GROVE Crane GMK 4080-2 Lattice Extension Operating Instruction Manual 3302915 – PDF DOWNLOAD
$28.95
GROVE Crane GMK 4080-2 Lattice Extension Operating Instruction Manual 3302915 – PDF DOWNLOAD
Description
GROVE Crane GMK 4080-2 Lattice Extension Operating Instruction Manual 3302915 – PDF DOWNLOAD
FILE DETAILS:
GROVE Crane GMK 4080-2 Lattice Extension Operating Instruction Manual 3302915 – PDF DOWNLOAD
Language : English
Pages : 382
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:
GROVE Crane GMK 4080-2 Lattice Extension Operating Instruction Manual 3302915 – PDF DOWNLOAD
Basic safety instructions:
- In principle, all the basic safety instructions from the Operating instructions GMK4080-2 are
applicable. - Observe also all safety instructions and warnings on the truck crane!
Information regarding the warnings and symbols used; à Operating instructions GMK4080-2.
Other applicable documents:
In addition to the information in this operating manual, all the instructions in the following
sections of the supplied Operating instructions GMK4080-2 are also applicable:
– Intended use
– Improper use
– Organisational measures
– Qualifications of personnel on the GMK4080-2
Safety instructions for working with a lattice extension:
This chapter only contains additional safety instructions for safe use of the lattice extensions
described in these operating instructions.
Working at heights:
- If there is a risk of falling when doing work on the truck crane, suitable equipment must be used
to prevent falling (e. g. ladder, lifting platform, auxiliary crane). - The lattice extensions are provided with brackets for positioning a ladder. Place the ladder
between the brackets so it cannot slip off. - If despite using such equipment the risk of falling cannot be minimised, you must protect yourself
and any assisting personnel by using approved fall prevention safety systems. - The points at which the fall prevention safety system can be attached to on
the truck crane are indicated by the symbol shown here.
TABLE OF CONTENTS:
GROVE Crane GMK 4080-2 Lattice Extension Operating Instruction Manual 3302915 – PDF DOWNLOAD
1 About these operating instructions................................................................................ 29 1.1 Validity.................................................................................................... 29 Validity of these operating instructions.................................................................... 29 Prerequisites for assembly and operation.................................................................... 29 References to other operating manuals....................................................................... 29 1.2 Terms used.................................................................................................. 31 2 Basic safety instructions......................................................................................... 33 2.1 Other applicable documents.................................................................................. 33 2.2 Safety instructions for working with a lattice extension.................................................... 34 Working at heights.......................................................................................... 34 Slinging.................................................................................................... 34 Locks....................................................................................................... 34 Rigging mode................................................................................................ 34 Two cranes.................................................................................................. 34 3 Operating elements................................................................................................ 35 3.1 On the lattice extension.................................................................................... 36 3.1.1 Overview.............................................................................................. 36 3.1.2 Connection section 1/main boom, rear.................................................................. 37 3.1.3 Connection section 2/main boom, rear.................................................................. 37 3.1.4 Connection section 1/main boom, front................................................................. 38 3.1.5 Connection section 1/section 2, front................................................................. 38 3.1.6 Connection section 2/main boom, front................................................................. 39 3.1.7 Connection section 1/section 2, rear.................................................................. 39 3.1.8 Section 2 control unit................................................................................ 40 3.2 In the crane cab............................................................................................ 41 3.2.1 Overview.............................................................................................. 41 3.2.2 On the CCS control unit............................................................................... 42 3.2.3 On the CCS control unit............................................................................... 43 Enter rigging mode/telescope status menu................................................................ 43 3.2.4 At the right-hand control console..................................................................... 44 3.3 On the hand-held control.................................................................................... 45 3.3.1 Connecting hand-held control.......................................................................... 46 Connecting the hand-held control........................................................................ 46 3.4 Other operating elements.................................................................................... 47 3.4.1 Rigging hook.......................................................................................... 47 4 Rigging work on the main boom..................................................................................... 49 4.1 Hose drum................................................................................................... 49 4.1.1 Slinging points....................................................................................... 49 4.1.2 Transport dimensions and weights...................................................................... 50 4.2 Rigging work on the hose drum............................................................................... 51 4.2.1 Fitting/removing the hose drum........................................................................ 51 Installing.............................................................................................. 51 Removing................................................................................................ 52 4.2.2 Checking the locking device on the hose drum.......................................................... 53 4.2.3 Positions of the hydraulic connections during operation............................................... 54 Working with the lattice extension...................................................................... 54 Main boom operation..................................................................................... 55 4.2.4 Positions of the hydraulic hoses when rigging......................................................... 56 When unrigging.......................................................................................... 56 When rigging............................................................................................ 57 5 Swing-away lattice................................................................................................ 59 5.1 Notes on this chapter....................................................................................... 59 5.2 Operations planning......................................................................................... 60 5.2.1 Assembly.............................................................................................. 60 5.2.2 Identification........................................................................................ 61 5.2.3 Slinging points....................................................................................... 62 On section 1............................................................................................ 62 Section 2 and combinations.............................................................................. 62 5.2.4 Transport dimensions and weights...................................................................... 65 5.2.5 Transport condition – removed......................................................................... 66 On the swing- away lattice.............................................................................. 67 On the main boom........................................................................................ 68 5.2.6 Transport condition – folded.......................................................................... 69 Section 1 only.......................................................................................... 69 Section 2 only.......................................................................................... 70 Section 1 and section 2................................................................................. 71 5.3 Checklists for rigging work................................................................................. 73 5.3.1 Overview.............................................................................................. 73 5.3.2 CHECKLIST: Installing the swing-away lattice – in operating position.................................. 75 5.3.3 CHECKLIST: Installing the swing-away lattice – in transport position.................................. 79 5.3.4 CHECKLIST: Removing the swing-away lattice – from operating position.................................. 83 5.3.5 CHECKLIST: Removing the swing-away lattice – from transport position.................................. 89 5.3.6 CHECKLIST: Rigging the swing-away lattice 1.2 + 7.5 m (3.9 + 24.6 ft) – in the operating position..... 93 5.3.7 CHECKLIST: Rigging the swing-away lattice 1.2 + 13.8 m (3.9 + 45.3 ft) – in the operating position.... 97 5.3.8 CHECKLIST: Rigging the swing-away lattice 1.2 + 7.5 m (3.9 + 24.6 ft) – in the transport position.....103 5.3.9 CHECKLIST: Rigging the swing-away lattice 1.2 + 13.8 m (3.9 + 45.3 ft) – in the transport position....109 5.3.10 CHECKLIST: Further rigging work......................................................................115 5.4 Rigging work................................................................................................117 5.4.1 Notes on the position of the telescoping cylinder.....................................................117 5.4.2 Secure the swing-away lattice with guide rope.........................................................118 5.4.3 Establish/disconnect the connection section 2–main boom, front........................................119 Connecting..............................................................................................119 Disconnecting...........................................................................................119 5.4.4 Section 1/main boom, front – establish/disconnect the connection......................................121 Connecting..............................................................................................121 Disconnecting...........................................................................................121 5.4.5 Section 1/section 2, front – establish/disconnect the connection......................................122 Connecting..............................................................................................122 Disconnecting...........................................................................................122 5.4.6 Section 2/main boom, rear – establish/disconnect the connection.......................................123 Connecting..............................................................................................123 Disconnecting...........................................................................................123 5.4.7 Section 1/main boom, rear – establish/disconnect the connection.......................................124 Connecting..............................................................................................124 Disconnecting...........................................................................................124 5.4.8 Establishing/disconnecting the slewing connection.....................................................125 Disconnecting...........................................................................................126 5.4.9 Establishing/disconnecting the connection between the main boom/section 2.............................127 5.4.10 Relieving the strain on the connecting points........................................................128 For derricking swing-away lattice.......................................................................128 For a derricking swing-away lattice without hydraulic rigging aid.......................................128 For a derricking swing-away lattice with hydraulic rigging aid..........................................129 5.4.11 Section 1/section 2 – Establish/disconnect the left-hand connection..................................131 5.4.12 Section 1/section 2 – Establish/disconnect the right-hand connection.................................133 5.4.13 Swinging the swing-away lattice......................................................................135 5.4.14 Swinging section 1...................................................................................137 5.4.15 Establishing/disconnecting the hydraulic connection – when rigging...................................138 Connecting..............................................................................................138 Disconnecting...........................................................................................139 5.4.16 Establishing/disconnecting the hydraulic connection – when installing................................140 Connecting..............................................................................................140 Disconnecting...........................................................................................141 5.4.17 Establishing/disconnecting electrical connections....................................................142 Section 2 – Main boom...................................................................................143 Section 1 – section 2...................................................................................145 5.4.18 Fold the deflection sheave in/out on section 2.......................................................147 Folding out.............................................................................................147 Folding in..............................................................................................148 5.4.19 Attaching/removing the hoist rope....................................................................149 Fitting.................................................................................................149 Removing................................................................................................150 Reeving options.........................................................................................151 5.4.20 Installing/removing the lifting limit switch.........................................................152 Installing..............................................................................................152 Removing................................................................................................153 5.4.21 Installing/removing the anemometer and air traffic control light.....................................154 Installing..............................................................................................154 Removing................................................................................................155 5.4.22 Derricking the swing-away lattice for rigging work – hand-held control...............................156 5.4.23 Installing/removing the camera.......................................................................157 Installing..............................................................................................157 Removing................................................................................................158 5.4.24 Derricking the swing-away lattice – Section 2 control unit...........................................159 5.4.25 Setting the angle – with an auxiliary crane..........................................................160 5.4.26 Setting the angle – without an auxiliary crane.......................................................161 Enter the RCL code......................................................................................161 Setting the angle.......................................................................................162 Setting a 0° angle......................................................................................164 Inclining the truck crane...............................................................................166 5.5 Operation with swing-away lattice...........................................................................167 5.5.1 Setting the RCL.......................................................................................167 Input...................................................................................................167 Shutdown................................................................................................168 5.5.2 Derricking the main boom..............................................................................168 Slewing range of 360°...................................................................................168 5.5.3 Telescoping with rigged swing-away lattice............................................................169 Slewing range of 360°...................................................................................169 5.5.4 Derricking the swing-away lattice in operation........................................................169 Switching on the derricking gear........................................................................169 Raising and lowering....................................................................................170 Switching off the derricking gear.......................................................................170 5.5.5 Procedure if permissible wind speed is exceeded.......................................................171 5.5.6 Information about the main boom operation when the swing-away lattice is folded/rigged................172 Folded..................................................................................................172 Rigged..................................................................................................172 5.5.7 Instructions for turning loads over...................................................................173 5.6 Maintenance.................................................................................................175 5.6.1 Maintenance plan W....................................................................................175 5.6.2 Maintenance plan M 1..................................................................................175 5.6.3 Maintenance plan M 3..................................................................................175 5.6.4 Maintenance plan M 12.................................................................................176 5.6.5 Description of maintenance work.......................................................................176 Pins....................................................................................................176 Sheaves.................................................................................................178 Piston rod..............................................................................................179 Joints..................................................................................................180 5.7 Finding and eliminating malfunctions........................................................................181 5.7.1 Troubleshooting table.................................................................................181 6 Boom extension....................................................................................................183 6.1 Notes on this chapter.......................................................................................183 6.2 Operations planning.........................................................................................185 6.2.1 Assembly..............................................................................................185 6.2.2 Identification........................................................................................186 Section 3...............................................................................................186 6.2.3 Slinging points.......................................................................................187 Section 3...............................................................................................187 6.2.4 Transport dimensions and weights......................................................................188 6.2.5 Transport condition...................................................................................188 Section 3...............................................................................................188 6.3 Checklists for rigging work.................................................................................189 6.3.1 Overview..............................................................................................189 6.3.2 CHECKLIST: Installing the boom extension..............................................................190 6.3.3 CHECKLIST: Removing the boom extension................................................................195 6.4 Description of the rigging work.............................................................................201 6.4.1 Section 3 – Folding out/folding in the deflection sheave..............................................201 6.4.2 Section 3/main boom – Establish/disconnect the connection.............................................202 6.4.3 Section 3/main boom – Establish/disconnect the electrical connections.................................204 6.4.4 Section 3/main boom – Establish/disconnect the hydraulic connection...................................206 6.4.5 Section 3/swing-away lattice – Establish/disconnect the connection....................................207 6.4.6 Section 3/swing-away lattice – Establish/disconnect the electrical connections........................209 6.4.7 Section 3/swing-away lattice – Establish/disconnect the hydraulic connection..........................211 6.4.8 Section 3 – Fitting/removing the hoist rope...........................................................212 6.5 Operation with boom extension...............................................................................213 6.5.1 Setting the RCL.......................................................................................213 Input...................................................................................................213 Shutdown................................................................................................214 6.5.2 Derricking, telescoping the main boom.................................................................214 Slewing range of 360°...................................................................................214 6.5.3 Procedure if permissible wind speeds are exceeded.....................................................215 6.5.4 Instructions for turning loads over...................................................................215 6.6 Maintenance.................................................................................................217 6.6.1 Maintenance plan M 1..................................................................................217 6.6.2 Maintenance plan M 3..................................................................................217 6.6.3 Description of maintenance work.......................................................................218 7 Heavy load lattice extension, 2.0 m (6.6 ft)......................................................................219 7.1 Operations planning.........................................................................................219 7.1.1 Assembly..............................................................................................219 7.1.2 Identification........................................................................................220 7.1.3 Slinging points.......................................................................................221 7.1.4 Transport dimensions and weights......................................................................222 7.1.5 Transport condition...................................................................................223 7.2 Checklists for rigging work.................................................................................225 7.2.1 Overview..............................................................................................225 7.2.2 CHECKLIST: Heavy load lattice extension 2.0 m (6.6 ft) installation into the working position.........226 7.2.3 CHECKLIST: Heavy load lattice extension 2.0 m (6.6 ft) Installation into the transport position.......229 7.2.4 CHECKLIST: Heavy load lattice extension 2.0 m (6.6 ft) removal from the working position..............231 7.2.5 CHECKLIST: Heavy load lattice extension 2.0 m (6.6 ft) removal from the transport position............234 7.2.6 CHECKLIST: Heavy load lattice extension 2.0 m (6.6 ft) rigging into the working position..............236 7.2.7 CHECKLIST: Heavy load lattice extension 2.0 m (6.6 ft) rigging into the transport position............239 7.3 Description of the rigging work.............................................................................243 7.3.1 Section 5/main boom– Establish/separate the connection in the working position........................243 7.3.2 Section 5/main boom – Establish/separate the connection in the transport position.....................244 7.3.3 Bringing section 5 from the transport position into the working position..............................246 7.3.4 Bringing section 5 from the working position into the transport position..............................248 7.3.5 Folding the rope attachment point in/out..............................................................250 7.3.6 Section 5 – Setting the angle – with the hoist rope...................................................251 7.3.7 Section 5 – Setting the angle – with a chain hoist....................................................253 7.3.8 Section 5 –Fitting/removing the hoist rope............................................................255 7.3.9 Possible reeving methods on the heavy load lattice extension..........................................256 7.3.10 Installing/removing the lifting limit switch.........................................................257 Installation............................................................................................257 Removing................................................................................................258 7.3.11 Installing / removing the anemometer and air traffic control light...................................259 Installing and removing.................................................................................259 7.3.12 Installing/removing the camera.......................................................................260 Installation............................................................................................260 Removing................................................................................................261 7.4 Operating the heavy load lattice extension..................................................................263 7.4.1 Setting the RCL.......................................................................................263 Input...................................................................................................263 shutdown................................................................................................264 7.4.2 Derricking, telescoping the main boom.................................................................265 Slewing range of 360°...................................................................................265 7.4.3 Procedure if permissible wind speeds are exceeded.....................................................266 7.4.4 Instructions for turning loads over...................................................................266 7.5 Maintenance.................................................................................................267 7.5.1 Maintenance plan M 1..................................................................................267 7.5.2 Maintenance plan M 3..................................................................................267 7.5.3 Description of maintenance work.......................................................................268 8 Heavy load lattice extension 1.8 m (5.9 ft).......................................................................269 8.1 Operations planning.........................................................................................269 8.1.1 Possible operating modes..............................................................................269 8.1.2 Assembly..............................................................................................270 8.1.3 Identification........................................................................................270 8.1.4 Slinging points.......................................................................................271 Heavy load lattice extension............................................................................271 Sheaves package.........................................................................................272 Shackle.................................................................................................272 8.1.5 Transport dimensions and weights......................................................................273 Heavy load lattice extension............................................................................273 Shackle.................................................................................................273 Sheaves package.........................................................................................273 8.1.6 Transport condition...................................................................................274 8.2 Checklists for rigging work.................................................................................277 8.2.1 Overview..............................................................................................277 8.2.2 CHECKLIST: Heavy load lattice extension 1.8 m (5.9 ft) installation into the working position.........278 8.2.3 CHECKLIST: Heavy load lattice extension 1.8 m (5.9 ft) installation into the transport position.......281 8.2.4 CHECKLIST: Heavy load lattice extension 1.8 m (5.9 ft) removal from the working position..............283 8.2.5 CHECKLIST: Heavy load lattice extension 1.8 m (5.9 ft) removal from the transport position............286 8.2.6 CHECKLIST: Heavy load lattice extension 1.8 m (5.9 ft) rigging into the working position..............288 8.2.7 CHECKLIST: Heavy load lattice extension 1.8 m (5.9 ft) rigging into the transport position............291 8.3 Rigging work................................................................................................295 8.3.1 Section 6/main boom – Establish/separate the connection in the working position.......................295 8.3.2 Section 6/main boom– Establish/separate the connection in the transport position......................296 8.3.3 Bringing section 6 from the transport position into the working position..............................298 8.3.4 Bringing section 6 from the working position into the transport position..............................300 8.3.5 Folding the rope attachment point in/out..............................................................303 8.3.6 Section 6 – Setting the angle - with the hoist rope...................................................304 8.3.7 Section 6 – Setting the angle - with a chain hoist....................................................306 8.3.8 Section 6 – Fitting/removing the hoist rope...........................................................308 8.3.9 Possible reeving methods on the heavy load lattice extension..........................................309 8.3.10 Installing/removing the lifting limit switch.........................................................311 Installation............................................................................................311 Removing................................................................................................312 8.3.11 Installing / removing the anemometer and air traffic control light...................................313 8.3.12 Installing/removing the camera.......................................................................314 Installation............................................................................................314 Removing................................................................................................315 8.3.13 Installing/removing the air traffic control light....................................................316 Installing..............................................................................................316 Removing................................................................................................317 8.3.14 Installing/removing the shackle......................................................................318 Installing..............................................................................................318 Removing................................................................................................319 8.3.15 Folding in/folding out the shackle...................................................................320 8.4 Heavy load lattice extension – Operation with hoist rope....................................................321 8.4.1 Setting the RCL.......................................................................................321 Input...................................................................................................321 Shutdown................................................................................................322 8.4.2 Derricking, telescoping the main boom.................................................................323 Slewing range of 360°...................................................................................323 8.4.3 Procedure if permissible wind speeds are exceeded.....................................................324 8.4.4 Instructions for turning loads over...................................................................324 8.5 Heavy load lattice extension – Operation with a shackle.....................................................325 8.5.1 Setting the RCL.......................................................................................325 Input...................................................................................................325 Shutdown................................................................................................326 8.5.2 Derricking the main boom..............................................................................327 Lifting the load........................................................................................327 Derricking..............................................................................................328 8.5.3 Telescoping the main boom.............................................................................329 8.5.4 Procedure if permissible wind speeds are exceeded.....................................................330 8.6 Maintenance.................................................................................................331 8.6.1 Maintenance plan M 1..................................................................................331 8.6.2 Maintenance plan M 3..................................................................................331 8.6.3 Maintenance plan M 12.................................................................................331 8.6.4 Description of maintenance work.......................................................................332 9 Auxiliary single-sheave boom top..................................................................................333 9.1 Operations planning.........................................................................................333 9.1.1 Identification and slinging points....................................................................333 9.1.2 Transport dimensions and weights......................................................................334 9.1.3 Transport condition...................................................................................334 9.2 Description of the rigging work.............................................................................337 9.2.1 Moving the auxiliary single-sheave boom top into operating position...................................337 9.2.2 Moving the auxiliary single-sheave boom top into the transport position...............................339 9.2.3 Installing/removing a folded auxiliary single-sheave boom top.........................................341 9.2.4 Attaching/removing the hoist rope.....................................................................343 9.2.5 Installing/removing the lifting limit switch..........................................................344 Installing..............................................................................................344 Removing................................................................................................345 9.2.6 Installing/removing the anemometer and air traffic control light......................................346 Installing and removing.................................................................................346 9.2.7 Installing/removing the camera........................................................................346 9.3 Operation with the auxiliary single-sheave boom top.........................................................347 9.3.1 Setting the RCL.......................................................................................347 Input...................................................................................................347 Shutdown................................................................................................348 9.3.2 Procedure if permissible wind speeds are exceeded.....................................................349 9.3.3 Instructions for turning loads over...................................................................349 9.4 Maintenance.................................................................................................351 9.4.1 Maintenance plan M 1..................................................................................351 9.4.2 Maintenance plan M 3..................................................................................351 9.4.3 Description of maintenance work.......................................................................352 10 Turning loads over...............................................................................................353 Prerequisites...................................................................................................353 10.1 Setting the RCL............................................................................................354 Entering the reeving........................................................................................354 Switching over to the auxiliary hoist.......................................................................354 10.2 Turning a load over........................................................................................355 11 Driving with a rigged crane......................................................................................357 11.1 Safety instructions........................................................................................357 11.2 Driving path...............................................................................................358 11.3 Permissible rigging modes and axle loads...................................................................359 Notes on the tables.........................................................................................359 11.3.1 Swing-away lattice...................................................................................360 Swing-away lattice 1.2 + 7.5 m (3.9 + 24.6 ft)..........................................................360 Swing-away lattice 1.2 + 13.8 m (3.9 + 45.3 ft).........................................................362 11.3.2 Boom extension.......................................................................................364 Boom extension 7.7 + 13.8 m (23.6 + 45.3 ft)............................................................364 11.3.3 Heavy load lattice extension 2.0 m (6.6 ft)..........................................................366 Heavy load lattice extension 2.0 m (6.6 ft).............................................................366 11.3.4 Heavy load lattice extension 1.8 m (5.9 ft)..........................................................368 Heavy load lattice extension 1.8 m (5.9 ft).............................................................368 11.3.5 Auxiliary single-sheave boom top.....................................................................370 11.4 Before driving.............................................................................................371 11.5 While driving..............................................................................................371 11.6 After driving..............................................................................................371 12 Index............................................................................................................373 A...............................................................................................................375 B...............................................................................................................375 D...............................................................................................................376 H...............................................................................................................376 L...............................................................................................................378 M...............................................................................................................378 O...............................................................................................................378 P...............................................................................................................379 R...............................................................................................................379 S...............................................................................................................379 T...............................................................................................................380
Questions? Email us: [email protected]
PLEASE NOTE:
- This is the SAME MANUAL used by the dealerships to diagnose your vehicle
- No waiting for couriers / posts as this is a PDF manual and you can download it within 2 minutes time once you make the payment.
- Your payment is all safe and the delivery of the manual is INSTANT – You will be taken to the DOWNLOAD PAGE.
- So have no hesitations whatsoever and write to us about any queries you may have : heydownloadss @gmail.com
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Grove GMK4075 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

Grove GMK5100 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

Grove Crane GMK 5100 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD
