Class Tractors AXION 800 EN Time Schedule Manual – PDF DOWNLOAD
Original price was: $78.00.$20.95Current price is: $20.95.
Class Tractors AXION 800 EN Time Schedule Manual – PDF DOWNLOAD
Description
Class Tractors AXION 800 EN Time Schedule Manual – PDF DOWNLOAD
DESCRIPTION:
Class Tractors AXION 800 EN Time Schedule Manual – PDF DOWNLOAD\
INTRODUCTION TO THE REPAIR TIME SCHEDULE
This document is intended for the CLAAS dealer network and gives the time required to carry out maintenance/repair operations on the AXION from 810 to 850 range of tractors, these times are brokendown as follows:
ยท Dem: time required to remove a component
ยท Rep: time required to refit a component
ยท ADJ: time required for inspection/adjustment
ยท Total: overall removal/replacement/inspection/adjustment time for a given operation
ยทIND: this column enables the insertion of an index referring to a note at the end of the time schedule.
Times are expressed in hundredths of an hour rounded to the nearest ยผ of an hour. No operation therefore takes less than 0.25 H. The times given apply to the AXION from 810 to 850 range for operations carried out in accordance with the methods recommended in the repair manual. Any operation where times differ will be identified either by an index: A, B, C, D.
TABLE OF CONTENTS:
Class Tractors AXION 800 EN Time Schedule Manual – PDF DOWNLOAD
01 Engine accessories
02 Engine
03 Clutches
04 “HEXASHIFT” Gearbox
05 Rear axle
06 Brakes
07 Linkage
08 Hitch
09 Hydraulic systems
10 Powered front axle
101 Floating powered front axle
11 Cab sheet metal trim
12 Electronic equipment
13 Electrical equipment
14 Front Axle – Tyres – Wheels
15 Driven
IMAGES PREVIEW OF THE MANUAL:

PLEASE NOTE:
- This is the same manual used by the dealers to diagnose and troubleshoot your vehicle
- You will be directed to the download page as soon as the purchase is completed. The whole payment and downloading process will take anywhere between 2-5 minutes
- Need any other service / repair / parts manual, please feel free to contactย [email protected]ย . We still have 50,000 manuals unlisted
S.M



