Gleaner NA Harvesting S68 S78 S88 TRANSVERSE Combine Repair Time Schedule Manual 79036616B – PDF DOWNLOAD
$89.95 Original price was: $89.95.$28.95Current price is: $28.95.
Gleaner NA Harvesting S68 S78 S88 TRANSVERSE Combine Repair Time Schedule Manual 79036616B – PDF DOWNLOAD
Description
Gleaner NA Harvesting S68 S78 S88 TRANSVERSE Combine Repair Time Schedule Manual 79036616B – PDF DOWNLOAD
FILE DETAILS:
Gleaner NA Harvesting S68 S78 S88 TRANSVERSE Combine Repair Time Schedule Manual 79036616B – PDF DOWNLOAD
Language : English
Pages : 256
Downloadable : Yes
File Type : PDF
Size: 257 MB
IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:
Gleaner NA Harvesting S68 S78 S88 TRANSVERSE Combine Repair Time Schedule Manual 79036616B – PDF DOWNLOAD
A. TIME ALLOWANCE:
The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained dealer mechanic, of normal ability has taken to carry out the operation in a typical dealership, using standard workshop tooling and equipment including air tools, located for reasonable access and working conditions.
- They DO NOT include any traveling to or from the farm or site. The machine is assumed to be clean and to be bare of any extra equipment or attachment of non “AGCO” manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available.
- The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended tools shown in the workshop manual. The times are based on a second hand machine in reasonable condition properly maintained using approved parts.
- Extra time may be required to deal with seized, rusted or damaged parts. Allowances are included in the operation times quoted for obtaining all tools and parts, cleaning and testing after repair. Diagnostic time is included in the time allowance unless a separate code is listed for diagonistic time. The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediate operations.
B.TIMES:
- All the operating times are presented in hours and the decimal parts of an hour. Decimal times must be used on all warranty claims. The times given in this repair time schedule are for a complete job from start to finish.
- Where access has been gained for an adjacent repair only the additional time for the second repair will be accepted and not the total time for the two failures.
TABLE OF CONTENTS:
Gleaner NA Harvesting S68 S78 S88 TRANSVERSE Combine Repair Time Schedule Manual 79036616B – PDF DOWNLOAD
Accessories
Air Conditioning and Heating System
Axles
Brake System
Cab
Chassis
Cleaning System
Decals
Discharge System
Drive System
Drive Train System
Electrical System
Engine, Fuel and Exhaust System
Feeding System
Grain Bin and Elevator System
Guidance System
Hydraulic System
Steering System
Threshing System
Wheels
Questions? Email us: [email protected]
https://vimeo.com/820530868?share=copy
PLEASE NOTE:
- This is the SAME manual used by the dealers to troubleshoot any faults in your vehicle. This can be yours in 2 minutes after the payment is made.
- Contact us atย [email protected]ย should you have any queries before your purchase or that you need any other service / repair / parts operators manual.
S.Vย
What Our Customers Say
๐ Related Products
Discover more professional manuals for your equipment

Gleaner EU Automatic Guidance Operator's Manual 71484634A - PDF DOWNLOAD

Gleaner S9 Series Combine with AP84-4 & AP98-4 engines S96 S97 S98 Service Manual 79036910B - PDF DOWNLOAD

Gleaner EU Combine Terminal Operator's Manual 79036914A - PDF DOWNLOAD
