★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302451 – PDF DOWNLOAD

$28.95

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302451 – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302451 – PDF DOWNLOAD

FILE DETAILS:

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302451 – PDF DOWNLOAD

Language : English
Pages : 398
Downloadable : Yes
File Type : PDF

DESCRIPTION:

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302451 – PDF DOWNLOAD

About these operating instructions:
1.1 Validity:

Validity of these operating instructions:

  • These operating instructions apply only to lattice extensions supplied by
    Manitowoc Crane Group Germany GmbH.
  • In addition, for the operation of the truck crane with a lattice extension described in these
    operating instructions, all details in the Operating manual GMK 5250L, supplied by the factory for
    the lattice extensions are applicable.

Prerequisites for assembly and operation:

The lattice extensions described in this operating manual may only be operated together with a
GROVE truck crane GMK 5250L whose serial number is identical with the serial number marked on the
lattice extensions.

References to other operating manuals:

  • Cross references to other operating or maintenance manuals are shown for instance in the following
    form: à Operating manual GMK5250L.
  • The subject that is referenced can be found in the index or table of contents
    of the document to which reference is made.

TABLE OF CONTENTS:

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302451 – PDF DOWNLOAD

1 About these operating instructions............................................................................  7
	1.1 Validity................................................................................................  7
	1.2 Terms used..............................................................................................  9
2 Basic safety instructions..................................................................................... 13
	2.1 Other applicable documents.............................................................................. 13
	2.2 Safety instructions for working with a lattice extension................................................ 14
3 Operating elements............................................................................................ 17
	3.1 On the lattice extension................................................................................ 17
		3.1.1 Overview.......................................................................................... 17
		3.1.2 Hand-held control of the lattice extension........................................................ 18
		3.1.3 Connecting the lattice extension hand-held control................................................ 20
		3.1.4 Section2 control unit............................................................................ 21
	3.2 In the crane cab........................................................................................ 23
		3.2.1 Overview.......................................................................................... 23
		3.2.2 On the CCS control unit........................................................................... 24
		3.2.3 On the RCL control unit........................................................................... 27
		3.2.4 At the right of the control console............................................................... 28
	3.3 On the hand-held control................................................................................ 29
		3.3.1 Connecting hand-held control...................................................................... 31
4 Rigging work on the main boom................................................................................. 35
	4.1 Hose reel............................................................................................... 35
		4.1.1 Slinging points................................................................................... 35
		4.1.2 Transport dimensions and weights.................................................................. 36
	4.2 Rigging work on the hose reel........................................................................... 37
		4.2.1 Fitting / removing the hose reel.................................................................. 37
		4.2.2 Checking the rotation lock on the hose reel....................................................... 39
		4.2.3 Positions of the hydraulic connections.......................................................... 40
5 Swing-away lattice............................................................................................ 47
	5.1 Notes on this chapter................................................................................... 47
	5.2 Operations planning..................................................................................... 47
		5.2.1 Assembly.......................................................................................... 47
		5.2.2 Identification.................................................................................... 49
		5.2.3 Slinging points................................................................................... 50
		5.2.4 Transport dimensions and weights.................................................................. 52
		5.2.5 Transport condition – removed..................................................................... 54
		5.2.6 Transport condition – folded...................................................................... 57
	5.3 Checklists for rigging work............................................................................. 59
		5.3.1 Overview.......................................................................................... 59
		5.3.2 CHECKLIST: Installing the swing-away lattice – into the working position.......................... 61
		5.3.3 CHECKLIST: Installing the swing-away lattice – into the transport position........................ 69
		5.3.4 CHECKLIST: Removing the swing-away lattice – from the working position............................ 77
		5.3.5 CHECKLIST: Removing the swing-away lattice – from thetransport position.......................... 83
		5.3.6 CHECKLIST: Rigging the swing-away lattice 2 + 10.5 m (6.6 + 34.5 ft) – in the working position.... 87
		5.3.7 CHECKLIST: Rigging the swing-away lattice 2 + 19.3 m (6.6 + 63.3 ft) – in the working position.... 93
		5.3.8 CHECKLIST: Rigging the swing-away lattice 2 + 10.5 m (6.6 + 34.5 ft) – in the transport pos....... 99
		5.3.9 CHECKLIST: Rigging the swing-away lattice 2 + 19.3 m (6.6 + 63.3 ft) – in the transport pos.......107
		5.3.10 CHECKLIST: Further rigging work..................................................................115
	5.4 Rigging work............................................................................................117
		5.4.1 Secure the swing-away lattice with guide rope.....................................................117
		5.4.2 Notes on the position of the telescoping cylinder.................................................118
		5.4.3 Extending/retracting the extension cylinder.......................................................119
		5.4.4 Extending/retracting the swivel ram...............................................................121
		5.4.5 Unlocking/locking the front connection............................................................123
		5.4.6 Unlock/lock the swivel ram........................................................................124
		5.4.7 Unlocking/locking the middle connection...........................................................125
		5.4.8 Locking/unlocking the rear connection.............................................................126
		5.4.9 Establishing/separating the rear connection.......................................................127
		5.4.10 Establishing/separating the slewing connection – mechanical locking..............................128
		5.4.11 Establishing/separating the slewing connection – mechanical locking..............................131
		5.4.12 Section4 / main boom – hydraulic locking........................................................132
		5.4.13 Section4 / main boom– mechanical locking........................................................135
		5.4.14 Establishing/separating connections between lattice extension sections – during installati.......136
		5.4.15 Section1/section2 - Establish/separate the right-hand connection...............................143
		5.4.16 Section1/section2 - Establish/separate the left-hand connection................................144
		5.4.17 Section1/section2 – Establish/separate the folded connection...................................145
		5.4.18 Swinging the swing-away lattice..................................................................147
		5.4.19 Slewing section1................................................................................148
		5.4.20 Establishing/disconnecting the hydraulic connections – Mainboom/swing-away lattice..............149
		5.4.21 Establishing/disconnecting electrical connections to the swing-away lattice......................151
		5.4.22 Folding deflection sheaves out/in................................................................166
		5.4.23 Attaching/removing the hoist rope................................................................169
		5.4.24 Installing / removing the lifting limit switch...................................................171
		5.4.25 Installing / removing the anemometer and air traffic control light...............................173
		5.4.26 Installing / removing the camera.................................................................175
		5.4.27 Main boom operation with a folded swing-away lattice – Necessary rigging work....................177
		5.4.28 Derricking the swing-away lattice for rigging work – hand-held control...........................180
		5.4.29 Set the swing-away lattice down on the rear connection...........................................181
		5.4.30 Derricking the swing-away lattice – Section2 control unit.......................................182
	5.5 Operation with swing-away lattice.......................................................................184
		5.5.1 Setting the RCL...................................................................................184
		5.5.2 Derricking the main boom..........................................................................185
		5.5.3 Telescoping with rigged swing-away lattice........................................................185
		5.5.4 Derricking the swing-away lattice in operation....................................................186
		5.5.5 Procedure if permissible wind speed is exceeded...................................................187
		5.5.6 Information about the main boom operation when the swing-away lattice is folded/rigged............188
		5.5.7 Instructions for turning loads over...............................................................189
	5.6 Maintenance.............................................................................................190
		5.6.5 Description of maintenance work...................................................................191
	5.7 Troubleshooting.........................................................................................198
		5.7.1 Troubleshooting table.............................................................................198
		5.7.2 Swing-away lattice emergency operation............................................................200
6 Boom extension................................................................................................207
	6.1 Notes on this chapter...................................................................................207
	6.2 Operations planning.....................................................................................208
		6.2.1 Assembly..........................................................................................208
		6.2.2 Identification....................................................................................209
		6.2.3 Slinging points...................................................................................210
		6.2.4 Transport dimensions and weights..................................................................211
		6.2.5 Transport condition...............................................................................211
	6.3 Checklists for rigging work.............................................................................212
		6.3.1 Overview..........................................................................................212
		6.3.2 CHECKLIST: Installing the boom extension..........................................................213
		6.3.3 CHECKLIST: Removing the boom extension............................................................217
	6.4 Description of the rigging work.........................................................................222
		6.4.1 Folding the deflection sheave out/in – section5..................................................222
		6.4.2 Installing/removing section5 at the main boom....................................................223
		6.4.3 Connecting/disconnecting the electrical connections – section5/main boom.........................224
		6.4.4 Connecting/disconnecting the hydraulic connections – section5/main boom..........................226
		6.4.5 Folding the deflection sheave out/in – section4..................................................227
		6.4.6 Folding the deflection sheave out/in – section2..................................................228
		6.4.7 Connecting/disconnecting the electrical connections – section4/section5.........................229
		6.4.8 Connecting/disconnecting the hydraulic connections – section4/section5..........................231
		6.4.9 Installing/removing the swing-away lattice on section5 – Hydraulic locking.......................232
		6.4.10 Installing/removing the swing-away lattice on section5 – Mechanical locking.....................235
		6.4.11 Positioning/removing the hoist rope – section5 up to section4..................................236
	6.5 Operation with boom extension...........................................................................237
		6.5.1 Setting the RCL...................................................................................237
		6.5.2 Derricking, telescoping the main boom.............................................................238
		6.5.3 Procedure if permissible wind speed is exceeded...................................................239
		6.5.4 Instructions for turning loads over...............................................................239
	6.6 Maintenance.............................................................................................240
		6.6.3 Description of maintenance work...................................................................241
7 Integral heavy load lattice extension (ISS) 4.1m/12.1m (13.5ft/39.7ft)....................................245
	7.1 Operations planning.....................................................................................246
		7.1.1 Assembly..........................................................................................246
		7.1.2 Identification....................................................................................247
		7.1.3 Slinging points...................................................................................248
		7.1.4 Transport dimensions and weights..................................................................249
		7.1.5 Transport condition...............................................................................249
	7.2 Checklists for rigging work.............................................................................251
		7.2.1 Overview..........................................................................................251
		7.2.2 CHECKLIST: Installing the ISS 4.1m (13.5 ft).....................................................252
		7.2.3 CHECKLIST: Removing the ISS 4.1m (13.5 ft).......................................................257
		7.2.4 CHECKLIST: Installing the ISS 12.1m (39.7 ft)....................................................261
		7.2.5 CHECKLIST: Removing the ISS 12.1m (39.7 ft)......................................................267
	7.3 Rigging work............................................................................................273
		7.3.1 Breaking the connection – section4/swing-away lattice............................................273
		7.3.2 Installing section4 / removing it – hydraulic locking............................................275
		7.3.3 Installing section4 / removing it – mechanical locking...........................................278
		7.3.4 Making/breaking the electrical connections – section4 / main boom................................279
		7.3.5 Making/breaking the hydraulic connections – section4 / main boom.................................281
		7.3.6 Folding out / folding in the deflection sheave on section4.......................................282
		7.3.7 Folding out / folding in the head sheave on section4.............................................283
		7.3.8 Positioning/removing the hoist rope – section4...................................................284
		7.3.9 Possible reeving methods on the heavy load lattice extension......................................285
		7.3.10 Installing / removing the lifting limit switch...................................................287
		7.3.11 Installing / removing the anemometer and air traffic control light...............................288
		7.3.12 Installing / removing the camera.................................................................290
		7.3.13 Folding out / folding in the deflection sheave on section5......................................291
		7.3.14 Mounting section5 to the main boom / removing it from the main boom.............................292
		7.3.15 Making/breaking the electrical connections – section5 / main boom...............................293
		7.3.16 Making/breaking the hydraulic connections – section5 / main boom................................295
		7.3.17 Installing section4 on to section5 / removing it – hydraulic locking...........................296
		7.3.18 Installing section4 on to section5 / removing it – mechanical locking..........................299
		7.3.19 Making the electrical connections between section4 and section5................................300
		7.3.20 Making the hydraulic connection between section4 and section 5..................................302
		7.3.21 Positioning/removing the hoist rope – section5 and section4....................................303
	7.4 ISS, derricking.........................................................................................305
	7.5 Operation with the ISS..................................................................................307
		7.5.1 Setting the RCL...................................................................................307
		7.5.2 Derricking, telescoping the main boom.............................................................309
		7.5.3 Procedure if permissible wind speeds are exceeded.................................................309
		7.5.4 Instructions for turning loads over...............................................................310
	7.6 Maintenance.............................................................................................311
		7.6.1 Maintenance plan W................................................................................311
		7.6.2 Maintenance plan M 1..............................................................................311
		7.6.3 Maintenance plan M 3..............................................................................311
		7.6.4 Maintenance plan M12..............................................................................312
		7.6.5 Description of maintenance work...................................................................312
8 Auxiliary single-sheave boom top 1............................................................................319
	8.1 Operations planning.....................................................................................319
		8.1.1 Identification and slinging points................................................................319
		8.1.2 Transport dimensions and weights..................................................................320
		8.1.3 Transport condition...............................................................................320
	8.2 Rigging work............................................................................................321
		8.2.1 Moving the auxiliary single-sheave boom top into the working position.............................321
		8.2.2 Moving the auxiliary single-sheave boom top into the transport position...........................323
		8.2.3 Installing / removing a folded up auxiliary single-sheave boom top................................325
		8.2.4 Attaching and removing the hoist rope.............................................................326
		8.2.5 Installing / removing the lifting limit switch and anemometer.....................................327
	8.3 Operation with the auxiliary single-sheave boom top 1...................................................329
		8.3.1 Setting the RCL...................................................................................329
		8.3.2 Procedure if permissible wind speeds are exceeded.................................................330
		8.3.3 Instructions for turning loads over...............................................................330
	8.4 Maintenance.............................................................................................331
		8.4.3 Description of maintenance work...................................................................332
9 Auxiliary single-sheave boom top2............................................................................335
	9.1 Operations planning.....................................................................................335
		9.1.1 Identification and slinging points................................................................335
		9.1.2 Transport dimensions and weights..................................................................336
		9.1.3 Transport condition...............................................................................336
	9.2 Rigging work............................................................................................337
		9.2.1 Moving the auxiliary single-sheave boom top into the working position.............................337
		9.2.2 Moving the auxiliary single-sheave boom top into the transport position...........................339
		9.2.3 Installing/removing a folded up auxiliary single-sheave boomtop..................................341
		9.2.4 Attaching and removing the hoist rope.............................................................342
		9.2.5 Lifting limit switch and anemometer...............................................................343
	9.3 Operation with the lattice extension 2..................................................................345
		9.3.1 Setting the RCL...................................................................................345
		9.3.2 Procedure if permissible wind speeds are exceeded.................................................346
		9.3.3 Instructions for turning loads over...............................................................346
	9.4 Maintenance.............................................................................................347
		9.4.3 Description of maintenance work...................................................................348
10 Turning loads over...........................................................................................351
	10.1 Setting the RCL........................................................................................352
	10.2 Turning a load over....................................................................................353
11 Driving with a rigged crane..................................................................................357
	11.1 Safety instructions....................................................................................357
	11.2 Driving path...........................................................................................358
	11.3 Permissible rigging modes and axle loads...............................................................359
		11.3.1 Swing-away lattice...............................................................................360
		11.3.2 Boom extension...................................................................................368
		11.3.3 Heavy load lattice extension 2.0m/10m (6.6ft/32.8ft).........................................374
		11.3.4 Heavy load lattice extension 4.1m/12.1m (13.5ft/39.7ft)......................................380
		11.3.5 Integral heavy load lattice extension............................................................384
		11.3.6 Auxiliary single-sheave boom top 1 and auxiliary single-sheave boom top 2........................384
	11.4 Before driving.........................................................................................385
	11.5 While driving..........................................................................................385
	11.6 After driving..........................................................................................385
12 Index........................................................................................................389
	A...........................................................................................................391
	B...........................................................................................................391
	C...........................................................................................................392
	D...........................................................................................................392
	H...........................................................................................................392
	I...........................................................................................................393
	L...........................................................................................................394
	M...........................................................................................................394
	O...........................................................................................................394
	P...........................................................................................................394
	S...........................................................................................................394
	T...........................................................................................................396

IMAGES PREVIEW OF THE MANUAL:

Customer Support: [email protected]

PLEASE NOTE:

  • This is not a physical manual but a digital manual – meaning no physical copy will be couriered to you. The manual can be yours in the next 2 mins as once you make the payment, you will be directed to the download page IMMEDIATELY.
  • This is the same manual used by the dealers inorder to diagnose your vehicle of its faults.
  • Require some other service manual or have any queries: please WRITE to us at [email protected]

S.V

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order