★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
๐Ÿข
Trusted Business
Verified & Licensed
๐Ÿ›ก๏ธ
Virus Free Files
100% Safe Downloads
๐Ÿ”’
Secure Payment
SSL Protected
โšก
Instant Delivery
Available Immediately
Sale!

CNH WE210B WX218 Wheeled Excavator GRAB ROTATION CONTROL KIT 22 L/MIN (6 US GPM) INSTALLATION INSTRUCTIONS MANUAL 47435440 EN_DE_FR_ES_IT – PDF DOWNLOAD

Original price was: $74.95.Current price is: $27.95.

CNH WE210B WX218 Wheeled Excavator GRAB ROTATION CONTROL KIT 22 L/MIN (6 US GPM) INSTALLATION INSTRUCTIONS MANUAL 47435440 EN_DE_FR_ES_IT – PDF DOWNLOAD

โšก
Instant PDF Download
Available immediately
๐Ÿ’พ
Save to Your Device
Download & keep forever
๐Ÿ›ก๏ธ
Antivirus Scanned
100% virus-free
๐ŸŒ
Trusted Worldwide
175,000+ customers

Description

CNH WE210B WX218 Wheeled Excavator GRAB ROTATION CONTROL KIT 22 L/MIN (6 US GPM) INSTALLATION INSTRUCTIONS MANUAL 47435440 EN_DE_FR_ES_IT – PDF DOWNLOAD

DESCRIPTION:

CNH WE210B WX218 Wheeled Excavator GRAB ROTATION CONTROL KIT 22 L/MIN (6 US GPM) INSTALLATION INSTRUCTIONS MANUAL 47435440 EN_DE_FR_ES_IT – PDF DOWNLOAD

47435385 – GRAB ROTATION CONTROL KIT 22 L/MIN (6 US GPM)
CASE CONSTRUCTION
WX218
NEW HOLLAND CONSTRUCTION
WE210B
47435387 – GRAB ROTATION CONTROL KIT 22 L/MIN (6 US GPM)
CASE CONSTRUCTION
WX218
NEW HOLLAND CONSTRUCTION
WE210B
47435390 – GRAB ROTATION CONTROL KIT 22 L/MIN (6 US GPM)
CASE CONSTRUCTION
WX218
NEW HOLLAND CONSTRUCTION
WE210B
47435391 – GRAB ROTATION CONTROL KIT 22 L/MIN (6 US GPM)
CASE CONSTRUCTION
WX218
NEW HOLLAND CONSTRUCTION
WE210B
47435394 – GRAB ROTATION CONTROL KIT 22 L/MIN (6 US GPM)
CASE CONSTRUCTION
WX218
NEW HOLLAND CONSTRUCTION
WE210B
47435395 – GRAB ROTATION CONTROL KIT 22 L/MIN (6 US GPM)
CASE CONSTRUCTION
WX218
NEW HOLLAND CONSTRUCTION
WE210B
Tor – 47435440

PRE-ASSEMBLY
PREPARING FOR ASSEMBLY
Preparation
Before perform the operations to install the kit, proceed as
follows:
1. Park the machine on a level surface.
2. Position the attachment as indicated in the figure.
3. Lower the blade and the stabilizers to the ground.
4. Lock the upper structure.
5. Apply the parking brake.
6. Turn the rotary dial to 1st detent (LOW IDLE) and shut
off the engine.
7. To allow all cylinders to release pressure set the starter
switch key again to position I, move both hydraulic control
hand levers and the pedal in all directions. Press
the brake pedal to discharge the accumulators of brake
system.
SMIL13WEX0217AB 1
8. Rest the bucket to the ground.
9. Place the safety lever in โ€œLOCKโ€ position.
10. Set the starter switch key to position 0 and pull it out.
11. Place some wedges under the wheels so as to prevent
the machine from moving.
12. Wait for the machine to cool off.
13. Release the pressure inside the hydraulic tank
through the bleeding valve (1) located on the tank (2).

IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:

CNH WE210B WX218 Wheeled Excavator GRAB ROTATION CONTROL KIT 22 L/MIN (6 US GPM) INSTALLATION INSTRUCTIONS MANUAL 47435440 EN_DE_FR_ES_IT – PDF DOWNLOAD
1 KIT CONTENT
Kit overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
2 PRE-ASSEMBLY
PREPARING FOR ASSEMBLY
Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
3 ASSEMBLY
Hammer and rotating bucket hydraulic system
Upper lines installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1
Boom lines installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4
Dipper lines installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13
Cylinder lines installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-16
4 POST-ASSEMBLY
INSTRUCTIONS
Activation of the grab rotation function . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1
FINAL-CHECK
Operating check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6

PLEASE NOTE:

  • This is the SAME MANUAL used by the dealerships to diagnose your vehicle
  • No waiting for couriers / posts as this is a PDF manual and you can download it within 2 minutes time once you make the payment.
  • Your payment is all safe and the delivery of the manual is INSTANT – You will be taken to the DOWNLOAD PAGE.
  • So have no hesitations whatsoever and write to us about any queries you may have :ย heydownloadss @gmail.com

S.V

What Our Customers Say

โ˜…โ˜…โ˜…โ˜…โ˜… Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    ๐Ÿ›’
    Recently Purchased
    ๐Ÿ•’ verified order