTS:
Class Tractors ARES ARES 506/606 507/607 range RepairTime Schedule Manual – PDF DOWNLOAD
Engine accessories
Engine
Clutches
Gearbox
“HEXASHIFT” gearbox
Rear axle
Brakes
Linkage
Hitch
Hydraulic systems
Powered front axle
Floating powered front axle
Cab sheet metal trim
Electronic equipment
Electrical equipment
Front Axle – Tyres – Wheels
Driven components
IMAGES PREVIEW OF THE MANUAL:

PLEASE NOTE:
- This is the SAME exact manual used by your dealers to fix your vehicle.
- The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
- Any queries / doubts regarding your purchase, please feel free to contactΒ [email protected]
S.M



