★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

FURUKAWA HCR1500Ⅱ HYDRAULIC CRAWLER DRILL Operation Manual PDF DOWNLOAD

$26.95

FURUKAWA HCR1500 Ⅱ HYDRAULIC CRAWLER DRILL Operation Manual PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

FURUKAWA HCR1500Ⅱ HYDRAULIC CRAWLER DRILL Operation Manual PDF DOWNLOAD

FILE DETAILS:

FURUKAWA HCR1500Ⅱ HYDRAULIC CRAWLER DRILL Operation Manual PDF DOWNLOAD 

Language : English
Pages : 223
Downloadable : Yes
File Type : PDF

IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:

FURUKAWA HCR1500Ⅱ HYDRAULIC CRAWLER DRILL Operation Manual PDF DOWNLOAD 

COVER................................................  1
IMPORTANT INFORMATION ...............................  0
Foreword ............................................  0
Safety Information ..................................  0
Machine Serial Numbers ..............................  0
Safety Signs ........................................  0
Contents ............................................  0
1. Safety Precautions ...............................  0
	1.1 Safety Management ...........................  0
	1.2 Precautions before Engine Start .............  0
	1.3 Precautions after Engine Start ..............  0
	1.4 Precautions for Safe Operation ..............  0
	1.5 Precautions with Machine Parking ............  0
	1.6 Precautions for Towing ......................  0
	1.7 Precautions for Transporting ................  0
	1.8 Precautions before Maintenance ..............  0
	1.9 Precautions during Maintenance ..............  0
	1.10 Precautions after Maintenance ..............  0
2. Specifications ...................................  2
	2.1 Component Names .............................  2
	2.2 Specifications ..............................  3
3. Operator’s Station ...............................  7
	3.1 Meter Panel .................................  8
		3.1.1 Monitor Panel ......................... 11
	3.2 Engine Switch Box ........................... 18
	3.3 Travel Levers ............................... 20
		3.3.1 Travel Levers ......................... 20
		3.3.2 Oscillating Lock Mechanism ............ 22
	3.4 Safety Lock Lever ........................... 23
	3.5 Emergency Stop Button ....................... 24
	3.6 Drilling Control Box ........................ 25
		3.6.1 Control Grip .......................... 28
		3.6.2 Hydraulic Cylinder Control Panel ...... 33
		3.6.3 Handling of Air-Conditioner ........... 36
	3.7 Drilling Console Box ........................ 43
		3.7.1 Control Panel ......................... 43
		3.7.2 Switch Panel .......................... 48
	3.8 Rod Changer Control ......................... 52
		3.8.1 Rod Changer Control Lever ............. 54
		3.8.2 Rod Changer Adjusting Panel ........... 56
	3.9 Pressure Gauges ............................. 69
	3.10 Pressure Adjusting Handles.................. 70
	3.11 Operator’s Seat ............................ 71
		3.11.1 Seat Adjustment  ..................... 71
		3.11.2 Seat Belt Adjustment (If Equipped).... 75
	3.12 Operator’s Cab ............................. 76
	3.13 Accessories in Cab ......................... 78
		3.13.1 Handling of Fire Extinguisher ........ 85
4. Running Operation ................................ 87
	4.1 Daily Inspection ............................ 87
		4.1.1 Before Starting the Engine ............ 89
	4.2 Operation of Engine .........................102
		4.2.1 Before Starting the Engine  ...........102
		4.2.2 Starting the Engine ...................104
		4.2.3 After Starting the Engine .............106
		4.2.4 Stopping the Engine....................115
	4.3 Automatic Heating of Hydraulic Oil ..........116
	4.4 Traveling the Machine .......................117
		4.4.1 Traveling Posture .....................118
		4.4.2 Starting ..............................119
		4.4.3 Direction Control .....................121
		4.4.4 Stopping the Machine ..................123
	4.5 Parking the Machine .........................125
		4.5.1 Locking ...............................127
	4.6 Drilling Work ...............................128
		4.6.1 Preparation for Drilling ..............128
		4.6.2 Collaring .............................130
		4.6.3 Regular Drilling ......................133
		4.6.4 Using Anti-Jamming Controller .........136
		4.6.5 End of Drilling Work ..................137
	4.7 Rod Changer Operation .......................140
		4.7.1 Pull-drilling Specification ...........141
		4.7.2 Push-drilling Specification ...........157
	4.8 Auto Greaser ................................173
5. Transporting .....................................177
	5.1 Loading Machine on a Trailer ................177
	5.2 Towing ......................................179
	5.3 Lifting Procedure ...........................180
6. Electrical Equipment .............................183
	6.1 Control Panel ...............................183
		6.1.1 Emergency Run Switch ..................185
		6.1.2 Impact Timer (If Equipped) ............186
	6.2 Fuses .......................................187
	6.3 Battery Servicing ...........................189
		6.3.1 Replace Batteries .....................192
		6.3.2 Using Booster Batteries ...............194
7. Operation in Cold Weather ........................197
8. Storage ..........................................199
9. Troubleshooting ..................................201
	9.1 Inspection of Pump Functions ................206
	9.2 Emergency Escape Selector Valve .............210
10. General Safety Instructions .....................211
11. Fuels and Lubricants ............................213
	11.1 Emergency Measures .........................213
	11.2 Fuel .......................................214
	11.3 Lubricants .................................215
	11.4 Oil Supply Pump ............................217
12. Coolants.........................................221
13. Refill Capacities ...............................223
14. Maintenance Interval Schedule ...................  0
	14.1 When Required ..............................  0
	14.2 First Maintenance ..........................  0
	14.3 Periodic Maintenance / 50 Hours ............  0
	14.4 Periodic Maintenance / 250 Hours ...........  0
	14.5 Periodic Maintenance / 500 Hours ...........  0
	14.6 Periodic Maintenance / 1000 Hours ..........  0
	14.7 Periodic Maintenance / 2000 Hours ..........  0
15. Periodic Replacement of Maintenance Parts .......  0
ADDRESS..............................................  0

Contact us: [email protected]

https://vimeo.com/846500682?share=copy

DESCRIPTION:

FURUKAWA HCR1500Ⅱ HYDRAULIC CRAWLER DRILL Operation Manual PDF DOWNLOAD 

General Safety Instructions

The longevity of any piece of construction equipment is greatly influenced by operating techniques and the quality of the routine care it receives. Routine checks and service are essential for preventing breakdowns, maintaining performance and keeping operation costs down. Also, fuel and lubricant consumption, as well as any problems which the operator may have noticed, is an important part any good maintenance program.
? Service Your Machine at Specified Intervals
? Lubricate make service checks and adjustments at intervals shown on the periodic maintenance chart and on the following pages.
? Perform service on items at multiples of the original requirement. For example, at 500 hours also service those items (if applicable) listed less than 250 hours, 100 hours, 50 hours, and daily.
? Use correct fuels and lubricants. Refer to 11. “Fuels and Lubricants” when performing maintenance on your machine.
? Use the Hour Meter to determine servicing intervals.
? Intervals on the periodic maintenance chart are for operating in normal conditions. If you operate your machine in hard conditions, you should service it at Short Intervals.

Safety:

1. Before beginning any maintenance work, be sure to get a good idea of the general condition of the machine. You are about to work on in order to avoid any danger to yourself.
2. Pull up the safety lock lever to set it to LOCK so that the machine cannot be moved. Set all operation levers and switches to neutral or off.
3. Never do any maintenance work while the machine is in operation or engine running.
4. Hang a “DO NOT OPERATE” or similar warning tag near operator’s seat to warn others not to start or operate the machine.
5. Before doing any work, set the guide shell horizontal and lower the guide shell on the ground to avoid accidents. Apply the stoppers to the track shoes.
6. When workings on the electrical system, first turn starter switch OFF and then take off battery cable from battery negative terminal as a safety precaution, and to avoid any possible damage to electrical components.

PLEASE NOTE:

  • This is the same manual used by the dealers to diagnose and troubleshoot your vehicle
  • You will be directed to the download page as soon as the purchase is completed. The whole payment and downloading process will take anywhere between 2-5 minutes
  • Need any other service / repair / parts manual, please feel free to contact [email protected] . We still have 50,000 manuals unlisted

G.P

 

 

 

 

 

 

 

 

 

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order