Grove Crane GMK 4100L-1 Lattice Extension Operating Manual 3302730 – PDF DOWNLOAD
$28.95
Grove Crane GMK 4100L-1 Lattice Extension Operating Manual 3302730 – PDF DOWNLOAD
Description
Grove Crane GMK 4100L-1 Lattice Extension Operating Manual 3302730 – PDF DOWNLOAD
FILE DETAILS:
Grove Crane GMK 4100L-1 Lattice Extension Operating Manual 3302730 – PDF DOWNLOAD
Language : English
Pages : 280
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:
Grove Crane GMK 4100L-1 Lattice Extension Operating Manual 3302730 – PDF DOWNLOAD
Safety instructions for working with a lattice extension:
This chapter contains additional safety instructions only for safe use of the lattice extensions
described in these operating instructions.
Working at heights:
If there is a risk of falling when doing work on the truck crane, suitable equipment must be used
to prevent falling (e.g. ladder, lifting platform, auxiliary crane).
- The lattice extensions are provided with clamps for positioning a ladder. Place the ladder between
the clamps so it cannot slip off. - If despite using such equipment the risk of falling cannot be minimised you must protect yourself
and any assisting personnel by using fall arrest systems. - The points at which the fall arrest system can be attached to on the truck crane are indicated by
the symbol shown here.
Slinging :
Attach parts only at the designated slinging points. If no attachment points are provided, then note to the centre of gravity specifications. In this way you prevent the attached parts slipping off, falling and causing injury during installation or removal.
Safety retainers :
Always secure the pins at the connection points and also at the holders using the appropriate locks. This prevents unsecured pins coming loose, falling out and causing injuries.
Rigging mode :
- For crane operation with the lattice extension folded away, comply withthe rigging mode. This will prevent damage to the main or lattice extension, and prevent the lattice extension falling during crane operation.
- For on-road driving with the lattice extension, comply with the rigging mode. This prevents the
permissible vehicle width or height being exceeded.
TABLE OF CONTENTS:
Grove Crane GMK 4100L-1 Lattice Extension Operating Manual 3302730 – PDF DOWNLOAD
Lattice extension operating manual.......................................................................... 1 Additional Pages ....................................................................................... 0 Auxiliary single-sheave boom top.................................................................... 3 Swinging from working position to transport position............................................ 4 Swinging from transport position to working position............................................ 6 Note on the removal from the transport position................................................. 8 Table of contents....................................................................................... 11 1 About these operating instructions.................................................................... 31 1.1 Validity........................................................................................ 31 Validity of these operating instructions........................................................ 31 Prerequisites for installation and operation.................................................... 31 References to other operating manuals........................................................... 31 1.2 Terms used...................................................................................... 32 2 Basic safety instructions............................................................................. 35 2.1 Other applicable documents...................................................................... 35 2.2 Safety instructions for working with a lattice extension........................................ 36 Working at heights.............................................................................. 36 Slinging........................................................................................ 36 Safety retainers................................................................................ 36 Rigging mode.................................................................................... 36 Two cranes...................................................................................... 36 3 Operating elements.................................................................................... 37 3.1 On the lattice extension........................................................................ 37 3.1.1 Overview.................................................................................. 37 3.1.2 Rear connection........................................................................... 38 3.1.3 Connection section 1 - section 2.......................................................... 38 3.1.4 Middle 1 connection....................................................................... 39 3.1.5 Middle 2 connection....................................................................... 39 3.1.6 Folded connection......................................................................... 40 3.1.7 Front connection.......................................................................... 40 3.1.8 Angle piece............................................................................... 41 3.2 In the crane cab................................................................................ 43 3.2.1 Overview.................................................................................. 43 3.2.2 On the RCL control unit................................................................... 44 Enter rigging mode/telescope status menu.................................................... 44 3.3 Other operating elements........................................................................ 45 3.3.1 Rigging hook.............................................................................. 45 4 Swing-away lattice.................................................................................... 47 4.1 Operations planning............................................................................. 47 4.1.1 Assembly.................................................................................. 47 4.1.2 Identification............................................................................ 49 4.1.3 Slinging points........................................................................... 50 Section 1................................................................................... 50 Section 2 and section combinations.......................................................... 50 4.1.4 Transport dimensions and weights.......................................................... 52 4.1.5 Transport condition – removed............................................................. 53 Swing-away lattice.......................................................................... 54 On the main boom............................................................................ 56 4.1.6 Transport condition – folded.............................................................. 57 Section 1 only.............................................................................. 57 Section 1 and Section 2..................................................................... 58 4.2 Checklists for rigging work..................................................................... 61 4.2.1 Overview.................................................................................. 61 4.2.2 CHECKLIST: Installing the swing-away lattice – into the working position.................. 63 4.2.3 CHECKLIST: Installing the swing-away lattice – into the transport position................ 67 4.2.4 CHECKLIST: Removing the swing-away lattice – from the working position.................... 70 4.2.5 CHECKLIST: Removing the swing-away lattice – from the transport position.................. 73 4.2.6 CHECKLIST: Rigging the swing-away lattice 1.7 + 14.3 m – in the operating position........ 76 4.2.7 CHECKLIST: Rigging the swing-away lattice 1.7 + 7.7 m – in the operating position......... 81 4.2.8 CHECKLIST: Rigging the swing-away lattice 1.7 + 14.3 m – in the transport position........ 85 4.2.9 CHECKLIST: Rigging the swing-away lattice 1.7 + 7.7 m – in the transport position......... 90 4.2.10 CHECKLIST: Subsequent necessary rigging work............................................. 94 4.2.11 CHECKLIST: Preliminary unrigging work.................................................... 96 4.3 Rigging work.................................................................................... 99 4.3.1 Securing the swing-away lattice with guide ropes.......................................... 99 4.3.2 Notes on the position of the telescoping cylinder.........................................101 4.3.3 Establishing/separating the rear connection...............................................102 Establishing................................................................................102 Disconnecting...............................................................................103 4.3.4 Establishing/separating the centre 2 connection...........................................104 4.3.5 Establishing/releasing the front connection...............................................105 Establishing................................................................................105 Disconnecting...............................................................................105 4.3.6 Folding the fall-back guard out/in........................................................106 4.3.7 Section 1/section 2 – Establishing/separating the right-hand connection...................107 Connecting..................................................................................107 Disconnecting...............................................................................107 4.3.8 Section 1/section 2 – Establishing/separating the left-hand connection....................108 Establishing................................................................................108 Disconnecting...............................................................................109 4.3.9 Section 1/section 2 – establishing/separating the folded connection.......................110 Establishing................................................................................110 Disconnecting...............................................................................110 4.3.10 Establishing/disconnecting the electrical connections between section 1 and section 2....111 Establishing................................................................................111 Disconnecting...............................................................................112 4.3.11 Establishing/separating the slewing connection...........................................113 Establishing................................................................................113 Disconnecting...............................................................................113 4.3.12 Setting the angle - with an auxiliary crane..............................................114 4.3.13 Setting the angle - without an auxiliary crane...........................................115 Entering the RCL code.......................................................................115 Adjusting the angle.........................................................................116 Setting a 0° angle..........................................................................118 Inclining the truck crane...................................................................120 4.3.14 Folding the deflection sheaves out/in....................................................121 Folding out.................................................................................121 Folding in..................................................................................122 4.3.15 Establishing/disconnecting the electrical connections....................................123 Connecting..................................................................................123 Disconnecting...............................................................................124 4.3.16 Relieving the connecting points..........................................................125 Without hydraulic rigging aid...............................................................125 With hydraulic rigging aid..................................................................125 4.3.17 Swinging the swing-away lattice when rigging.............................................127 When rigging into the working position......................................................127 When rigging in the transport position......................................................128 4.3.18 Slewing section 1........................................................................129 4.3.19 Connections on the left/right of the main boom head......................................130 Establishing connections....................................................................130 Separating connections......................................................................131 4.3.20 Attaching/removing the hoist rope........................................................132 Attaching...................................................................................132 Removing....................................................................................133 Possible reeving methods....................................................................134 4.3.21 Installing/removing the lifting limit switch.............................................135 Installation................................................................................135 Removing....................................................................................136 4.3.22 Installing/removing the anemometer and air traffic control light.........................137 Installation................................................................................137 Removing....................................................................................138 4.3.23 Installing/removing the camera...........................................................139 Installation................................................................................139 Removing....................................................................................140 4.3.24 Main boom operation with a folded swing-away lattice – rigging mode......................141 4.4 Operation with a swing-away lattice.............................................................143 4.4.1 Setting the RCL...........................................................................143 Input.......................................................................................143 Shutdown....................................................................................144 4.4.2 Derricking the main boom..................................................................144 Slewing range of 360°.......................................................................144 4.4.3 Telescoping with a rigged swing-away lattice..............................................145 Slewing range of 360°.......................................................................145 Telescoping with a folded swing- away lattice...............................................145 4.4.4 Procedure if the permissible wind speed is exceeded.......................................146 4.4.5 Information on the main boom operation when the swing-away lattice is folded/rigged.......147 Folded......................................................................................147 In working position.........................................................................147 4.4.6 Instructions for turning loads over.......................................................148 4.5 Maintenance.....................................................................................149 4.5.4 Description of maintenance work...........................................................151 Pins........................................................................................151 Connections.................................................................................152 Fall-back guard.............................................................................153 Rollers.....................................................................................156 Joints......................................................................................157 4.6 Finding and eliminating malfunctions............................................................159 4.6.1 Troubleshooting table.....................................................................159 5 Boom extension........................................................................................161 5.1 Operations planning.............................................................................161 5.1.1 Assembly..................................................................................161 5.1.2 Identification............................................................................162 Section 3...................................................................................162 5.1.3 Slinging points...........................................................................163 Section 3...................................................................................163 5.1.4 Transport dimensions and weights..........................................................164 5.1.5 Transport condition.......................................................................164 Section 3...................................................................................164 5.2 Checklists for rigging work.....................................................................165 5.2.1 Overview..................................................................................165 5.2.2 CHECKLIST: installing the boom extension..................................................166 5.2.3 CHECKLIST: removing the boom extension....................................................169 5.3 Description of the rigging work.................................................................173 5.3.1 Folding the deflection sheave out/in – section 3..........................................173 5.3.2 Installing/removing section 3 on/from the main boom.......................................174 5.3.3 Connecting/disconnecting the electrical connections – section 3/main boom.................175 5.3.4 Connecting/disconnecting the electrical connections – section 3/swing-away lattice........177 5.3.5 Installing/removing the swing-away lattice on/from section 3..............................179 5.3.6 Attaching/removing the hoist rope.........................................................180 Attaching...................................................................................180 Removing....................................................................................181 Possible reeving methods....................................................................181 5.4 Operation with boom extension...................................................................183 5.4.1 Setting the RCL...........................................................................183 Input.......................................................................................183 Shutdown....................................................................................184 5.4.2 Derricking, telescoping the main boom.....................................................185 Slewing range of 360°.......................................................................185 5.4.3 Procedure if the permissible wind speed is exceeded.......................................186 5.4.4 Instructions for turning loads over.......................................................186 5.5 Maintenance.....................................................................................187 5.5.1 Maintenance plan M 1......................................................................187 5.5.2 Maintenance plan M 3......................................................................187 5.5.3 Description of maintenance work...........................................................188 6 Heavy load lattice extension (SLS) 2.0 m..............................................................189 6.1 Operations planning.............................................................................189 6.1.1 Assembly..................................................................................189 6.1.2 Identification............................................................................190 Section 6...................................................................................190 6.1.3 Slinging points...........................................................................191 Section 6...................................................................................191 6.1.4 Transport dimensions and weights..........................................................192 6.1.5 Transport condition.......................................................................192 Section 6...................................................................................192 6.2 Checklists for rigging work.....................................................................195 6.2.1 Overview..................................................................................195 6.2.2 CHECKLIST: SLS 2.0 m installation into the working position...............................196 6.2.3 CHECKLIST: SLS 2.0 m installation into the transport position.............................199 6.2.4 CHECKLIST: SLS 2.0 m removal from the working position....................................200 6.2.5 CHECKLIST: Removing the SLS 2.0 m – from the transport position...........................203 6.2.6 CHECKLIST: SLS 2.0 m rigging into the working position....................................205 6.2.7 CHECKLIST: SLS 2.0 m rigging into the transport position..................................209 6.3 Rigging work....................................................................................211 6.3.1 Installing/removing section 6 on/from the main boom.......................................211 Installing..................................................................................211 Removing....................................................................................212 6.3.2 Moving section 6 into the working position/transport position.............................214 In working position.........................................................................214 In transport position.......................................................................216 6.3.3 Connecting/disconnecting the electrical connections – section 6/main boom.................218 Establishing................................................................................218 Disconnecting...............................................................................218 6.3.4 Positioning/removing the hoist rope – section 6...........................................219 6.3.5 Possible reeving methods on the heavy load lattice extension..............................220 6.3.6 Installing/removing the lifting limit switch and anemometer...............................222 Lifting limit switch........................................................................222 Anemometer..................................................................................223 6.3.7 Installing/removing the camera............................................................223 6.3.8 Setting the angle.........................................................................224 6.4 Operating the heavy load lattice extension......................................................225 6.4.1 Setting the RCL...........................................................................225 Input.......................................................................................225 Shutdown....................................................................................226 6.4.2 Derricking, telescoping the main boom.....................................................227 Slewing range of 360°.......................................................................227 6.4.3 Procedure if permissible wind speeds are exceeded.........................................227 6.4.4 Instructions for turning loads over.......................................................228 6.5 Maintenance.....................................................................................229 6.5.3 Description of maintenance work...........................................................230 7 Auxiliary single-sheave boom top......................................................................231 7.1 Operations planning.............................................................................231 7.1.1 Identification and slinging points........................................................231 7.1.2 Transport dimensions and weights..........................................................232 7.1.3 Transport condition.......................................................................232 7.2 Rigging work....................................................................................233 7.2.1 Moving the auxiliary single-sheave boom top into the working position.....................233 7.2.2 Moving the auxiliary single-sheave boom top into the transport position...................236 7.2.3 Installing/removing a folded up auxiliary single-sheave boom top..........................239 7.2.4 Attaching and removing the hoist rope.....................................................241 Possible reeving methods....................................................................242 7.2.5 Installing/removing the lifting limit switch and anemometer...............................243 Lifting limit switch........................................................................243 Anemometer..................................................................................245 7.2.6 Installing/removing the camera............................................................246 7.3 Operation with the auxiliary single-sheave boom top.............................................247 7.3.1 Setting the RCL...........................................................................247 Input.......................................................................................247 Shutdown....................................................................................248 7.3.2 Procedure if permissible wind speeds are exceeded.........................................249 7.3.3 Instructions for turning loads over.......................................................249 7.4 Maintenance.....................................................................................251 7.4.3 Description of maintenance work...........................................................252 8 Turning loads over....................................................................................253 Prerequisites.......................................................................................253 8.1 Setting the RCL.................................................................................254 Entering the reeving............................................................................254 Switching over to the auxiliary hoist...........................................................254 8.2 Turning a load over.............................................................................255 9 Driving with a rigged crane...........................................................................257 9.1 Safety instructions.............................................................................257 9.2 Driving distance................................................................................258 9.3 Permissible rigging modes and axle loads........................................................259 Notes on the tables.............................................................................259 9.3.1 Swing-away lattice........................................................................260 Swing-away lattice 1.7 + 7.7 m..............................................................260 Swing-away lattice 1.7 + 14.3 m.............................................................262 9.3.2 Boom extension............................................................................264 Boom extension 9.7 + 7.7 m..................................................................264 Boom extension 9.7 + 14.3 m.................................................................266 9.3.3 Heavy load lattice extension (SLS)........................................................268 Heavy load lattice extension 2.0 m..........................................................268 9.3.4 Auxiliary single-sheave boom top..........................................................270 9.4 Before driving..................................................................................271 9.5 While driving...................................................................................271 9.6 After driving...................................................................................271 10 Index................................................................................................273 A...................................................................................................275 B...................................................................................................275 D...................................................................................................275 H...................................................................................................276 L...................................................................................................276 O...................................................................................................277 P...................................................................................................277 R...................................................................................................277 S...................................................................................................277 T...................................................................................................278
Customer Support: [email protected]
PLEASE NOTE:
- This is the SAME MANUAL used by the dealerships to diagnose your vehicle
- No waiting for couriers / posts as this is a PDF manual and you can download it within 2 minutes time once you make the payment.
- Your payment is all safe and the delivery of the manual is INSTANT – You will be taken to the DOWNLOAD PAGE.
- So have no hesitations whatsoever and write to us about any queries you may have : heydownloadss @gmail.com
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Grove GMK 3055 Operating Instruction Manual Part 1 (Driving) - PDF DOWNLOAD

Grove GMK 5220 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

Grove GMK4075 Operating Instructions Manual Part 1 (Carrier) - PDF DOWNLOAD
