★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
๐Ÿข
Trusted Business
Verified & Licensed
๐Ÿ›ก๏ธ
Virus Free Files
100% Safe Downloads
๐Ÿ”’
Secure Payment
SSL Protected
โšก
Instant Delivery
Available Immediately

Grove Crane GMK 3050-2 Spare Lattice Extension Operating Manual 3303017 – PDF DOWNLOAD

$28.95

Grove Crane GMK 3050-2 Spare Lattice Extension Operating Manual 3303017 – PDF DOWNLOAD

โšก
Instant PDF Download
Available immediately
๐Ÿ’พ
Save to Your Device
Download & keep forever
๐Ÿ›ก๏ธ
Antivirus Scanned
100% virus-free
๐ŸŒ
Trusted Worldwide
175,000+ customers

Description

Grove Crane GMK 3050-2 Spare Lattice Extension Operating Manual 3303017 – PDF DOWNLOAD

FILE DETAILS:

Grove Crane GMK 3050-2 Spare Lattice Extension Operating Manual 3303017 – PDF DOWNLOAD

Language : English
Pages : 308
Downloadable : Yes
File Type : PDF

DESCRIPTION:

Grove Crane GMK 3050-2 Spare Lattice Extension Operating Manual 3303017 – PDF DOWNLOAD

Safety instructions for working with a lattice extension:

This chapter contains additional safety instructions only for safe use of the lattice extensions described in this operating manual.

Working at heights:

  • If there is a risk of falling when carry out work on the truck crane, suitable equip- ment must be
    used to prevent falling (e.g. ladder, lifting platform, auxiliary crane).
  • The lattice extensions are provided with clamps for positioning a ladder. Place the ladder between
    the clamps so that it cannot slip off.
  • If despite using such equipment the risk of falling cannot be minimised you must protect yourself
    and any assisting personnel by using fall arrest systems.
  • The points to which the fall arrest system can be attached on the truck crane are indicated by the
    symbol shown here.
Slinging :
  • Attach parts only at the designated slinging points. If no slinging points are provided, then observe the centre of gravity specifications.
  • In this way you prevent the attached parts from slipping off, falling and causing injury during
    installation or removal.
Locks :
Always secure the pins at the connection points and also at the holders using the appropriate locks. This prevents unsecured pins from coming loose, falling out and causing injuries.
Rigging mode:
  • For crane operation with the lattice extension folded, comply with the rigging mode. That prevents damage to the main boom or lattice extension, and prevents the lattice extension from falling during crane operation.
  • For on-road driving with the lattice extension, comply with the rigging mode. This prevents the permissible vehicle width or height from being exceeded.
Two cranes :
Lifting loads simultaneously with two cranes is particularly dangerous. Carry out this type of work with special caution.

TABLE OF CONTENTS:

Grove Crane GMK 3050-2 Spare Lattice Extension Operating Manual 3303017 – PDF DOWNLOAD

Lattice extension operating manual......................................................................  1
	Additional pages....................................................................................  3
		Swing-away lattice..............................................................................  3
	Table of contents...................................................................................  7
	1 Overview.......................................................................................... 29
		Validity of this operating manual............................................................... 29
			Validity of this operating manual........................................................... 29
			Prerequisites for installation and operation................................................ 29
			References to other operating manuals....................................................... 29
		Information about this operating manual......................................................... 29
		Lattice extension described..................................................................... 30
		Terms used...................................................................................... 31
			Lattice extension parts..................................................................... 31
			Additional equipment........................................................................ 32
	2 Basic safety instructions......................................................................... 33
		Other applicable documents...................................................................... 33
		Safety instructions for working with a lattice extension........................................ 34
			Working at heights.......................................................................... 34
			Slinging.................................................................................... 34
			Locks....................................................................................... 34
			Rigging mode................................................................................ 34
			Two cranes.................................................................................. 34
	3 Operating elements................................................................................ 35
		On the derricking swing-away lattice............................................................ 35
		In the crane cab................................................................................ 36
			Overview.................................................................................... 36
			At the right-hand control console........................................................... 37
			On the CCS control unit..................................................................... 37
				Menu with independent displays.......................................................... 37
				Enter rigging mode/telescope status menu................................................ 38
		Other operating elements........................................................................ 39
			On the carrier.............................................................................. 39
	4 Rigging work on the main boom..................................................................... 41
		Hose drum....................................................................................... 41
			Slinging points............................................................................. 41
			Dimensions and weights...................................................................... 42
		Rigging work on the hose drum................................................................... 43
			Installing/removing the hose drum........................................................... 43
				Removing................................................................................ 45
			Inserting/releasing the locking device on the hose drum..................................... 47
			Positions of the hydraulic connections...................................................... 48
				Working with the lattice extension...................................................... 48
				Main boom operation..................................................................... 48
	5 Swing-away lattice................................................................................ 49
		Operations planning............................................................................. 49
			Permissible combinations.................................................................... 49
			Dimensions and weights...................................................................... 50
			Identification.............................................................................. 51
		Transport conditions............................................................................ 53
			Overview.................................................................................... 53
			Transport conditions โ€“ Instructions for checking............................................ 55
			Transport conditions โ€“ Folded โ€“ Swing-away lattice 15.0 m................................... 57
			Transport condition โ€“ Folded โ€“ Swing-away lattice 8.7 m..................................... 61
			Transport condition โ€“ Folded โ€“ Section 1 only............................................... 63
			Transport condition โ€“ Removed โ€“ Swing-away lattice.......................................... 64
			Transport condition โ€“ Removed โ€“ Main boom................................................... 66
		Checklists for rigging work..................................................................... 67
			Symbols and their representation............................................................ 67
			Overview.................................................................................... 68
			CHECKLIST: Installation โ€“ in working position............................................... 69
			CHECKLIST: Installation โ€“ in transport position............................................. 73
			CHECKLIST: Removal โ€“ from working position.................................................. 78
			CHECKLIST: Removal โ€“ from transport position................................................ 82
			CHECKLIST: Rigging in working position โ€“ 8.7 m.............................................. 84
			CHECKLIST: Rigging in working position โ€“ 15.0 m............................................. 88
			CHECKLIST: After rigging in the working position............................................ 93
			CHECKLIST: Before rigging in the transport position......................................... 95
			CHECKLIST: Rigging in transport position โ€“ 8.7 m............................................ 97
			CHECKLIST: Rigging in transport position โ€“ 15.0 m...........................................101
		Rigging work โ€“ General information..............................................................105
			Slinging points.............................................................................105
			Securing the swing-away lattice with the guide rope.........................................107
			Folding out / folding in the deflection sheave..............................................108
		Rigging work โ€“ Establishing / separating connections............................................109
			Preparing the truck crane...................................................................109
			Overview of the rigging ranges..............................................................110
			Range 1 โ€“ Folded โ€“ Slewing connection.......................................................111
			Range 1 โ€“ Folded down โ€“ Main boom / section 2...............................................112
			Range 1 โ€“ Installing/removing โ€“ Main boom / section 2.......................................113
			Range 1 โ€“ Unrigging โ€“ Slewing connection....................................................114
			Range 1 โ€“ Installation โ€“ Slewing connection.................................................115
			Range 2 โ€“ Main boom / section 2.............................................................116
			Range 3 โ€“ Folded โ€“ Main boom / section 1 or section 1 / section 2...........................117
			Range 3 โ€“ Folded down โ€“ Section 1 / section 2...............................................118
			Range 3 โ€“ Installing/removing โ€“ Main boom / section 1.......................................119
			Range 4 โ€“ Main boom / section 1.............................................................120
			Range 4 โ€“ Main boom / section 2.............................................................121
			Range 5 โ€“ Folded โ€“ Section 1 / section 2....................................................122
			Range 5 โ€“ Folded down โ€“ Section 1 / section 2...............................................123
			Range 5 โ€“ Installing / removing โ€“ Section 1 / section 2.....................................124
		Relieving the connecting points.................................................................127
			Derricking swing-away lattice...............................................................127
			Inclinable swing-away lattice...............................................................127
			Inclinable swing-away lattice โ€“ with rigging aid............................................128
		Rigging work โ€“ Swinging operations..............................................................129
			Swinging the swing-away lattice.............................................................129
			Slewing section 1...........................................................................131
		Rigging work โ€“ Hydraulic connections............................................................133
		Rigging work โ€“ Electrical connections...........................................................135
			Overview....................................................................................135
			Main boom / section 2.......................................................................136
			Section 1 โ€“ section 2.......................................................................138
		Further rigging work............................................................................141
			Fitting / removing the hoist rope...........................................................141
				Fitting.................................................................................141
				Removing................................................................................142
			Possible reeving methods....................................................................143
			Installing/removing the lifting limit switch................................................144
				Installing..............................................................................144
				Removing................................................................................145
			Installing/removing the anemometer and air traffic control light............................146
				Installing..............................................................................146
				Removing................................................................................147
			Installing/removing the camera..............................................................148
				Installing..............................................................................148
				Removing................................................................................149
		Rigging work โ€“ Derricking the swing-away lattice................................................151
			With the hand-held control..................................................................151
			With the control unit on section 2..........................................................152
		Rigging work โ€“ Derricking the swing-away lattice................................................153
			With auxiliary crane........................................................................153
			Without auxiliary crane.....................................................................154
				Entering the RCL code...................................................................154
				Setting the angle.......................................................................155
				Setting the angle to 0ยฐ.................................................................157
				Inclining the truck crane...............................................................159
		Operation with swing-away lattice...............................................................161
			Setting the RCL.............................................................................161
				Input...................................................................................161
			Derricking the main boom....................................................................163
			Telescoping with a rigged swing-away lattice................................................163
			Derricking the swing-away lattice during operation..........................................164
				Switching on the derricking gear........................................................164
				Raising and lowering....................................................................164
				Switching off the derricking gear.......................................................165
			Checking the wind speed.....................................................................166
			Information about main boom operation when the swing- away lattice is installed.............167
			Instructions for turning loads over.........................................................168
		Maintenance.....................................................................................169
			Maintenance plan W..........................................................................169
			Maintenance plan M 1........................................................................169
			Maintenance plan M 3........................................................................169
			Maintenance plan M 12.......................................................................169
			Greasing the piston rod.....................................................................170
				Prerequisite............................................................................170
			Lubricating the pins........................................................................171
				Grease..................................................................................171
				Prerequisite............................................................................171
				Lubrication.............................................................................171
			Checking the sheaves........................................................................172
				Grease..................................................................................172
				Prerequisite............................................................................172
				Check...................................................................................172
			Lubricating joints..........................................................................173
				Grease..................................................................................173
		Troubleshooting.................................................................................174
			Troubleshooting table.......................................................................174
	6 Heavy load lattice extension 1.8 m................................................................175
		Possible operating modes........................................................................175
		Operations planning.............................................................................177
			Permissible combinations....................................................................177
			Dimensions and weights......................................................................177
				Heavy load lattice extension............................................................177
				Shackle.................................................................................178
				Sheaves package.........................................................................178
			Identification..............................................................................179
		Transport conditions............................................................................181
			Transport conditions โ€“ Notes on checking....................................................181
			Transport condition โ€“ Folded................................................................183
			Transport condition โ€“ Removed...............................................................184
		Checklists for rigging work.....................................................................185
			Symbols.....................................................................................185
			Overview....................................................................................185
			CHECKLIST: Installation โ€“ in operating position.............................................186
			CHECKLIST: Installation โ€“ in transport position.............................................191
			CHECKLIST: Removal โ€“ From the operating position............................................193
			CHECKLIST: Removal โ€“ From transport position................................................197
			CHECKLIST: Rigging โ€“ In operating position..................................................199
			CHECKLIST: Rigging โ€“ in transport position..................................................203
		Rigging work โ€“ General information..............................................................207
			Slinging points.............................................................................207
				Heavy load lattice extension............................................................207
			Securing the heavy load lattice extension with the guide rope...............................208
			Preparing the truck crane...................................................................209
		Rigging work โ€“ Conversion according to the operating mode.......................................211
			Installing/removing the air traffic control light...........................................211
				Installing..............................................................................211
				Removal.................................................................................212
			Installing/removing the shackle.............................................................213
				Installing..............................................................................213
				Removal.................................................................................214
		Rigging work โ€“ Establishing / separating connections............................................215
			Installing/removing โ€“ Operating position....................................................215
			Installing/removing โ€“ Transport position....................................................217
		Rigging work โ€“ Changing the position of the heavy load lattice extension........................219
			From transport position to operating position...............................................219
			From the operating position to the transport position.......................................222
		Further rigging work............................................................................225
			Fitting / removing the hoist rope...........................................................225
			Notes on reeving............................................................................226
			Possible reeving methods....................................................................226
			Folding the rope attachment point out/in....................................................228
			Installing/removing the lifting limit switch................................................229
				Installing..............................................................................229
				Removal.................................................................................230
			Installing/removing the anemometer and air traffic control light............................231
			Installing/removing the camera..............................................................232
				Installing..............................................................................232
				Removal.................................................................................233
			Folding the shackle in/out..................................................................234
		Inclining the heavy load lattice extension......................................................235
			Prerequisites...............................................................................235
			Preparations................................................................................235
			Setting the angle...........................................................................236
			After setting the angle.....................................................................237
		Heavy load lattice extension โ€“ Operation with hoist rope........................................239
			Setting the RCL.............................................................................239
				Input...................................................................................239
				Shutdown................................................................................240
			Derricking the main boom....................................................................241
			Telescoping with a rigged heavy load lattice extension......................................241
			Checking the wind speed.....................................................................242
			Information about main boom operation when the heavy load lattice extension is installed....243
			Instructions for turning loads over.........................................................244
		Heavy load lattice extension โ€“ Operation with a shackle.........................................245
			Setting the RCL.............................................................................245
				Input...................................................................................245
				Shutdown................................................................................246
			Derricking the main boom....................................................................247
				Lifting the load........................................................................247
				Derricking..............................................................................248
			Telescoping the main boom...................................................................249
			Other applicable sections...................................................................250
		Maintenance.....................................................................................251
			M 1 maintenance plan........................................................................251
			M 3 maintenance plan........................................................................251
			M 12 maintenance plan.......................................................................251
			Lubricating the pins........................................................................252
				Grease..................................................................................252
				Prerequisite............................................................................252
			Checking the sheaves........................................................................253
				Prerequisite............................................................................253
			Lubricate the shackle.......................................................................254
				Grease..................................................................................254
				Prerequisite............................................................................254
	7 Auxiliary single-sheave boom top..................................................................255
		Operations planning.............................................................................255
			Permissible combinations....................................................................255
			Dimensions and weights......................................................................255
			Identification..............................................................................256
		Transport conditions............................................................................257
			Transport conditions โ€“ Instructions for checking............................................257
			Transport condition โ€“ Folded................................................................259
			Transport condition โ€“ Removed...............................................................260
		Rigging work โ€“ General information..............................................................261
			Slinging points.............................................................................261
			Securing the auxiliary single-sheave boom top with guide rope...............................262
		Rigging work โ€“ Installing/removing..............................................................263
			In working position.........................................................................263
			In transport position.......................................................................266
		Rigging work โ€“ Changing the position of the auxiliary single-sheave boom top....................269
			From transport position to working position.................................................269
			From the working position to the transport position.........................................270
		Further rigging work............................................................................271
			Fitting / removing the hoist rope...........................................................271
			Possible reeving methods....................................................................272
			Installing/removing the lifting limit switch................................................273
				Installing..............................................................................273
				Removing................................................................................274
			Installing/removing the anemometer and air traffic control light............................275
			Installing/removing the camera..............................................................275
		Operation with auxiliary single-sheave boom top.................................................277
			Setting the RCL.............................................................................277
				Input...................................................................................277
				Shutdown................................................................................278
			Checking the wind speed.....................................................................279
			Instructions for turning loads over.........................................................280
		Maintenance.....................................................................................281
			Maintenance plan M 1........................................................................281
			Maintenance plan M 3........................................................................281
			Lubricating the pins........................................................................282
				Grease..................................................................................282
				Prerequisite............................................................................282
			Checking the sheaves........................................................................283
				Prerequisite............................................................................283
	8 Turning loads over................................................................................285
		Prerequisites...................................................................................285
		Setting the RCL.................................................................................286
			Entering the reeving........................................................................286
			Switching over to the auxiliary hoist.......................................................286
		Turning a load over.............................................................................287
	9 Driving with a rigged crane.......................................................................289
		Safety instructions.............................................................................289
		Driving distance................................................................................291
		Permissible rigging modes and axle loads........................................................292
			Notes.......................................................................................292
			Notes on the tables.........................................................................292
			Swing-away lattice..........................................................................294
				Swing-away lattice 8.7 m................................................................294
				Swing-away lattice 15.0 m (49.2 ft).....................................................295
			Heavy load lattice extension 1.8 m..........................................................296
			Auxiliary single-sheave boom top............................................................297
		Before driving..................................................................................298
		While driving...................................................................................298
		After driving...................................................................................298
	10 Index............................................................................................299
		A...............................................................................................301
		D...............................................................................................301
		H...............................................................................................302
		I...............................................................................................303
		L...............................................................................................303
		O...............................................................................................303
		R...............................................................................................303
		S...............................................................................................303
		T...............................................................................................305

IMAGES PREVIEW OF THE MANUAL:

Need help? Contact: [email protected]

PLEASE NOTE:

  • This is the SAME manual used by the dealers to troubleshoot any faults in your vehicle. This can be yours in 2 minutes after the payment is made.
  • Contact us atย [email protected]ย should you have any queries before your purchase or that you need any other service / repair / parts operators manual.

S.V

What Our Customers Say

โ˜…โ˜…โ˜…โ˜…โ˜… Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    ๐Ÿ›’
    Recently Purchased
    ๐Ÿ•’ verified order