★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately
Sale!

CNH WX168 WX188 WE170B WE190B Wheeled Excavator 84541338 84541339 84541340 84541358 8454135 Installation Instructions Manual 84542494 EN_DE_IT_FR_ES – PDF DOWNLOAD

Original price was: $78.95.Current price is: $26.95.

CNH WX168 WX188 WE170B WE190B Wheeled Excavator 84541338 84541339 84541340 84541358 8454135 Installation Instructions Manual 84542494 EN_DE_IT_FR_ES – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

CNH WX168 WX188 WE170B WE190B Wheeled Excavator 84541338 84541339 84541340 84541358 8454135 Installation Instructions Manual 84542494 EN_DE_IT_FR_ES – PDF DOWNLOAD

DESCRIPTION:

CNH WX168 WX188 WE170B WE190B Wheeled Excavator 84541338 84541339 84541340 84541358 8454135 Installation Instructions Manual 84542494 EN_DE_IT_FR_ES – PDF DOWNLOAD

84541338 – ADD-ON GRAB ROTATION PROPORTIONAL 80 L/MIN (21.13 US
GPM)
CASE CONSTRUCTION
WX188
NEW HOLLAND CONSTRUCTION
WE190B
84541339 – ADD-ON GRAB ROTATION PROPORTIONAL 80 L/MIN (21.13 US
GPM)
CASE CONSTRUCTION
WX188
NEW HOLLAND CONSTRUCTION
WE190B
84541340 – ADD-ON GRAB ROTATION PROPORTIONAL 80 L/MIN (21.13 US
GPM)
CASE CONSTRUCTION
WX188
NEW HOLLAND CONSTRUCTION
WE190B
84541358 – ADD-ON GRAB ROTATION PROPORTIONAL 80 L/MIN (21.13 US
GPM)
CASE CONSTRUCTION
WX188
NEW HOLLAND CONSTRUCTION
WE190B
84541359 – ADD-ON GRAB ROTATION PROPORTIONAL 80 L/MIN (21.13 US
GPM)
CASE CONSTRUCTION
WX188
NEW HOLLAND CONSTRUCTION
WE190B
84541360 – ADD-ON GRAB ROTATION PROPORTIONAL 80 L/MIN (21.13 US
GPM)
CASE CONSTRUCTION
WX188
NEW HOLLAND CONSTRUCTION
WE190B
84581214 – ADD-ON GRAB ROTATION PROPORTIONAL 80 L/MIN (21.13 US
GPM)
CASE CONSTRUCTION
WX168
NEW HOLLAND CONSTRUCTION
WE170B
Tor – 84542494
Issue date March 2014
EN
84581215 – ADD-ON GRAB ROTATION PROPORTIONAL 80 L/MIN (21.13 US
GPM)
CASE CONSTRUCTION
WX168
NEW HOLLAND CONSTRUCTION
WE170B
84581216 – ADD-ON GRAB ROTATION PROPORTIONAL 80 L/MIN (21.13 US
GPM)
CASE CONSTRUCTION
WX168
NEW HOLLAND CONSTRUCTION
WE170B
84581224 – ADD-ON GRAB ROTATION PROPORTIONAL 80 L/MIN (21.13 US
GPM)
CASE CONSTRUCTION
WX168
NEW HOLLAND CONSTRUCTION
WE170B
84581225 – ADD-ON GRAB ROTATION PROPORTIONAL 80 L/MIN (21.13 US
GPM)
CASE CONSTRUCTION
WX168
NEW HOLLAND CONSTRUCTION
WE170B
84581226 – ADD-ON GRAB ROTATION PROPORTIONAL 80 L/MIN (21.13 US
GPM)
CASE CONSTRUCTION
WX168
NEW HOLLAND CONSTRUCTION
WE170B

PRE-ASSEMBLY
PREPARING FOR ASSEMBLY
Preparation
Before perform the operations to install the kit, proceed as
follows:
1. Park the machine on a level surface.
2. Position the attachment as indicated in the figure.
3. Lower the blade and the stabilizers to the ground.
4. Lock the upper structure.
5. Apply the parking brake.
6. Turn the rotary dial to 1st detent (LOW IDLE) and shut
off the engine.
7. To allow all cylinders to release pressure set the starter
switch key again to position I, move both hydraulic control
hand levers and the pedal in all directions. Press
the brake pedal to discharge the accumulators of brake
system.
SMIL13WEX0217AB 1
8. Rest the bucket to the ground.
9. Place the safety lever in “LOCK” position.
10. Set the starter switch key to position 0 and pull it out.
11. Place some wedges under the wheels so as to prevent
the machine from moving.
12. Wait for the machine to cool off.

IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:

CNH WX168 WX188 WE170B WE190B Wheeled Excavator 84541338 84541339 84541340 84541358 8454135 Installation Instructions Manual 84542494 EN_DE_IT_FR_ES – PDF DOWNLOAD

1 KIT CONTENT
Kit overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
2 PRE-ASSEMBLY
PREPARING FOR ASSEMBLY
Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
3 ASSEMBLY
Rotating bucket
Upper lines installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1
Boom lines installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7
Dipper lines installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13
Cylinder lines installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-16
Joystick . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-19
4 POST-ASSEMBLY
INSTRUCTIONS
Function activation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1
FINAL-CHECK
Operating check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6
EN

PLEASE NOTE:

  • This is the SAME manual used by the dealers to troubleshoot any faults in your vehicle. This can be yours in 2 minutes after the payment is made.
  • Contact us at [email protected] should you have any queries before your purchase or that you need any other service / repair / parts operators manual.

S.V 

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order