★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
๐Ÿข
Trusted Business
Verified & Licensed
๐Ÿ›ก๏ธ
Virus Free Files
100% Safe Downloads
๐Ÿ”’
Secure Payment
SSL Protected
โšก
Instant Delivery
Available Immediately

Ditch Witch JT2720 Mach 1/All Terrain Operator’s Manual 054-063

$26.95

This Operator’s Manual for Ditch Witch JT2720 Mach 1/All Terrain provides essential information on safety, controls, operation, maintenance, and specifications. Download the PDF for comprehensive guidance.

โšก
Instant PDF Download
Available immediately
๐Ÿ’พ
Save to Your Device
Download & keep forever
๐Ÿ›ก๏ธ
Antivirus Scanned
100% virus-free
๐ŸŒ
Trusted Worldwide
175,000+ customers

Description

Ditch Witch JT2720 Mach 1/All Terrain Operator’s Manual 054-063 – PDF DOWNLOAD

This Operator’s Manual for Ditch Witch JT2720 Mach 1/All Terrain provides essential information on safety, controls, operation, maintenance, and specifications. Download the PDF for comprehensive guidance.

FILE DETAILS:

Ditch Witch JT2720 Mach 1/All Terrain Operator’s Manual 054-063 – PDF DOWNLOAD

Language : English
Pages : 242
Downloadable : Yes
File Type : PDF

IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:

Ditch Witch JT2720 Mach 1/All Terrain Operator’s Manual 054-063 – PDF DOWNLOAD

SERVICE.................................................  1
	SERIAL NUMBER.......................................  1
	SUPPORT PROCEDURE...................................  2
	RESOURCES...........................................  2
		Publications....................................  2
		Ditch Witch Training............................  2
FOREWORD................................................  3
CONTENTS................................................  5
OVERVIEW................................................ 11
CONTROLS................................................ 13
	SET-UP CONSOLE OVERVIEW............................. 13
	SET-UP CONSOLE DESCRIPTIONS......................... 14
	TETHERED GROUND DRIVE CONTROLLER OVERVIEW........... 18
	TETHERED GROUND DRIVE CONTROLLER DESCRIPTIONS....... 19
	LEFT CONTROL CONSOLE OVERVIEW....................... 21
	LEFT CONTROL CONSOLE DESCRIPTIONS................... 22
	RIGHT CONTROL CONSOLE OVERVIEW...................... 26
	RIGHT CONTROL CONSOLE DESCRIPTIONS.................. 27
	AUXILIARY CONSOLE OVERVIEW.......................... 36
	AUXILIARY CONSOLE DESCRIPTIONS...................... 37
	SEAT CONTROLS....................................... 41
	ANCHORING SYSTEM CONSOLE OVERVIEW................... 42
	ANCHORIONG SYSTEM CONSOLE DESCRIPTIONS.............. 43
	OVERRIDE BOX CONTROL OVERVIEW....................... 45
	OVERRIDE BOX CONTROL DESCRIPTIONS................... 46
	ESID OVERVIEW....................................... 48
	ESID DESCRIPTIONS................................... 49
	SUBSITE 750 DISPLAY OVERVIEW........................ 51
	SUBSITE 750 DISPLAY DESCRIPTIONS.................... 52
SAFETY.................................................. 57
	ACCESSORIES......................................... 58
		Fire Extinguisher............................... 58
		Lighting Kit.................................... 58
	UNDERGROUND HAZARDS................................. 58
	EMERGENCY PROCEDURES................................ 59
		Electric Strike Description..................... 59
		If an Electric Line is Damaged.................. 60
		If a Gas Line is Damaged........................ 61
		If a Fiber Optic Cable is Damaged............... 61
		If Machine Catches on Fire...................... 61
	JOBSITE CLASSIFICATION.............................. 62
		Inspecting Jobsite.............................. 62
		Selecting a Classification...................... 63
		Applying Precautions............................ 64
	SAFETY ALERT CLASSIFICATIONS........................ 66
	SAFETY ALERTS....................................... 67
PREPARATION............................................. 73
	GATHER INFORMATION.................................. 73
		Job Plan........................................ 73
		One-Call Services............................... 73
		Pullback Material............................... 73
		Traffic Control................................. 73
		Emergency Services.............................. 73
	INSPECT SITE........................................ 74
		Identify Hazards................................ 75
		Select Start and End Points..................... 76
	PLAN BORE PATH...................................... 77
		Recommended Bend Limit.......................... 78
		Entry Pitch..................................... 79
		Minimum Setback................................. 80
		Minimum Depth................................... 81
	SELECT DRILLING MODE................................ 82
	PREPARE DRILLING UNIT............................... 83
		AT Mode/All Terrain Pipe; Rockmaster II Tool.... 83
		AT Mode/All Terrain Pipe; Standard JT Tools..... 83
		JT Mode/JT Pipe; Standard JT Tools.............. 84
	PREPARE EQUIPMENT................................... 85
	CHECK SUPPLIES...................................... 86
	PREPARE JOBSITE..................................... 87
		Mark Bore Path.................................. 87
		Prepare Entry Point............................. 88
	RECORD BORE PATH.................................... 89
TRANSPORTATION.......................................... 91
	LIFT................................................ 91
		Points.......................................... 91
		Procedure....................................... 92
	TIEDOWN............................................. 93
		Points.......................................... 93
		Procedure....................................... 93
	OPERATE TETHERED GROUND DRIVE CONTROLLER............ 94
	HAUL................................................ 95
		Loading onto Trailer............................ 95
		Unloading from Trailer.......................... 96
	SHUT DOWN UNIT...................................... 96
	TOW................................................. 97
		Points.......................................... 97
		Procedure....................................... 97
SETUP................................................... 99
	UNLOAD.............................................. 99
	VERIFY UNIT SETUP...................................100
	ASSEMBLE DRILL STRING (AT MODE).....................101
		Prepare Downhole Tool...........................101
		Attach Lead Pipe................................103
		Attach Downhole Tool............................103
	ASSEMBLE DRILL STRING (JT MODE).....................105
		Select Nozzle and Bit...........................105
		Attach Transition Sub...........................106
		Attach Beacon Housing...........................106
		Connect Drill Pipe..............................109
	POSITION DRILLING UNIT AND FRAME....................110
	ASSEMBLE ELECTRIC STRIKE SYSTEM.....................111
		FCC Statement...................................111
		Assemble Voltage Detector.......................112
		Test Strike System..............................112
	ANCHOR..............................................113
		Select Anchor...................................113
		Attach Anchor to Anchor Driver..................114
		Drive Anchors (Rock)............................115
		Drive Anchors (Soil)............................116
	CONNECT FLUID SYSTEM................................116
OPERATION...............................................117
	OPERATE TRACKER CONTROL MODE........................119
		Overview........................................119
		Operation.......................................120
	OPERATE CARRIAGE CONTROL............................122
	START SYSTEM........................................123
	DRILL LEAD PIPE (AT MODE)...........................124
	DRILL FIRST PIPE (JT MODE)..........................126
	ADD PIPE (AT MODE)..................................127
		Manual Pipeloader Control.......................128
		Automated Pipeloader Control....................131
	ADD PIPE (JT MODE)..................................135
		Manual Pipeloader Control.......................136
		Automated Pipeloader Control....................138
	OPERATE CRUISE CONTROL..............................141
		Engage..........................................141
		Adjust Thrust or Pullback.......................141
		Adjust Outer Rotation...........................141
		Override........................................142
		Disengage.......................................142
		Resume..........................................142
		AT Mode.........................................142
	REMOVE/ADD PIPE BOX.................................143
	CORRECT DIRECTION (AT MODE).........................145
	CORRECT DIRECTION (JT MODE).........................148
	ADD PIPE TO PIPE BOX................................150
		Procedure.......................................151
	SURFACE DRILL HEAD..................................153
	ASSEMBLE BACKREAM STRING............................155
		Backreaming Procedure...........................155
		Backreaming Tips................................157
		Select Pullback Devices.........................157
		Determine Fluid Requirements....................158
		Attach Pullback Devices.........................159
	REMOVE PIPE (AT MODE)...............................161
		Manual Pipeloader Control.......................161
		Automated Pipeloader Control....................164
	REMOVE PIPE (JT MODE)...............................167
		Manual Pipeloader Control.......................167
		Automated Pipeloader Control....................169
	REMOVE PIPE FROM PIPE BOX...........................172
	REMOVE PULLBACK DEVICE..............................174
	ANTIFREEZE DRILLING UNIT............................176
BREAKDOWN...............................................177
	REMOVE ANCHORS......................................177
	RINSE EQUIPMENT.....................................177
	DISCONNECT..........................................178
	STOW TOOLS..........................................178
LUBRICATION.............................................179
	OVERVIEW............................................180
	ENGINE OIL..........................................182
		Check...........................................182
		Change..........................................182
	FRAME...............................................183
		Thrust Chain Flange Bearing.....................184
		Thrust Chain....................................184
		Carriage Slide Bracket..........................185
		Pipeloader Shuttle Slide........................185
		Vise Wrenches...................................185
		Pipe Auto Lubricator............................186
	GEARBOXES...........................................189
		Rotation Gearboxes..............................190
		Thrust Drive Gearboxes..........................190
		Ground Drive Gearbox............................191
	HYDRAULIC OIL.......................................192
		Check...........................................193
		Change..........................................193
	FLUID PUMP..........................................194
		Check...........................................194
		Change..........................................194
	DOWNHOLE TOOL.......................................195
MAINTENANCE.............................................197
	OVERVIEW............................................197
	GENERAL COMPONENTS..................................198
		Batteries.......................................199
		Inspect Hoses...................................199
		Belt............................................199
		Radiator........................................200
		Saver Sub.......................................202
		Anchor Driver Glide Strips......................202
		Pipeloader Inserts..............................202
		Carriage Slide Bars.............................203
		Pipe Guide Blocks...............................203
		Inner Rotation Dither...........................203
	FILTERS.............................................204
		Drilling Fluid Pump Y- Strainer.................204
		Fuel Filter.....................................205
		Air Filter......................................205
		Muffler.........................................205
	POWER COMPONENTS....................................206
		Track Tension...................................206
		Thrust Chain Tension............................207
		Gearboxes and Motors............................207
	DOWNHOLE TOOL.......................................208
		Rebuild Tool....................................208
		Replace Shaft...................................208
	PIPELOADER CONTROL..................................209
		Proximity Switches..............................209
	PIPE................................................210
		Before pipe is used first time:.................210
		Each time pipe is used:.........................210
		Periodic Maintenance............................211
		Cleaning Threads................................211
	TROUBLESHOOT STRIKE SYSTEM..........................212
	USE ELECTRIC STRIKE SIMULATOR.......................214
		Current Test....................................214
		Voltage Test....................................215
	TROUBLESHOOT DRILLING UNIT..........................216
		Diagnostic Light................................216
		Code Severity Levels............................216
		Review Mode.....................................217
		Diagnostic Code Interpretation..................218
		Diagnostic Codes................................219
SPECIFICATIONS..........................................223
APPENDIX................................................229
	A. BEND LIMITS......................................229
	B. ENTRY PITCH, SETBACK, AND DEPTH..................232
	C. DRILLING FLUID REQUIREMENTS......................233
	D. NOZZLE FLOW......................................236
WARRANTY................................................239

S.S 02/2024

What Our Customers Say

โ˜…โ˜…โ˜…โ˜…โ˜… Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    ๐Ÿ›’
    Recently Purchased
    ๐Ÿ•’ verified order