★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Grove Crane GMK 5100 Lattice Extension Operating Instruction Manual 2084545 – PDF DOWNLOAD

$27.95

Grove Crane GMK 5100 Lattice Extension Operating Instruction Manual 2084545 – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Grove Crane GMK 5100 Lattice Extension Operating Instruction Manual 2084545 – PDF DOWNLOAD

FILE DETAILS:

Grove Crane GMK 5100 Lattice Extension Operating Instruction Manual 2084545 – PDF DOWNLOAD

Language : English
Pages : 144
Downloadable : Yes
File Type : PDF

IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:

Grove Crane GMK 5100 Lattice Extension Operating Instruction Manual 2084545 – PDF DOWNLOAD

Important information:
1.1 About these operating instructions:

All the lattice extensions described in these operating instructions can be obtained as additional
equipment.

Validity of this operating manual:

  • This operating manual only applies to lattice extensions which were deli- vered by Deutsche GROVE
    GmbH.
  • In addition, for the operation of the truck crane with a lattice extension described in these
    operating instructions, all details in the included Opera- ting Instructions for the GMK 5100
    (for which the lattice extension was deli- vered from the factory) are applicable.

Prerequisites for assembly and operation:

The lattice extensions described in these operating instructions may only be operated together with
a GROVE GMK 5100 truck crane whose serial number is identical with the serial number that is marked on the lattice ex- tensions.
Safety instructions:
The operation of the GMK 5100 with one of the lattice extensions descri- bed in these operating
instructions is subject to
– all the basic safety instructions to be found in the subsequent section
Basic safety instructions and
– all the safety instructions contained in the supplied operating instructi-
ons for the GMK 5100.

TABLE OF CONTENTS:

Grove Crane GMK 5100 Lattice Extension Operating Instruction Manual 2084545 – PDF DOWNLOAD

1 Important information
2 Transport dimensions and weights
3 Two-stage swing-away lattice extension
4 Boom extension
5 Auxiliary single-sheave boom top
Alphabetical index

1 Important information 1 – 1
1 1 About these operating instructions 1 – 1
1 2 Basic safety instructions 1 – 2
1 2 1 Warnings and symbols 1 – 2
1 3 Proper use 1 – 3
1 4 Organizational measures 1 – 5
1 5 Personnel qualifications 1 – 7
1 6 Safety instructions for truck crane work 1 – 8
1 7 The units of measurement in US units 1 – 10
2 Transport dimensions and weights 2 – 1
2 1 In metric units 2 – 1
2 1 1 Two-stage swing-away lattice extension and boom extension 2 – 1
2 1 2 Auxiliary single-sheave boom top 2 – 1
2 2 In US units 2 – 2
2 2 1 Two-stage swing-away lattice extension and boom extension 2 – 2
2 2 2 Auxiliary single-sheave boom top 2 – 2
3 Two-stage swing-away lattice extension
(additional equipment) 3 – 1
3 1 Identification of the two-stage swing-away lattice extension 3 – 1
3 2 Assembly of lattice extensions 3 – 3
3 3 Centre of gravity positions for slinging 3 – 4
16 02 2000
Operating instructions for lattice extension 2 084 545 en i – 2
GMK 5100
3 4 Check lists for rigging work 3 – 5
3 4 1 Overview of the required rigging work 3 – 5
3 4 2 CHECKLIST: Installing two-stage swing-away lattice extension 3 – 6
3 4 3 CHECKLIST: Removing (two-stage) swing-away lattice extension 3 – 7
3 4 4 CHECKLIST: Rigging the 11 m swing-away lattice extension 3 – 9
3 4 5 CHECKLIST: Unrigging the 11 m swing-away lattice extension 3 – 13
3 4 6 CHECKLIST: Rigging the 18 m two-stage swing-away lattice extension 3 – 17
3 4 7 CHECKLIST: Unrigging the 18 m two-stage swing-away lattice extension 3 – 21
3 5 Description of rigging work 3 – 27
3 5 1 Preparing the truck crane for rigging 3 – 27
3 5 2 Checking the transport condition 3 – 29
3 5 3 Folding the run-up rail out/in 3 – 32
3 5 4 Connections with folded lattice extension 3 – 33
3 5 5 Pin connections on the main boom head 3 – 39
3 5 6 Pin connections on the lattice extension 3 – 42
3 5 7 Swivelling lattice extension onto the main boom head 3 – 45
3 5 8 Swivelling the lattice extension when rigging 3 – 46
3 5 9 Adjusting angle on the lattice extension 3 – 48
3 5 10 Folding deflection sheave on 11 m section out/in 3 – 51
3 5 11 Positioning/removing the hoist cable 3 – 52
3 5 12 Electrical connection on the lattice extension 3 – 55
3 5 13 Lifting limit switch on the lattice extension 3 – 58
3 5 14 Anemometer on the lattice extension 3 – 60
3 5 15 Transportation on a separate vehicle 3 – 61
3 6 Raising and setting down the main boom with rigged lattice extension 3 – 63
3 7 Telescoping with rigged lattice extension 3 – 65
3 8 Operation with the lattice extension 3 – 67
3 8 1 SLI shutdown 3 – 67
3 8 2 Procedure if the permissible wind speed is exceeded 3 – 68
3 9 Turning loads with the lattice extension 3 – 69
3 9 1 Requirements 3 – 69
3 9 2 Setting SLI 3 – 70
3 10 Driving with rigged crane and lattice extension installed 3 – 73
3 10 1 Driving route 3 – 73
3 10 2 Position of the boom 3 – 74
3 10 3 Driving the rigged crane 3 – 77
16 02 2000
i – 3 2 084 545 en Operating instructions for lattice extension
GMK 5100
3 11 Malfunction when working with lattice extension! 3 – 80
3 12 Maintenance work 3 – 81
3 12 1 Modules requiring protection during cleaning work 3 – 81
3 12 2 Maintenance work M1, monthly 3 – 82
4 Boom extension (additional equipment) 4 – 1
4 1 Identification and slinging points 4 – 1
4 1 1 Identification 4 – 1
4 1 2 Slinging points 4 – 2
4 2 Assembly of boom extensions 4 – 3
4 3 Check lists for rigging work 4 – 5
4 3 1 CHECKLIST: Installing the 26 m / 34 m boom extension 4 – 5
4 3 2 CHECKLIST: Removing the 26 m / 34 m boom extension 4 – 8
4 4 Description of rigging work 4 – 11
4 4 1 Installing/disassembling 8 m sections 4 – 11
4 4 2 Installing/removing two-stage swing-away lattice extension for
boom extension 4 – 12
4 4 3 Electrical connection on the boom extension 4 – 13
4 4 4 Folding out/in the deflection sheaves on the 8 m sections 4 – 15
4 4 5 Positioning/removing the hoist cable 4 – 16
4 5 Driving with rigged crane and lattice extension or boom extension installed 4 – 19
4 5 1 Driving route 4 – 19
4 5 2 Position of the boom 4 – 20
4 5 3 Driving the rigged crane 4 – 22
4 6 Maintenance work 4 – 25
4 6 1 Maintenance work M1, monthly 4 – 25
5 Auxiliary single-sheave boom top
(additional equipment) 5 – 1
5 1 Identification 5 – 1
5 2 Installing/removing auxiliary single-sheave boom top 5 – 3
5 2 1 Installing boom top 5 – 3
5 2 2 Removing the auxiliary single-sheave boom top 5 – 4
16 02 2000
Operating instructions for lattice extension 2 084 545 en i – 4
GMK 5100
5 3 Rigging the auxiliary single-sheave boom top 5 – 5
5 3 1 Rigging in transport position 5 – 5
5 3 2 Rigging in working position 5 – 6
5 3 3 Attaching and removing hoist cable 5 – 7
5 3 4 Possible reeving methods on the auxiliary single-sheave boom top 5 – 7
5 3 5 Lifting limit switch and anemometer 5 – 8
5 4 Turning loads with the auxiliary single-sheave boom top 5 –

Need help? Contact: [email protected]

PLEASE NOTE:

  • This is the same manual used by the dealers to diagnose and troubleshoot your vehicle
  • You will be directed to the download page as soon as the purchase is completed. The whole payment and downloading process will take anywhere between 2-5 minutes
  • Need any other service / repair / parts manual, please feel free to contact [email protected] . We still have 50,000 manuals unlisted

S.V

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order