Grove Crane GMK 4080-1 Lattice Extension Operating Instructions Manual 3113180 – PDF DOWNLOAD
$28.95
Grove Crane GMK 4080-1 Lattice Extension Operating Instructions Manual 3113180 – PDF DOWNLOAD
Description
Grove Crane GMK 4080-1 Lattice Extension Operating Instructions Manual 3113180 – PDF DOWNLOAD
FILE DETAILS:
Grove Crane GMK 4080-1 Lattice Extension Operating Instructions Manual 3113180 – PDF DOWNLOAD
Language : English
Pages : 264
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

Need help? Contact: [email protected]
DESCRIPTION:
Grove Crane GMK 4080-1 Lattice Extension Operating Instructions Manual 3113180 – PDF DOWNLOAD
Important information:
1.1 About these operating instructions:
Validity of these operating instructions:
- These operating instructions only apply to lattice extensions which were delivered by Manitowoc
Crane Group Germany GmbH. - In addition, for the operation of the truck crane with a lattice extension described in these
operating instructions, all details in the included Operating instructions of the GMK 4080-1 for
which the lattice extension was delivered from the factory, are applicable.
Prerequisites for assembly and operation:
The lattice extensions described in these operating instructions may only be operated together with
a GROVE truck crane GMK 4080-1 whose serial number is identical with the serial number that is
marked on the lattice extensions.
Safety instructions:
The operation of GMK 4080-1 with one of the lattice extensions described in these operating
instructions is subject to:
– all the basic safety instructions to be found in the subsequent section Basic safety
instructions and
– all the safety instructions contained in the supplied operating instructions of GMK 4080-1.
References to other operating instructions:
Cross references to other operating or maintenance instructions are shown in the following forms:
à GMK 4080-1 operating instructions, Part 2 Crane operation – Rigging work
The number for the chapter on Rigging work is found at the front, on the sec- ond page of the
operating instructions specified.
or
à GMK 4080-1 operating instructions – Safe load indicator
The corresponding page number can be found in the index, under the entry
for Safe load indicator.
TABLE OF CONTENTS:
Grove Crane GMK 4080-1 Lattice Extension Operating Instructions Manual 3113180 – PDF DOWNLOAD
1 Important information......................................................................................... 7 1.1 About these operating instructions...................................................................... 7 Validity of these operating instructions................................................................ 7 Prerequisites for assembly and operation................................................................ 7 Safety instructions.................................................................................... 7 References to other operating instructions.............................................................. 7 1.2 Basic safety instructions............................................................................... 8 1.2.1 Warnings and symbols.............................................................................. 8 1.3 Intended use............................................................................................ 9 1.4 Organizational measures................................................................................. 11 1.5 Personnel qualifications................................................................................ 13 1.6 Safety instructions for truck crane work................................................................ 14 2 Transport dimensions and weights.............................................................................. 19 2.1 Swing-away lattice extension............................................................................ 19 2.2 Boom extension.......................................................................................... 19 2.3 Auxiliary single-sheave boom top........................................................................ 19 2.4 Heavy load lattice extension............................................................................ 20 3 8.7/15 m swing-away lattice extension......................................................................... 23 3.1 Validity................................................................................................ 23 3.2 Additional operating and display elements............................................................... 23 3.2.1 In the crane cab.................................................................................. 24 At the control console right........................................................................ 24 On the crane control display........................................................................ 25 On the safe load indicator.......................................................................... 26 3.2.2 Operating and display elements on the hand-held control........................................... 27 3.2.3 Operating and display instruments on the swing-away lattice extension............................. 28 3.3 Identification of the swing-away lattice extension...................................................... 29 Serial number on section1.............................................................................. 30 Serial number on section2.............................................................................. 30 3.4 Composition of the swing-away lattice extension......................................................... 31 3.5 Centres of gravity for slinging......................................................................... 33 3.6 Checklists for rigging work............................................................................. 35 3.6.1 Overview of the required rigging work............................................................. 35 3.6.2 CHECKLIST: Installing 8.7/15 m swing-away lattice extension....................................... 36 3.6.3 CHECKLIST: Removing 8.7/15 m swing-away lattice extension......................................... 38 For a rigged lattice extension...................................................................... 38 For a folded lattice extension...................................................................... 40 3.6.4 CHECKLIST: Rigging the 8.7/15 m swing-away lattice extension...................................... 42 3.6.5 CHECKLIST: Unrigging the 8.7/15m swing-away lattice extension.................................... 48 3.7 Description of rigging work............................................................................. 55 3.7.1 Preparing the truck crane for rigging............................................................. 55 Prerequisites for rigging........................................................................... 55 Prerequisites for unrigging......................................................................... 55 Securing lattice extension with cord................................................................ 56 3.7.2 Checking the transport condition.................................................................. 57 Transport condition with removed lattice extension.................................................. 62 3.7.3 Checking the anti-twist device on the hose drum................................................... 63 3.7.4 Establishing/disconnecting the hydraulic connection............................................... 65 Establishing the hydraulic connection............................................................... 65 Breaking the hydraulic connection................................................................... 66 3.7.5 Guides and holders for the hydraulic hoses........................................................ 67 When unrigging...................................................................................... 67 When rigging........................................................................................ 68 3.7.6 Connections with folded lattice extension......................................................... 69 Connections in the Front 1 area..................................................................... 69 Connections in the Front 2 area..................................................................... 71 Connections in the middle area...................................................................... 73 Connections in the rear area........................................................................ 75 3.7.7 Securing/releasing section 2..................................................................... 77 3.7.8 Connecting/disconnecting the slewing connection................................................... 79 Creating a slewing connection....................................................................... 79 Releasing a slewing connection...................................................................... 80 3.7.9 Connections on the left and right of the main boom head........................................... 81 Establishing connections............................................................................ 81 Releasing connections.............................................................................. 82 Relieving the connecting points..................................................................... 84 3.7.10 Swivelling the lattice extension when rigging.................................................... 87 When rigging – section1............................................................................ 87 When unrigging – section1.......................................................................... 88 When rigging – section2............................................................................ 89 When unrigging – section2.......................................................................... 90 3.7.11 Establishing/releasing connections on the lattice extension..................................... 92 Section1 and section2 installed................................................................... 93 Only section1 installed........................................................................... 94 3.7.12 Electrical connections on the lattice extension.................................................. 95 On 8.7 m swing- away lattice extension.............................................................. 95 On 15 m- swing- away lattice extension.............................................................. 97 3.7.13 Unfolding/folding the deflection sheave.......................................................... 98 Folding out the deflection sheave.................................................................. 98 Folding in the deflection sheave................................................................... 99 3.7.14 Positioning/removing the hoist rope..............................................................100 Positioning hoist rope.............................................................................100 Removing the hoist rope............................................................................100 Possible reeving methods on the lattice extension..................................................101 3.7.15 Installing/removing the lifting limit switch.....................................................102 Overriding connection on main boom..................................................................102 On 8.7 m swing- away lattice extension..............................................................103 On 15 m swing- away lattice extension...............................................................104 3.7.16 Installing/removing the anemometer...............................................................105 On 8.7 m swing- away lattice extension..............................................................105 On 15 m swing- away lattice extension...............................................................106 3.7.17 Air traffic control light – electrical connection................................................107 Establishing the electrical connection..............................................................107 Disconnecting the electrical connection.............................................................108 3.7.18 Derricking the lattice extension.................................................................109 When rigging........................................................................................109 During operation....................................................................................111 3.7.19 Setting the angle – with the auxiliary crane.....................................................112 Pin positions.......................................................................................113 3.7.20 Setting the angle – without the auxiliary crane.................................................114 Entering the RCL code..............................................................................114 Setting an angle of 20 or 40......................................................................115 Setting 0 angle....................................................................................117 Inclining the truck crane...........................................................................119 3.7.21 Transportation on a separate vehicle.............................................................120 3.8 Operation with the lattice extension....................................................................121 3.8.1 Setting the RCL...................................................................................122 Derrickable lattice extension.......................................................................122 Inclinable lattice extension........................................................................123 3.8.2 Raising and setting down the main boom............................................................124 Raising.............................................................................................124 Setting down........................................................................................124 3.8.3 Telescoping with rigged lattice extension.........................................................125 3.8.4 Information about the RCL shutdown................................................................126 3.8.5 Procedure if the permissible wind speed is exceeded...............................................127 3.8.6 Information about the main boom operation when the lattice extension is folded/rigged.............128 Folded..............................................................................................128 Rigged..............................................................................................128 3.9 Turning loads with the lattice extension................................................................131 3.9.1 Prerequisites.....................................................................................131 3.9.2 Setting the RCL...................................................................................132 3.9.3 Turning a load....................................................................................134 3.10 Driving with rigged crane with a rigged lattice extension..............................................137 3.10.1 Driving route....................................................................................138 3.10.2 Boom positions and axle loads....................................................................139 Notes on the tables.................................................................................139 8.7 m swing-away lattice extension.................................................................140 15 m swing-away lattice extension.................................................................141 3.10.3 Driving the rigged crane.........................................................................142 Closing the slewing gear brake......................................................................142 Retracting the outriggers...........................................................................142 Switching over the suspension locking system........................................................143 Switching on separate steering......................................................................144 Driving.............................................................................................145 Align free on wheels truck crane horizontally.......................................................146 Supporting the truck crane.........................................................................147 3.11 Finding and eliminating malfunctions...................................................................149 3.12 Maintenance work.......................................................................................151 3.12.1 Modules in need of protection during cleaning work...............................................151 3.12.2 Maintenance work M 1, monthly....................................................................152 Pins................................................................................................152 3.12.3 Maintenance work M 12, every twelve months.......................................................153 Lubricate joints on section1.......................................................................153 4 Boom extension................................................................................................157 4.1 Identification and slinging points......................................................................157 4.1.1 Identification....................................................................................157 4.1.2 Slinging points...................................................................................158 4.2 Assembly of boom extensions.............................................................................159 4.3 Checklists for rigging work.............................................................................161 4.3.1 CHECKLIST: 21m rigging of boom extension.........................................................161 4.3.2 CHECKLIST: 21m removing boom extension...........................................................165 4.4 Description of rigging work.............................................................................169 4.4.1 Installing/removing section3.....................................................................169 Removing............................................................................................169 4.4.2 Installing/removing the lattice extension for the boom extension.................................170 Removing............................................................................................171 4.4.3 Hydraulic connection at the boom extension........................................................172 Establishing a connection...........................................................................172 Disconnecting.......................................................................................173 4.4.4 Electrical connection at the boom extension.......................................................174 Establishing a connection...........................................................................174 Disconnecting.......................................................................................175 4.4.5 Fold the deflection sheave in/out on section3....................................................176 Folding out the deflection sheave...................................................................176 Folding in the deflection sheave....................................................................176 4.4.6 Fitting/removing the hoist rope...................................................................177 Positioning the hoist rope..........................................................................177 Removing the hoist rope.............................................................................177 Possible reeving methods............................................................................178 4.5 Working with the boom extension.........................................................................179 4.6 Driving with rigged crane and rigged boom extension.....................................................181 4.6.1 Route.............................................................................................182 4.6.2 Boom positions and axle loads.....................................................................183 Notes on the tables.................................................................................183 21 m boom extension.................................................................................184 4.6.3 Driving the rigged crane..........................................................................185 4.7 Maintenance work........................................................................................187 4.7.1 Maintenance work M1, monthly.....................................................................187 5 Auxiliary single-sheave boom top..............................................................................191 5.1 Identification..........................................................................................191 5.2 Installing/removing auxiliary single-sheave boom top....................................................193 5.2.1 Installing the auxiliary single-sheave boom top...................................................193 5.2.2 Removing the auxiliary single-sheave boom top.....................................................194 5.3 Rigging the auxiliary single-sheave boom top............................................................195 5.3.1 Rigging in transport position.....................................................................195 5.3.2 Rigging in working position.......................................................................196 5.3.3 Attaching and removing the hoist rope.............................................................197 5.3.4 Setting the RCL...................................................................................197 5.3.5 Possible reeving methods on the auxiliary single-sheave boom top..................................198 5.3.6 Lifting limit switch and anemometer...............................................................199 For operation.......................................................................................199 For transport.......................................................................................199 Anemometer..........................................................................................199 5.4 Operation with the auxiliary single-sheave boom top.....................................................201 5.5 Turning loads with the auxiliary single-sheave boom top.................................................203 5.5.1 Prerequisites.....................................................................................203 5.5.2 Setting the RCL...................................................................................204 5.5.3 Turning a load....................................................................................206 5.6 Driving the rigged crane with a rigged auxiliary single- sheave boom top................................209 6 Heavy load lattice extension..................................................................................213 6.1 Identification..........................................................................................213 6.2 Attaching and securing the heavy load lattice extension.................................................215 6.2.1 Slinging point....................................................................................215 6.2.2 Folding in/out rope attachment point..............................................................216 Folding out rope attachment point..................................................................216 Folding in rope attachment point...................................................................216 6.2.3 Securing the heavy load lattice extension with guide rope.........................................217 6.3 Installing / removing the heavy load lattice extension..................................................219 6.3.1 Installing the heavy load lattice extension.......................................................219 6.3.2 Removing the heavy load lattice extension.........................................................221 6.4 Rigging the heavy load lattice extension................................................................223 6.4.1 Rigging in transport position.....................................................................223 6.4.2 Rigging in working position.......................................................................226 6.4.3 Setting the angle position of the heavy load lattice extension....................................229 Installing/removing the chain hoist.................................................................229 Prerequisites.......................................................................................230 Setting 40 angle...................................................................................230 Setting 0 angle....................................................................................231 6.4.4 Attaching and removing the hoist rope.............................................................232 Possible reeving methods on the heavy load lattice extension........................................233 6.4.5 Lifting limit switch and anemometer...............................................................234 For operation.......................................................................................234 For transport.......................................................................................234 Anemometer..........................................................................................234 6.4.6 Transportation on a separate vehicle..............................................................235 6.5 Operation with the heavy load lattice extension.........................................................237 6.5.1 Setting the RCL...................................................................................238 6.5.2 Raising and setting down the main boom............................................................239 Raising.............................................................................................239 Setting down........................................................................................239 6.5.3 Telescoping with rigged heavy load lattice extension..............................................240 6.5.4 Information about the RCL shutdown................................................................241 6.5.5 Procedure if the permissible wind speed is exceeded...............................................241 6.5.6 Information about the main boom operation when the heavy load lattice extension is folded/r.......242 Folded..............................................................................................242 Rigged..............................................................................................242 6.6 Turning loads with the heavy load lattice extension.....................................................245 6.6.1 Prerequisites.....................................................................................245 6.6.2 Setting the RCL...................................................................................246 6.6.3 Turning a load....................................................................................248 6.7 Driving with rigged crane and rigged heavy load lattice extension.......................................251 7 Index.........................................................................................................255 A...........................................................................................................257 B...........................................................................................................257 E...........................................................................................................257 H...........................................................................................................257 I...........................................................................................................258 L...........................................................................................................258 M...........................................................................................................260 O...........................................................................................................260 P...........................................................................................................260 S...........................................................................................................260 T...........................................................................................................260
PLEASE NOTE:
- This is the SAME exact manual used by your dealers to fix your vehicle.
- The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
- Any queries / doubts regarding your purchase, please feel free to contact [email protected]
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Grove GMK4100 4100-L 5095 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

Grove GMK4075 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

Grove GMK 4080-1 Operating Instructions Manual Part 1 (Driving) - PDF DOWNLOAD
