★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Grove GMK 5250L Lattice Extension Operation Manual 3302450 PDF

$29.95

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302450 – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302450 – PDF DOWNLOAD

FILE DETAILS:

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302450 – PDF DOWNLOAD

Language : English
Pages : 390
Downloadable : Yes
File Type : PDF

DESCRIPTION:

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302450 – PDF DOWNLOAD

About these operating instructions:
1.1 Validity:

Validity of these operating instructions:

  • These operating instructions apply only to lattice extensions supplied by
    Manitowoc Crane Group Germany GmbH.
  • In addition, for the operation of the truck crane with a lattice extension described in these
    operating instructions, all details in the Operating manual GMK 5250L, supplied by the factory for
    the lattice extensions are applicable.

Prerequisites for assembly and operation:

The lattice extensions described in this operating manual may only be operated together with a
GROVE truck crane GMK 5250L whose serial number is identical with the serial number marked on the
lattice extensions.

References to other operating manuals:

  • Cross references to other operating or maintenance manuals are shown for instance in the following
    form: à Operating manual GMK5250L.
  • The subject that is referenced can be found in the index or table of contents
    of the document to which reference is made.

IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302450 – PDF DOWNLOAD

Lattice extension operating manual..............................................................................  1
Fitting the hoist rope on auxiliary single-sheave boom top 1....................................................  3
	Validity....................................................................................................  3
	Versions....................................................................................................  3
	Moving the rod..............................................................................................  4
Additional page GMK5250L – Unrigging the swing-away lattice.....................................................  5
1 About these operating instructions............................................................................ 11
	1.1 Validity................................................................................................ 11
	1.2 Terms used.............................................................................................. 13
2 Basic safety instructions..................................................................................... 17
	2.1 Other applicable documents.............................................................................. 17
	2.2 Safety instructions for working with a lattice extension................................................ 18
3 Operating elements............................................................................................ 21
	3.1 On the lattice extension................................................................................ 21
		3.1.1 Overview.......................................................................................... 21
		3.1.2 Hand-held control of the lattice extension........................................................ 22
		3.1.3 Connecting the lattice extension hand-held control................................................ 24
		3.1.4 Section2 control unit............................................................................ 25
	3.2 In the crane cab........................................................................................ 27
		3.2.1 Overview.......................................................................................... 27
		3.2.2 On the CCS control unit........................................................................... 28
		3.2.3 On the RCL control unit........................................................................... 31
		3.2.4 At the right of the control console............................................................... 32
	3.3 On the hand-held control................................................................................ 33
		3.3.1 Connecting hand-held control...................................................................... 35
4 Rigging work on the main boom................................................................................. 39
	4.1 Hose reel............................................................................................... 39
		4.1.1 Slinging points................................................................................... 39
		4.1.2 Transport dimensions and weights.................................................................. 40
	4.2 Rigging work on the hose reel........................................................................... 41
		4.2.1 Fitting / removing the hose reel.................................................................. 41
		4.2.2 Checking the rotation lock on the hose reel....................................................... 43
		4.2.3 Positions of the hydraulic connections.......................................................... 44
5 Swing-away lattice............................................................................................ 51
	5.1 Notes on this chapter................................................................................... 51
	5.2 Operations planning..................................................................................... 51
		5.2.1 Assembly.......................................................................................... 51
		5.2.2 Identification.................................................................................... 53
		5.2.3 Slinging points................................................................................... 54
		5.2.4 Transport dimensions and weights.................................................................. 56
		5.2.5 Transport condition – removed..................................................................... 58
		5.2.6 Transport condition – folded...................................................................... 61
	5.3 Checklists for rigging work............................................................................. 63
		5.3.1 Overview.......................................................................................... 63
		5.3.2 CHECKLIST: Installing the swing-away lattice – into the working position.......................... 65
		5.3.3 CHECKLIST: Installing the swing-away lattice – into the transport position........................ 73
		5.3.4 CHECKLIST: Removing the swing-away lattice – from the working position............................ 81
		5.3.5 CHECKLIST: Removing the swing-away lattice – from thetransport position.......................... 87
		5.3.6 CHECKLIST: Rigging the swing-away lattice 2 + 10.5 m – in the working position.................... 91
		5.3.7 CHECKLIST: Rigging the swing-away lattice 2 + 19.3 m – in the working position.................... 97
		5.3.8 CHECKLIST: Rigging the swing-away lattice 2 + 10.5 m – in the transport position..................103
		5.3.9 CHECKLIST: Rigging the swing-away lattice 2 + 19.3 m – in the transport position..................111
		5.3.10 CHECKLIST: Further rigging work..................................................................119
	5.4 Rigging work............................................................................................121
		5.4.1 Secure the swing-away lattice with guide rope.....................................................121
		5.4.2 Notes on the position of the telescoping cylinder.................................................122
		5.4.3 Extending/retracting the extension cylinder.......................................................123
		5.4.4 Extending/retracting the swivel ram...............................................................125
		5.4.5 Unlocking/locking the front connection............................................................127
		5.4.6 Unlock/lock the swivel ram........................................................................128
		5.4.7 Unlocking/locking the middle connection...........................................................129
		5.4.8 Locking/unlocking the rear connection.............................................................130
		5.4.9 Establishing/separating the rear connection.......................................................131
		5.4.10 Establishing/separating the slewing connection – mechanical locking..............................132
		5.4.11 Establishing/separating the slewing connection – mechanical locking..............................135
		5.4.12 Section4 / main boom – hydraulic locking........................................................136
		5.4.13 Section4 / main boom– mechanical locking........................................................139
		5.4.14 Establishing/separating connections between lattice extension sections – during installati.......140
		5.4.15 Section1/section2 - Establish/separate the right-hand connection...............................147
		5.4.16 Section1/section2 - Establish/separate the left-hand connection................................148
		5.4.17 Section1/section2 – Establish/separate the folded connection...................................149
		5.4.18 Swinging the swing-away lattice..................................................................151
		5.4.19 Slewing section1................................................................................152
		5.4.20 Establishing/disconnecting the hydraulic connections – Mainboom/swing-away lattice..............153
		5.4.21 Establishing/disconnecting electrical connections to the swing-away lattice......................155
		5.4.22 Folding deflection sheaves out/in................................................................170
		5.4.23 Attaching/removing the hoist rope................................................................173
		5.4.24 Installing / removing the lifting limit switch...................................................175
		5.4.25 Installing / removing the anemometer and air traffic control light...............................177
		5.4.26 Installing / removing the camera.................................................................179
		5.4.27 Main boom operation with a folded swing-away lattice – Necessary rigging work....................181
		5.4.28 Derricking the swing-away lattice for rigging work – hand-held control...........................184
		5.4.29 Set the swing-away lattice down on the rear connection...........................................185
		5.4.30 Derricking the swing-away lattice – Section2 control unit.......................................186
	5.5 Operation with swing-away lattice.......................................................................188
		5.5.1 Setting the RCL...................................................................................188
		5.5.2 Derricking the main boom..........................................................................189
		5.5.3 Telescoping with rigged swing-away lattice........................................................189
		5.5.4 Derricking the swing-away lattice in operation....................................................190
		5.5.5 Procedure if permissible wind speed is exceeded...................................................191
		5.5.6 Information about the main boom operation when the swing-away lattice is folded/rigged............192
		5.5.7 Instructions for turning loads over...............................................................193
	5.6 Maintenance.............................................................................................194
		5.6.5 Description of maintenance work...................................................................195
	5.7 Troubleshooting.........................................................................................202
		5.7.1 Troubleshooting table.............................................................................202
		5.7.2 Swing-away lattice emergency operation............................................................204
6 Boom extension................................................................................................211
	6.1 Notes on this chapter...................................................................................211
	6.2 Operations planning.....................................................................................212
		6.2.1 Assembly..........................................................................................212
		6.2.2 Identification....................................................................................213
		6.2.3 Slinging points...................................................................................214
		6.2.4 Transport dimensions and weights..................................................................215
		6.2.5 Transport condition...............................................................................215
	6.3 Checklists for rigging work.............................................................................216
		6.3.1 Overview..........................................................................................216
		6.3.2 CHECKLIST: Installing the boom extension..........................................................217
		6.3.3 CHECKLIST: Removing the boom extension............................................................221
	6.4 Description of the rigging work.........................................................................226
		6.4.1 Folding the deflection sheave out/in – section5..................................................226
		6.4.2 Installing/removing section5 at the main boom....................................................227
		6.4.3 Connecting/disconnecting the electrical connections – section5/main boom.........................228
		6.4.4 Connecting/disconnecting the hydraulic connections – section5/main boom..........................230
		6.4.5 Folding the deflection sheave out/in – section4..................................................231
		6.4.6 Folding the deflection sheave out/in – section2..................................................232
		6.4.7 Connecting/disconnecting the electrical connections – section4/section5.........................233
		6.4.8 Connecting/disconnecting the hydraulic connections – section4/section5..........................235
		6.4.9 Installing/removing the swing-away lattice on section5 – Hydraulic locking.......................236
		6.4.10 Installing/removing the swing-away lattice on section5 – Mechanical locking.....................239
		6.4.11 Positioning/removing the hoist rope – section5 up to section4..................................240
	6.5 Operation with boom extension...........................................................................241
		6.5.1 Setting the RCL...................................................................................241
		6.5.2 Derricking, telescoping the main boom.............................................................242
		6.5.3 Procedure if permissible wind speed is exceeded...................................................243
		6.5.4 Instructions for turning loads over...............................................................243
	6.6 Maintenance.............................................................................................244
		6.6.3 Description of maintenance work...................................................................245
7 Integral heavy load lattice extension (ISS) 4.1m/12.1m......................................................249
	7.1 Operations planning.....................................................................................250
		7.1.1 Assembly..........................................................................................250
		7.1.2 Identification....................................................................................251
		7.1.3 Slinging points...................................................................................252
		7.1.4 Transport dimensions and weights..................................................................253
		7.1.5 Transport condition...............................................................................253
	7.2 Checklists for rigging work.............................................................................255
		7.2.1 Overview..........................................................................................255
		7.2.2 CHECKLIST: Installing the ISS 4.1m...............................................................256
		7.2.3 CHECKLIST: Removing the ISS 4.1m.................................................................261
		7.2.4 CHECKLIST: Installing the ISS 12.1m..............................................................265
		7.2.5 CHECKLIST: Removing the ISS 12.1m................................................................271
	7.3 Rigging work............................................................................................277
		7.3.1 Breaking the connection – section4/swing-away lattice............................................277
		7.3.2 Installing section4 / removing it – hydraulic locking............................................279
		7.3.3 Installing section4 / removing it – mechanical locking...........................................282
		7.3.4 Making/breaking the electrical connections – section4 / main boom................................283
		7.3.5 Making/breaking the hydraulic connections – section4 / main boom.................................285
		7.3.6 Folding out / folding in the deflection sheave on section4.......................................286
		7.3.7 Folding out / folding in the head sheave on section4.............................................287
		7.3.8 Positioning/removing the hoist rope – section4...................................................288
		7.3.9 Possible reeving methods on the heavy load lattice extension......................................289
		7.3.10 Installing / removing the lifting limit switch...................................................291
		7.3.11 Installing / removing the anemometer and air traffic control light...............................292
		7.3.12 Installing / removing the camera.................................................................294
		7.3.13 Folding out / folding in the deflection sheave on section5......................................295
		7.3.14 Mounting section5 to the main boom / removing it from the main boom.............................296
		7.3.15 Making/breaking the electrical connections – section5 / main boom...............................297
		7.3.16 Making/breaking the hydraulic connections – section5 / main boom................................299
		7.3.17 Installing section4 on to section5 / removing it – hydraulic locking...........................300
		7.3.18 Installing section4 on to section5 / removing it – mechanical locking..........................303
		7.3.19 Making the electrical connections between section4 and section5................................304
		7.3.20 Making the hydraulic connection between section4 and section 5..................................306
		7.3.21 Positioning/removing the hoist rope – section5 and section4....................................307
	7.4 ISS, derricking.........................................................................................309
	7.5 Operation with the ISS..................................................................................311
		7.5.1 Setting the RCL...................................................................................311
		7.5.2 Derricking, telescoping the main boom.............................................................313
		7.5.3 Procedure if permissible wind speeds are exceeded.................................................313
		7.5.4 Instructions for turning loads over...............................................................314
	7.6 Maintenance.............................................................................................315
		7.6.1 Maintenance plan W................................................................................315
		7.6.2 Maintenance plan M 1..............................................................................315
		7.6.3 Maintenance plan M 3..............................................................................315
		7.6.4 Maintenance plan M12..............................................................................316
		7.6.5 Description of maintenance work...................................................................316
8 Auxiliary single-sheave boom top 1............................................................................323
	8.1 Operations planning.....................................................................................323
		8.1.1 Identification and slinging points................................................................323
		8.1.2 Transport dimensions and weights..................................................................324
		8.1.3 Transport condition...............................................................................324
	8.2 Rigging work............................................................................................325
		8.2.1 Moving the auxiliary single-sheave boom top into the working position.............................325
		8.2.2 Moving the auxiliary single-sheave boom top into the transport position...........................327
		8.2.3 Installing / removing a folded up auxiliary single-sheave boom top................................329
		8.2.4 Attaching and removing the hoist rope.............................................................330
		8.2.5 Installing / removing the lifting limit switch and anemometer.....................................331
	8.3 Operation with the auxiliary single-sheave boom top 1...................................................333
		8.3.1 Setting the RCL...................................................................................333
		8.3.2 Procedure if permissible wind speeds are exceeded.................................................334
		8.3.3 Instructions for turning loads over...............................................................334
	8.4 Maintenance.............................................................................................335
		8.4.3 Description of maintenance work...................................................................336
9 Auxiliary single-sheave boom top2............................................................................339
	9.1 Operations planning.....................................................................................339
		9.1.1 Identification and slinging points................................................................339
		9.1.2 Transport dimensions and weights..................................................................340
		9.1.3 Transport condition...............................................................................340
	9.2 Rigging work............................................................................................341
		9.2.1 Moving the auxiliary single-sheave boom top into the working position.............................341
		9.2.2 Moving the auxiliary single-sheave boom top into the transport position...........................343
		9.2.3 Installing/removing a folded up auxiliary single-sheave boomtop..................................345
		9.2.4 Attaching and removing the hoist rope.............................................................346
		9.2.5 Lifting limit switch and anemometer...............................................................347
	9.3 Operation with the lattice extension 2..................................................................349
		9.3.1 Setting the RCL...................................................................................349
		9.3.2 Procedure if permissible wind speeds are exceeded.................................................350
		9.3.3 Instructions for turning loads over...............................................................350
	9.4 Maintenance.............................................................................................351
		9.4.3 Description of maintenance work...................................................................352
10 Turning loads over...........................................................................................355
	10.1 Setting the RCL........................................................................................356
	10.2 Turning a load over....................................................................................357
11 Driving with a rigged crane..................................................................................361
	11.1 Safety instructions....................................................................................361
	11.2 Driving path...........................................................................................362
	11.3 Permissible rigging modes and axle loads...............................................................363
		11.3.1 Swing-away lattice...............................................................................364
		11.3.2 Boom extension...................................................................................368
		11.3.3 Heavy load lattice extension 2.0m/10m..........................................................371
		11.3.4 Heavy load lattice extension 4.1m/12.1m........................................................375
		11.3.5 Integral heavy load lattice extension............................................................377
		11.3.6 Auxiliary single-sheave boom top 1 and auxiliary single-sheave boom top 2........................377
	11.4 Before driving.........................................................................................378
	11.5 While driving..........................................................................................378
	11.6 After driving..........................................................................................378
12 Index........................................................................................................381
	A...........................................................................................................383
	B...........................................................................................................383
	C...........................................................................................................384
	D...........................................................................................................384
	H...........................................................................................................384
	I...........................................................................................................385
	L...........................................................................................................386
	M...........................................................................................................386
	O...........................................................................................................386
	P...........................................................................................................386
	S...........................................................................................................386
	T...........................................................................................................388

Contact us: [email protected]

PLEASE NOTE:

  • This is the SAME manual used by the dealers to troubleshoot any faults in your vehicle. This can be yours in 2 minutes after the payment is made.
  • Contact us at [email protected] should you have any queries before your purchase or that you need any other service / repair / parts operators manual.

S.V

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order