Grove Crane 6300 Lattice Extension Operating Instruction Manual 2084555 – PDF DOWNLOAD
$28.95
Grove Crane 6300 Lattice Extension Operating Instruction Manual 2084555 – PDF DOWNLOAD
Description
Grove Crane 6300 Lattice Extension Operating Instruction Manual 2084555 – PDF DOWNLOAD
FILE DETAILS:
Grove Crane 6300 Lattice Extension Operating Instruction Manual 2084555 – PDF DOWNLOAD
Language : English
Pages : 338
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:
Grove Crane 6300 Lattice Extension Operating Instruction Manual 2084555 – PDF DOWNLOAD
Important information
1.1 About these operating instructions
All the lattice extensions described in these operating instructions can be obtained as additional equipment.
Validity of this operating manual:
- These operating instructions apply exclusively to the telescopic swingaway lattice extension supplied by the Deutsche GROVE GmbH.
- For operating the truck crane with the telescopic swing-away lattice extension, all the specifications in the supplied operating instructions of the GMK 6300, which the telescopic swing-away lattice extension was supplied for by the works, also apply.
Prerequisites for assembly and operation:
The telescopic swing-away lattice extension may only be operated together with the GROVE mobile crane GMK 6300, whose serial number is identical with that of the telescopic swing-away lattice extension.
General safety instructions:
When operating the GMK 6300 with the telescopic swing-away lattice extension, the crane operator needs to observe:
– the general safety instructions in the following section Fundamental safety instructions for crane operators and
– the safety instructions listed in the supplied operating instructions of the GMK 6300.
TABLE OF CONTENTS:
Grove Crane 6300 Lattice Extension Operating Instruction Manual 2084555 – PDF DOWNLOAD
1 Important information.................................................................................................... 7 1.1 About these operating instructions................................................................................. 7 1.2 Fundamental safety instructions for crane operators................................................................ 8 1.2.1 Warnings and symbols......................................................................................... 8 1.3 Proper use......................................................................................................... 9 1.4 Organisational measures............................................................................................ 11 1.5 Personnel qualifications........................................................................................... 13 1.6 Safety instructions for truck crane work........................................................................... 14 1.7 Specifications in US units of measurement.......................................................................... 16 1.7.1 Telescopic swing-away lattice extension...................................................................... 16 1.7.2 Auxiliary single-sheave boom top............................................................................. 16 1.7.3 Boom extension............................................................................................... 17 1.7.4 Luffing jib.................................................................................................. 17 1.7.5 Heavy load lattice extension................................................................................. 18 2 Dimensions, weights and assignment of the parts to luffing jibs.......................................................... 21 2.1 Dimensions and weights in metric units............................................................................. 21 2.1.1 Telescopic swing-away lattice extension...................................................................... 21 2.1.2 Auxiliary single-sheave boom top............................................................................. 21 2.1.3 Boom extension............................................................................................... 21 2.1.4 Luffing jib.................................................................................................. 22 2.1.5 Heavy load lattice extension................................................................................. 22 2.2 Dimensions and weights in US units................................................................................. 23 2.2.1 Swing away lattice extension................................................................................. 23 2.2.2 Auxiliary single-sheave boom top............................................................................. 23 2.2.3 Boom extension............................................................................................... 23 2.2.4 Luffing jib.................................................................................................. 24 2.3 Assignment of the parts to luffing jibs............................................................................ 25 3 Telescopic swing-away lattice extension.................................................................................. 29 3.1 Supplement to the operation of the GMK 6300 with the telescopic swing-away lattice extension folded at the side.... 29 3.1.1 Changed requirements for telescoping......................................................................... 29 3.1.2 Instructions for driving with the mounted telescopic swing-away lattice extension............................ 30 3.2 Additional operating and display elements in the driver’s cab...................................................... 31 3.2.1 Location of the additional operating and display elements.................................................... 32 3.2.2 The functions of the additional operating and display elements............................................... 33 3.3 Additional operating and display elements in the crane cab......................................................... 35 3.3.1 Location of the additional operating and display elements.................................................... 35 3.3.2 Function of the operating and display elements............................................................... 36 3.4 Operating elements of the telescopic swing-away lattice extension.................................................. 37 3.4.1 Mobile switch unit........................................................................................... 37 3.5 Components and Identification...................................................................................... 39 3.6 Assembly of lattice extensions..................................................................................... 41 3.7 Slinging points.................................................................................................... 43 3.8 Checklists for rigging work........................................................................................ 45 3.8.1 Overview of the required rigging work........................................................................ 45 3.8.2 CHECKLIST: Mounting the telescopic swing-away lattice extension.............................................. 46 3.8.3 CHECKLIST: Removing the telescopic swing-away lattice extension.............................................. 47 3.8.4 CHECKLIST: Rigging the telescopic swing-away lattice extension............................................... 48 3.8.5 CHECKLIST: Unrigging the telescopic swing-away lattice extension............................................. 53 3.9 Description of rigging work........................................................................................ 59 3.9.1 Preparing the truck crane for rigging........................................................................ 59 3.9.2 Mounting/removing adapter unit............................................................................... 60 3.9.3 Checking driving / working with the main boom rigging modes.................................................. 61 3.9.4 Connections and positions with the lattice extension folded at the side...................................... 64 3.9.5 Pin connection to swing the lattice extension................................................................ 69 3.9.6 Swinging the lattice extension when rigging.................................................................. 71 3.9.7 Pin connections for working with the lattice extension....................................................... 72 3.9.8 Establishing/disconnecting the hydraulic connection.......................................................... 74 3.9.9 Electrical connection for rigging work....................................................................... 76 3.9.10 Telescoping lattice extension............................................................................... 77 3.9.11 Adjusting angle on the lattice extension.................................................................... 78 3.9.12 Folding deflection sheave out/in on the foot section........................................................ 82 3.9.13 Placing and reeving hoist rope.............................................................................. 83 3.9.14 Lifting limit switch on the lattice extension............................................................... 85 3.9.15 Anemometer on the lattice extension......................................................................... 87 3.9.16 Transportation of the lattice extension..................................................................... 88 3.10 Operation with the lattice extension.............................................................................. 89 3.10.1 Raising and setting down the main boom with rigged lattice extension........................................ 90 3.10.2 Telescoping with rigged lattice extension................................................................... 91 3.10.3 Swinging lattice extension onto the run-up rail............................................................. 92 3.11 Turning loads with the lattice extension.......................................................................... 95 3.11.2 Setting SLI................................................................................................. 96 3.12 Driving with rigged crane and lattice extension installed..................................................... 99 3.12.1 Driving route............................................................................................... 99 3.12.2 Position of the boom........................................................................................100 3.12.3 Driving the rigged crane....................................................................................103 3.13 Malfunctions during operation with the telescopic swing-away lattice extension....................................107 3.13.1 Telescopic swing-away lattice extension malfunctions........................................................107 3.14 Maintenance plans.................................................................................................109 3.14.1 Maintenance plan M 1: monthly / after 100 oh................................................................109 3.14.2 Maintenance plan M 3: every 3 months / after 300 oh.........................................................109 3.15 Table of lubricants...............................................................................................111 3.16 Maintenance work..................................................................................................113 3.16.1 Modules in need of protection during cleaning work..........................................................113 3.16.2 Preparing the truck crane for maintenance work..............................................................114 3.16.3 Lubricating supporting roller...............................................................................115 3.16.4 Lubricating the tow chain and the gear chain................................................................116 3.16.5 Check tension of tow chain and gear chain and increase the tension if necessary.............................118 3.16.6 Lubricating the telescope slide faces.......................................................................121 3.16.7 Adjusting the support roller for the telescope section......................................................122 4 Auxiliary single-sheave boom top.........................................................................................125 4.1 Attachment point...................................................................................................125 4.2 Description of rigging work........................................................................................127 4.2.1 Installing/removing auxiliary single-sheave boom top.........................................................127 4.2.2 Rigging the auxiliary single-sheave boom top.................................................................129 4.3 Reeving the hoist rope.............................................................................................131 4.4 Connecting the lifting limit switch and anemometer.................................................................133 4.5 Turning loads with the auxiliary single-sheave boom top............................................................135 5 Boom extension...........................................................................................................141 5.1 Components and Identification......................................................................................141 5.2 Combination possibilities..........................................................................................145 5.3 Attachment points..................................................................................................147 5.4 Rigging the boom extension.........................................................................................149 5.4.1 CHECKLIST: Rigging the boom extension........................................................................149 5.4.2 CHECKLIST: Unrigging boom extension..........................................................................152 5.5 Description of rigging work........................................................................................154 5.5.1 Rigging mode of the truck crane when installing the boom extension...........................................154 5.5.2 Handling the pins............................................................................................155 5.5.3 Installing/disassembling foot section........................................................................156 5.5.4 Installing/disassembling boom extension sections.............................................................157 5.5.5 Transport pins...............................................................................................160 5.5.6 Angle section................................................................................................161 5.5.7 Changing the lifting limit switch and anemometer.............................................................163 5.5.8 SLI connection...............................................................................................164 5.5.9 Reeving the hoist rope.......................................................................................167 5.6 Driving with rigged crane and boom extension.......................................................................171 5.6.2 Position of the boom.........................................................................................172 5.6.3 Driving the rigged truck crane...............................................................................178 5.7 Operation with the boom extension..................................................................................181 5.7.1 Telescoping with rigged boom extension.......................................................................184 5.8 Maintenance plans..................................................................................................185 5.8.1 Maintenance plan M 1: monthly / after 100 Bh.................................................................185 5.9 Lubricant table....................................................................................................187 5.10 Maintenance work..................................................................................................189 5.10.1 Lubricating the fall-back guard.............................................................................189 5.10.2 Lubricating connecting pins.................................................................................189 6 Luffing jib..............................................................................................................193 6.1 Additional operating and display elements in the crane cab.........................................................193 6.1.1 Location of the additional operating and display elements....................................................194 6.1.2 Function of the additional operating and display elements....................................................196 6.2 Components and Identification......................................................................................199 6.3 Combination possibilities..........................................................................................203 6.4 Attachment points..................................................................................................205 6.5 Rigging luffing jib................................................................................................207 6.5.1 CHECKLIST: Rigging luffing jib...............................................................................207 6.5.2 CHECKLIST: Unrigging luffing jib.............................................................................212 6.6 Description of rigging work........................................................................................217 6.6.1 Rigging mode of the truck crane during installation of luffing jib...........................................217 6.6.2 Installing/disassembling luffing control arm.................................................................218 6.6.3 Rigging/Unrigging backstop...................................................................................220 6.6.4 Handling the pins............................................................................................222 6.6.5 Installing/disassembling foot section........................................................................223 6.6.6 Raising/placing the luffing control arm......................................................................224 6.6.7 Preparing the upper hook block for rigging...................................................................226 6.6.8 Securing the upper hook block on the luffing control arm.....................................................227 6.6.9 Removing the upper hook block from the luffing control arm...................................................229 6.6.10 Installing/disassembling boom sections and suspension bars..................................................231 6.6.11 Transport pins..............................................................................................235 6.6.12 Changing the lifting limit switch and anemometer............................................................237 6.6.13 SLI connection..............................................................................................239 6.6.14 Electric connection.........................................................................................241 6.6.15 Reeving the hoist rope......................................................................................244 6.6.16 Telescoping with the luffing jib............................................................................248 6.6.17 Derricking luffing jib when rigging.........................................................................251 6.6.18 Derricking main boom with installed luffing jib.............................................................253 6.6.19 Bringing the luffing jib into working position..............................................................254 6.6.20 Preparing the luffing jib for unrigging.....................................................................256 6.7 Operation with the luffing jib.....................................................................................259 6.8 Driving with rigged crane and luffing jib..........................................................................265 6.8.1 Driving route................................................................................................265 6.8.2 Position of the boom.........................................................................................266 6.8.3 Driving the rigged truck crane...............................................................................273 6.8.4 Luffing jib malfunctions.....................................................................................275 6.9 Maintenance plans..................................................................................................277 6.9.1 Maintenance plan M 1: monthly / after 100 Bh.................................................................277 6.10 Lubricant table...................................................................................................279 6.11 Maintenance work..................................................................................................281 6.11.1 Lubricating the fall-back guard.............................................................................281 6.11.2 Lubricating connecting pins.................................................................................281 6.11.3 Checking the nitrogen and oil pressure in the backstop......................................................282 7 Heavy load lattice extension.............................................................................................289 7.1 Components and identification......................................................................................289 7.2 Combination possibilities..........................................................................................291 7.3 Slinging points....................................................................................................293 7.4 Rigging the heavy load lattice extension...........................................................................295 7.4.1 CHECKLIST: Rigging the heavy load lattice extension..........................................................295 7.4.2 CHECKLIST: Unrigging the heavy load lattice extension........................................................297 7.5 Description of rigging work........................................................................................299 7.5.1 Truck crane rigging mode during installation of the heavy load lattice extension.............................299 7.5.2 Handling the pins............................................................................................300 7.5.3 Installing/removing heavy load lattice extension sections....................................................300 7.5.4 Angle piece..................................................................................................303 7.5.5 Changing the lifting limit switch and anemometer.............................................................305 7.5.6 SLI Connection...............................................................................................306 7.5.7 Reeving the hoist rope.......................................................................................309 7.6 Operation with the heavy load lattice extension....................................................................313 7.6.1 Crane movements..............................................................................................314 7.7 Turning loads with the heavy load lattice extension................................................................317 7.8 Driving with rigged crane and heavy load lattice extension installed...............................................321 7.8.1 Driving route................................................................................................321 7.8.2 Position of the boom.........................................................................................322 7.8.3 Driving the rigged crane.....................................................................................325 8 Index....................................................................................................................331
Questions? Email us: [email protected]
https://vimeo.com/874092600?share=copy
PLEASE NOTE:
- This is the same manual used by the dealers to diagnose and troubleshoot your vehicle
- You will be directed to the download page as soon as the purchase is completed. The whole payment and downloading process will take anywhere between 2-5 minutes
- Need any other service / repair / parts manual, please feel free to contact [email protected] . We still have 50,000 manuals unlisted
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Grove GMK 4080-1 Operating Instructions Manual Part 1 (Driving) - PDF DOWNLOAD

Grove GMK3055 GMK3050-1 Operating Instruction Lattice Extension Manual

Grove GMK 5220 Operating Instructions Manual Part 1 (Driving) - PDF DOWNLOAD
