Ditch Witch JT25 Tier 3 & JT25 Tier 4i Operator’s Manual 053-2593 PDF
$28.95
Ditch Witch JT25 Tier 3 & JT25 Tier 4i Operator’s Manual (053-2593) is an essential guide, offering clear instructions on the operation, maintenance, and safety of the horizontal directional drill. Crucial for efficient and secure equipment use.
Description
Ditch Witch JT25 Tier 3 & JT25 Tier 4i Operator’s Manual 053-2593 – PDF DOWNLOAD
FILE DETAILS:
Ditch Witch JT25 Tier 3 & JT25 Tier 4i Operator’s Manual 053-2593 – PDF DOWNLOAD
Language : English
Pages : 215
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:
Ditch Witch JT25 Tier 3 & JT25 Tier 4i Operator’s Manual 053-2593 – PDF DOWNLOAD
Overview 2
Serial Number Location 3
Intended Use 4
Equipment Modification 4
Unit Components 5
Operator Orientation 6
About This Manual 6
Bulleted Lists 6
Numbered Lists 6
Foreword 8
Contents 10
Safety 12
Guidelines 13
Emergency Procedures 14
Electric Strike Description 14
If an Electric Line is Damaged 15
If a Gas Line is Damaged 16
If a Fiber Optic Cable is Damaged 17
If Machine Catches on Fire 17
Safety Alert Classifications 18
Machine Safety Alerts 19
Controls 22
Set-Up Console 23
Tethered Ground Drive Controller 26
Left Control Console 28
E ngine Display 28
Traditional Controls 31
Alternate Controls 35
Right Control Console 39
Lights 39
Traditional Controls 43
Alternate Controls 46
Anchoring System Console 50
Seat 52
Cab Controls (optional) 53
Top/Rear 53
Front 55
Engine Compartment Controls 57
Miscellaneous Controls 59
ESID 61
Operation Overview 66
Planning 67
Setting Up at Jobsite 67
Drilling 68
Backreaming 69
Backreaming Tips 69
Leaving Jobsite 69
Storing Equipment 69
Prepare 70
Gather Information 72
Review Job Plan 72
Notify One-Call Services 72
Examine Pullback Material 72
Arrange for Traffic Control 72
Plan for Emergency Services 72
Inspect Site 73
Identify Hazards 73
Select Start and End Points 74
Classify Jobsite 75
Inspect Jobsite 75
Select a Classification 75
Apply Precautions 76
Plan Bore Path 77
Recommended Bend Limits 78
Entry Pitch 81
Minimum Setback 82
Minimum Depth 82
Bore Path Calculator 83
Prepare Jobsite 85
Mark Bore Path 85
Prepare Entry Point 85
Check Supplies and Prepare Equipment 86
Check Supplies 86
Prepare Equipment 87
Assemble Accessories 87
Drive 88
Start Unit 89
Steer Unit 89
Tips to Reduce Track Wear 90
Shut Down Unit 90
Transport 92
Lift 93
Pipe Box Lifting Procedure 93
Load 93
Tie Down 94
Unload 95
Tow 95
Conduct a Bore 98
Position Equipment 100
Connect Fluid System 100
Start System 101
Prime Drilling Fluid Pump 101
Operate Carriage Control 102
Drilling (Traditional Controls) 102
Drilling (Alternate Controls) 102
Coordinated Make-up 102
Clamp Pipe 103
Assemble Drill String 104
Connect Drill Pipe 105
Drill First Pipe 106
Enable Automated Pipeloader System 106
Add Pipe 107
Correct Direction 109
Basic Rules 109
Procedure 110
Drill Head Position 110
Use AutoCarve 111
Operation 112
Record Bore Path 113
Surface Drill Head 114
Backream 115
Remove Pipe 117
Remove Pullback Device 119
Systems and Equipment 120
Anchor System 122
Drive Anchors 123
Remove Anchors 123
Electric Strike System 124
FCC Statement 124
Assemble Voltage Detector 125
Test Strike System 125
Troubleshoot Strike System 126
Use Electric Strike Simulator 128
Drilling Fluid 130
Guidelines 130
Polymer 130
Bentonite 131
Mixtures 131
Drilling Fluid Requirements 133
Funnel Viscosity 133
DrillLok™/Tracker Control 134
Overview 134
Downhole Tools 135
Nozzles 135
Bits 135
Beacon Housings 136
Backreamers 137
Backream Fluid Requirements 138
Quick Wrench 140
Drill Pipe 142
Perform Regular Drill Pipe Care 142
Use Drill Pipe Correctly 143
Pipe Boxes 145
Remove/Install Pipe Box 145
Add/Remove Single Pipe 147
Cruise Control 151
Engage 151
Adjust Settings 152
Override 152
Disengage 152
Resume 152
Diagnostic Codes 153
Electronic Controlled Engine Overview 153
Reading Engine Diagnostic Codes 153
Reading Machine Diagnostic Codes 160
Machine Diagnostic Codes 162
Complete the Job 166
Antifreeze Drilling Unit 167
Add Antifreeze 167
Reclaim Antifreeze 168
Rinse Equipment 169
Using Washwand 169
Disconnect 170
Stow Tools 170
Service 172
Service Precautions 173
Welding Precaution 173
Washing Precaution 173
Working Under Drilling Unit 174
Opening/Closing Engine Enclosure 175
Recommended Lubricants/Service Key 176
Approved Coolant 177
Approved Fuel 178
Startup/10 Hour 179
Drilling Unit 180
50 Hour 186
Drilling Unit 186
250 Hour 190
Drilling Unit 190
500 Hour 191
Drilling Unit 191
1000 Hour 192
Drilling Unit 192
2000 Hour 195
Drilling Unit 195
As Needed 196
Drilling Unit 197
Specifications 206
Support 210
Procedure 210
Resources 210
Publications 210
Ditch Witch® Training 210
Warranty 211
Service Record 214
Customer Support: [email protected]
https://vimeo.com/902482480?share=copy
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment



Ditch Witch 48”, 60”, 72” Tier 4 & 60” Stage V Operation Manual PDF
