Grove Crane GMK 5220 Lattice Extension Operating Instructions Manual 3112319 – PDF DOWNLOAD
$28.95
Grove Crane GMK 5220 Lattice Extension Operating Instructions Manual 3112319 – PDF DOWNLOAD
Description
Grove Crane GMK 5220 Lattice Extension Operating Instructions Manual 3112319 – PDF DOWNLOAD
FILE DETAILS:
Grove Crane GMK 5220 Lattice Extension Operating Instructions Manual 3112319 – PDF DOWNLOAD
Language : English
Pages : 256
Downloadable : Yes
File Type : PDF
DESCRIPTION:
Grove Crane GMK 5220 Lattice Extension Operating Instructions Manual 3112319 – PDF DOWNLOAD
About these operating instructions:
All the lattice extensions described in these operating instructions can be obtained as additional
equipment.
Validity of these operating instructions:
- These operating instructions only apply to lattice extensions which were delivered by Deutsche
GROVE GmbH. - When operating the truck crane with one of the lattice extensions described in these operating
instructions, you must also follow all the information in the Operating instructions supplied with
the GMK 5220 which was equipped at the factory with the lattice extension.
Prerequisites for assembly and operation:
The lattice extensions described in these operating instructions may only be operated together with
the GROVE GMK 5220 truck crane whose serial number is identical with the serial number marked on
the lattice extensions.
Safetyinstructions:
The operation of GMK 5220 with one of the lattice extensions described in
these operating instructions is subject to:
– all the basic safety instructions to be found in the subsequent section Basic safety
instructions and
– all the safety instructions contained in the operating instructions supplied with the GMK 5220.
References to other operating instructions
Cross references to other operating or maintenance instructions are shown in the following forms:
à GMK 5220 operating instructions, Part 2 Crane operation – Rigging work
The number for the chapter on Rigging work is found at the front, on the second page of the
operating instructions specified.
or
à GMK 5220 operating instructions – Safe load indicator
The corresponding page number can be found in the index, under the entry
Safe load indicator.
TABLE OF CONTENTS:
Grove Crane GMK 5220 Lattice Extension Operating Instructions Manual 3112319 – PDF DOWNLOAD
Correction sheet: Setting the angle position of the heavy load lattice extension................................ 3 1 Important information......................................................................................... 9 1.1 About these operating instructions...................................................................... 9 Validity of these operating instructions................................................................ 9 Prerequisites for assembly and operation................................................................ 9 Safetyinstructions..................................................................................... 9 References to other operating instructions.............................................................. 9 1.2 Basic safety instructions............................................................................... 10 1.2.1 Warnings and symbols.............................................................................. 10 1.3 Intended use............................................................................................ 11 1.4 Organizational measures................................................................................. 13 1.5 Personnel qualifications................................................................................ 15 1.6 Safety instructions for truck crane work................................................................ 16 1.7 Specifications in US standard units of measurement...................................................... 18 2 Transport dimensions and weights.............................................................................. 21 2.1 Swing-away lattice extension............................................................................ 21 2.2 Auxiliary single-sheave boom top........................................................................ 22 2.3 Heavy load lattice extension............................................................................ 22 3 12/21 m (39/69 ft) swing-away lattice extension............................................................... 25 3.1 Additional operating and display elements............................................................... 25 3.1.1 In the crane cab.................................................................................. 25 At the control console, right...................................................................... 25 On the crane control display....................................................................... 27 On the safe load indicator.......................................................................... 27 3.1.2 Operating and display elements on the hand-held control........................................... 29 3.1.3 Operating and display instruments on the swing-away lattice extension............................. 30 3.2 Identification of the swing-away lattice extension...................................................... 31 Serial number onsection1.............................................................................. 32 Serial number onsection2.............................................................................. 32 3.3 Composition of the swing-away lattice extension......................................................... 33 3.4 Centres of gravity for slinging......................................................................... 34 3.5 Checklists for rigging work............................................................................. 35 3.5.1 Overview of the required rigging work............................................................. 35 3.5.2 CHECKLIST: Installing the 12/21 m (39/69 ft) swing-away latticeextension......................... 36 3.5.3 CHECKLIST: Removing the 12/21 m (39/69 ft) swing-away lattice extension.......................... 38 For a rigged lattice extension...................................................................... 38 For a folded lattice extension...................................................................... 40 3.5.4 CHECKLIST: Rigging the 12/21 m (39/69 ft) swing-away lattice extension............................ 43 3.5.5 CHECKLIST: Unrigging the 12/21 m(39/69 ft) swing-away lattice extension......................... 49 3.6 Description of rigging work............................................................................. 55 3.6.1 Preparing the truck crane for rigging............................................................. 55 Prerequisites forrigging........................................................................... 55 Prerequisites forunrigging......................................................................... 55 Securing the lattice extension with rope............................................................ 56 3.6.2 Checking the transport condition.................................................................. 57 Transport condition with lattice extension folded at the side....................................... 58 Transport condition with removed lattice extension.................................................. 61 3.6.3 Checking the locking device on the hose drum...................................................... 62 Undoing the locking device......................................................................... 62 Inserting the locking device....................................................................... 63 Position of the hydraulic connections............................................................... 63 3.6.4 Installing/removing the hose drum................................................................. 65 Installing the hose drum............................................................................ 65 Removing the hose drum.............................................................................. 66 3.6.5 Establishing/disconnecting the hydraulic connection............................................... 67 3.6.6 Folding the run-up rail out/in.................................................................... 69 3.6.7 Connections with folded lattice extension......................................................... 70 Connections in thefront area....................................................................... 70 Connections in the middle area...................................................................... 75 Connections in therear area........................................................................ 77 3.6.8 Connecting/disconnecting the slewing connection................................................... 82 Creating a slewing connection....................................................................... 82 Releasing a slewing connection...................................................................... 83 3.6.9 Connections on the left and right of the main boom head........................................... 84 Establishing connections........................................................................... 84 Releasing connections.............................................................................. 85 Relieving the connecting points.................................................................... 87 3.6.10 Swinging the lattice extension onto the main boom head........................................... 88 Prerequisites....................................................................................... 88 Swinging the lattice extension...................................................................... 88 3.6.11 Swinging the lattice extension when rigging...................................................... 89 When rigging – section1............................................................................ 89 When unrigging – section1.......................................................................... 90 When rigging – section2............................................................................ 91 When unrigging – section2.......................................................................... 92 3.6.12 Establishing/releasing connections on the lattice extension..................................... 93 Section1 and section2 installed................................................................... 94 Only section1 installed........................................................................... 96 3.6.13 Electrical connections on the lattice extension.................................................. 98 On 12 m (39 ft) swing-away lattice extension........................................................ 98 On 21 m (69 ft)- swing-away lattice extension.......................................................100 3.6.14 Folding deflection sheave out/in.................................................................101 Folding out the deflection sheaves.................................................................101 Folding in the deflection sheaves..................................................................103 3.6.15 Positioning/removing the hoist rope..............................................................104 Positioning the hoist rope.........................................................................104 Removing the hoist rope............................................................................104 Possible reeving methods on the lattice extension..................................................105 3.6.16 Installing/removing the lifting limit switch.....................................................106 Overriding connection on main boom.................................................................106 On 12 m (39 ft) swing-away lattice extension........................................................107 On 21 m (69 ft) swing-away lattice extension........................................................108 3.6.17 Installing/removing the anemometer...............................................................109 On 12 m (39 ft) swing-away lattice extension........................................................109 On 21 m (69 ft) swing-away lattice extension.......................................................111 3.6.18 Air traffic control light – electrical connection................................................113 Establishing theelectrical connection.............................................................113 Switching on/off....................................................................................113 Disconnecting the electrical connection.............................................................114 3.6.19 Derricking the lattice extension.................................................................115 When rigging........................................................................................115 During operation....................................................................................117 3.6.20 Transportation on a separate vehicle.............................................................118 3.7 Operation with the lattice extension....................................................................119 3.7.1 Setting...........................................................................................120 3.7.2 Raising and setting down the main boom............................................................122 Raising.............................................................................................122 Setting down........................................................................................122 3.7.3 Telescoping with rigged lattice extension.........................................................123 3.7.4 Information about the SLI shutdown................................................................124 3.7.5 Procedure if the permissible wind speed is exceeded...............................................125 3.7.6 Information about the main boom operation when the lattice extension is folded/rigged.............126 Folded..............................................................................................126 Rigged..............................................................................................126 3.8 Turning loads with the lattice extension................................................................129 3.8.1 Prerequisites.....................................................................................129 3.8.2 Setting the SLI...................................................................................130 Entering a reeving..................................................................................130 Setting the SLI to the auxiliary hoist..............................................................131 3.8.3 Turning a load....................................................................................132 3.9 Driving with rigged truck crane and rigged lattice extension............................................135 3.9.1 Driving route.....................................................................................136 3.9.2 Boom positions and axle loads.....................................................................137 Notes on the tables.................................................................................137 12 m (39 ft) swing- awaylattice extension..........................................................138 21 m (69 ft) swing- awaylattice extension.........................................................139 3.9.3 Driving the rigged crane..........................................................................140 Closing the slewing gear brake......................................................................140 Retracting the outriggers..........................................................................140 Switching over suspension...........................................................................141 Switching on separate steering......................................................................142 Driving.............................................................................................142 Levelling the free- standing truck crane............................................................143 Supporting the truck crane.........................................................................144 3.10 Finding and eliminating malfunctions...................................................................145 3.11 Maintenance work.......................................................................................147 3.11.1 Modules in need of protection during cleaning work...............................................147 3.11.2 Maintenance work M1, monthly.....................................................................148 Pins................................................................................................148 3.11.3 Maintenance work M12, every twelve months........................................................149 Lubricate joints on section1.......................................................................149 4 Boom extension................................................................................................153 4.1 Identification and slinging points......................................................................153 4.1.1 Identification....................................................................................153 4.1.2 Slinging points...................................................................................154 4.2 Assembly of boom extensions.............................................................................155 4.3 Checklists for rigging work.............................................................................157 4.3.1 CHECKLIST: Rigging the 29/37 m (95/121 ft) boom extension.........................................157 4.3.2 CHECKLIST: Unrigging the 26/32 m (85/121 ft) boom extension.......................................161 4.4 Description of rigging work.............................................................................165 4.4.1 Installing/dismantling section3 and section4....................................................165 Installing..........................................................................................165 Dismantling.........................................................................................166 4.4.2 Installing/dismantling the lattice extension for the boom extension...............................167 Installing..........................................................................................167 Dismantling.........................................................................................168 4.4.3 Hydraulic connection at the boom extension........................................................169 On the 29 m (95 ft) boom extension..................................................................169 On the 37 m (121ft) boom extension.................................................................171 4.4.4 Electrical connection at the boom extension.......................................................173 On the 29 m (95 ft) boom extension..................................................................173 On the 37 m (121ft) boom extension.................................................................175 4.4.5 Fold in/fold out the deflection sheave on section3...............................................177 Folding out deflection sheave.......................................................................177 Folding in deflection sheave........................................................................177 4.4.6 Positioning/removing the hoist rope...............................................................178 Positioning the hoist rope.........................................................................178 Removing the hoist rope............................................................................178 Possible reeving methods...........................................................................179 4.5 Working with the boom extension.........................................................................181 4.6 Driving with rigged truck crane and rigged boom extension..............................................183 4.6.1 Driving route.....................................................................................184 4.6.2 Boom positions and axle loads.....................................................................185 Notes on the tables.................................................................................185 29 m (95 ft) boom extension........................................................................186 37 m (121 ft) boom extension.......................................................................187 4.6.3 Driving the rigged crane..........................................................................188 4.7 Maintenance work........................................................................................188 4.7.1 Maintenance work M1, monthly......................................................................188 5 Auxiliary single-sheave boom top..............................................................................191 5.1 Identification..........................................................................................191 5.2 Installing/removing auxiliary single-sheave boom top....................................................193 5.2.1 Installing the auxiliary single-sheave boom top...................................................193 5.2.2 Dismantling the auxiliary single-sheave boom top..................................................194 5.3 Rigging the auxiliary single-sheave boom top............................................................195 5.3.1 Rigging in transport position.....................................................................195 5.3.2 Rigging in working position.......................................................................196 5.3.3 Attaching and removing the hoist rope.............................................................197 Possible reeving methods............................................................................197 5.3.4 Setting the SLI...................................................................................198 5.3.5 Lifting limit switch and anemometer...............................................................199 Lifting limit switch................................................................................199 Anemometer..........................................................................................200 5.4 Operation with the auxiliary single-sheave boom top.....................................................201 5.5 Turning loads with the auxiliary single-sheave boom top.................................................203 5.5.1 Prerequisites.....................................................................................203 5.5.2 Setting the SLI...................................................................................204 Entering a reeving..................................................................................204 Setting the SLI to the auxiliary hoist..............................................................205 5.5.3 Turning a load....................................................................................206 5.6 Driving with rigged truck crane and rigged auxiliary single-sheave boom top.............................208 6 Heavy load lattice extension..................................................................................211 6.1 Identification..........................................................................................211 6.2 Attaching and securing the heavy load lattice extension.................................................213 6.2.1 Slinging point....................................................................................213 6.2.2 Securing the heavy load lattice extension with guide rope.........................................214 6.3 Installing/removing the heavy load lattice extension....................................................215 6.3.1 Installing the heavy load lattice extension.......................................................215 6.3.2 Removing the heavy load lattice extension.........................................................217 6.4 Rigging the heavy load lattice extension................................................................219 6.4.1 Rigging in transport position.....................................................................219 6.4.2 Rigging in working position.......................................................................221 6.4.3 Setting the angle position of the heavy load lattice extension....................................223 Installing/ removing the chain hoist................................................................223 Setting the angle position..........................................................................224 6.4.4 Attaching and removing the hoist rope.............................................................225 Possible reeving methods on the heavy load lattice extension........................................226 6.4.5 Lifting limit switch and anemometer...............................................................227 Lifting limit switch................................................................................227 Anemometer..........................................................................................228 6.4.6 Transportation on a separate vehicle..............................................................229 6.5 Operation with the heavy load lattice extension.........................................................231 6.5.1 Setting the SLI...................................................................................232 6.5.2 Raising and setting down the main boom............................................................234 Raising.............................................................................................234 Setting down........................................................................................234 6.5.3 Telescoping with rigged heavy load lattice extension..............................................235 6.5.4 Information about the SLI shutdown................................................................236 6.5.5 Procedure if the permissible wind speed is exceeded...............................................236 6.5.6 Information about the main boom operation when the heavy load lattice extension is folded/r.......237 6.6 Turning loads with the heavy load lattice extension.....................................................239 6.6.1 Prerequisites.....................................................................................239 6.6.2 Setting the SLI...................................................................................240 Entering a reeving..................................................................................240 Setting the SLI to the auxiliary hoist..............................................................241 6.6.3 Turning a load....................................................................................242 6.7 Driving with rigged truck crane and rigged heavy load lattice extension.................................245 7 Index.........................................................................................................249 A...........................................................................................................251 B...........................................................................................................251 E...........................................................................................................251 H...........................................................................................................251 I...........................................................................................................252 L...........................................................................................................252 M...........................................................................................................254 P...........................................................................................................254 S...........................................................................................................254 T...........................................................................................................254
IMAGES PREVIEW OF THE MANUAL:

Customer Support: [email protected]
PLEASE NOTE:
- This is not a physical manual but a digital manual – meaning no physical copy will be couriered to you. The manual can be yours in the next 2 mins as once you make the payment, you will be directed to the download page IMMEDIATELY.
- This is the same manual used by the dealers inorder to diagnose your vehicle of its faults.
- Require some other service manual or have any queries: please WRITE to us at [email protected]
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Grove GMK4100 4100-L 5095 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

Grove GMK4075 Operating Instructions Working Range Limiter Manual - PDF DOWNLOAD

Grove GMK 6200-1 Operating Instructions Manual Part 1 (Carrier) - PDF DOWNLOAD
