★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302457 – PDF DOWNLOAD

$28.95

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302457 – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302457 – PDF DOWNLOAD

FILE DETAILS:

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302457 – PDF DOWNLOAD

Language : English
Pages : 190
Downloadable : Yes
File Type : PDF

DESCRIPTION:

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302457 – PDF DOWNLOAD

About these operating instructions:
1.1 Validity:

Validity of these operating instructions:

  • These operating instructions apply only to lattice extensions supplied by
    Manitowoc Crane Group Germany GmbH.
  • In addition, for the operation of the truck crane with a lattice extension described in these
    operating instructions, all details in the Operating manual GMK 5250L, supplied by the factory for
    the lattice extensions are applicable.

Prerequisites for assembly and operation:

The lattice extensions described in this operating manual may only be operated together with a
GROVE truck crane GMK 5250L whose serial number is identical with the serial number marked on the
lattice extensions.

References to other operating manuals:

  • Cross references to other operating or maintenance manuals are shown for instance in the following
    form: à Operating manual GMK5250L.
  • The subject that is referenced can be found in the index or table of contents
    of the document to which reference is made.

IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302457 – PDF DOWNLOAD

Fitting the hoist rope on auxiliary single-sheave boom top 1...............................  3
	Validity...............................................................................  3
	Versions...............................................................................  3
	Moving the rod.........................................................................  4
1 About these operating instructions.......................................................  9
	1.1 Validity...........................................................................  9
	1.2 Terms used......................................................................... 11
2 Basic safety instructions................................................................ 15
	2.1 Other applicable documents......................................................... 15
	2.2 Safety instructions for working with a lattice extension........................... 16
3 Operating elements....................................................................... 19
	3.1 On the lattice extension........................................................... 19
		3.1.1 Overview..................................................................... 19
		3.1.2 Hand-held control of the lattice extension................................... 20
		3.1.3 Connecting the lattice extension hand-held control........................... 22
		3.1.4 Section2 control unit....................................................... 23
	3.2 In the crane cab................................................................... 25
		3.2.1 Overview..................................................................... 25
		3.2.2 On the CCS control unit...................................................... 26
		3.2.3 On the RCL control unit...................................................... 29
		3.2.4 At the right of the control console.......................................... 30
	3.3 On the hand-held control........................................................... 31
		3.3.1 Connecting hand-held control................................................. 33
4 Rigging work on the main boom............................................................ 37
	4.1 Hose reel.......................................................................... 37
		4.1.1 Slinging points.............................................................. 37
		4.1.2 Transport dimensions and weights............................................. 38
	4.2 Rigging work on the hose reel...................................................... 39
		4.2.1 Fitting / removing the hose reel............................................. 39
		4.2.2 Checking the rotation lock on the hose reel.................................. 41
		4.2.3 Positions of the hydraulic connections..................................... 42
5 Heavy load lattice extension (SLS) 2.0 m/10.0 m (6.6 ft/32.8 ft)......................... 49
	5.1 Operations planning................................................................ 49
		5.1.1 Assembly..................................................................... 49
		5.1.2 Identification............................................................... 50
		5.1.3 Slinging points.............................................................. 51
		5.1.4 Transport dimensions and weights............................................. 52
		5.1.5 Transport condition.......................................................... 53
	5.2 Checklists for rigging work........................................................ 55
		5.2.1 Overview..................................................................... 55
		5.2.2 CHECKLIST: SLS 2.0 m (6.6 ft) installation into the working position......... 56
		5.2.3 CHECKLIST: SLS 2.0 m (6.6 ft) installation into the transport position....... 59
		5.2.4 CHECKLIST: SLS 2.0 m (6.6 ft) removal from the working position.............. 60
		5.2.5 CHECKLIST: SLS 2.0 m (6.6 ft) removal from the transport position............ 63
		5.2.6 CHECKLIST: SLS 2.0 m (6.6 ft) rigging into the working position.............. 65
		5.2.7 CHECKLIST: SLS 2.0 m (6.6 ft) rigging into the transport position............ 68
		5.2.8 CHECKLIST: SLS 10.0 m (32.8 ft) installation................................. 71
		5.2.9 CHECKLIST: SLS 10.0 m (32.8 ft) removal...................................... 75
	5.3 Rigging work....................................................................... 79
		5.3.1 Mounting section 6 to the main boom / removing it from themain boom......... 79
		5.3.2 Moving section 6 into the working position / transport position:............. 82
		5.3.3 Making/breaking the electrical connections – section 6 / main boom........... 84
		5.3.4 Installing / removing the deflection sheave – section 6...................... 86
		5.3.5 Positioning / removing the hoist rope – section 6............................ 87
		5.3.6 Possible reeving methods on the heavy load lattice extension................. 89
		5.3.7 Installing / removing the lifting limit switch............................... 91
		5.3.8 Setting the angle............................................................ 92
		5.3.9 Installing / removing the anemometer and air traffic control light........... 93
		5.3.10 Installing / removing the camera............................................ 95
		5.3.11 Folding out / folding in the deflection sheave on section 5................. 96
		5.3.12 Mounting section 5 to the main boom / removing it from the main boom........ 97
		5.3.13 Making/breaking the electrical connections – section 5 / main boom.......... 98
		5.3.14 Installing section 6 on to section 5 / removing it..........................100
		5.3.15 Making the electrical connections between section 6 and section 5...........101
		5.3.16 Positioning / removing the hoist rope – section 5 and section 6.............103
	5.4 Operating the heavy load lattice extension.........................................105
		5.4.1 Setting the RCL..............................................................105
		5.4.2 Derricking, telescoping the main boom........................................107
		5.4.3 Procedure if permissible wind speeds are exceeded............................107
		5.4.4 Instructions for turning loads over..........................................108
	5.5 Maintenance........................................................................109
		5.5.3 Description of maintenance work..............................................110
6 Auxiliary single-sheave boom top 1.......................................................113
	6.1 Operations planning................................................................113
		6.1.1 Identification and slinging points...........................................113
		6.1.2 Transport dimensions and weights.............................................114
		6.1.3 Transport condition..........................................................114
	6.2 Rigging work.......................................................................115
		6.2.1 Moving the auxiliary single-sheave boom top into the working position........115
		6.2.2 Moving the auxiliary single-sheave boom top into the transport position......117
		6.2.3 Installing / removing a folded up auxiliary single-sheave boom top...........119
		6.2.4 Attaching and removing the hoist rope........................................120
		6.2.5 Installing / removing the lifting limit switch and anemometer................121
	6.3 Operation with the auxiliary single-sheave boom top 1..............................123
		6.3.1 Setting the RCL..............................................................123
		6.3.2 Procedure if permissible wind speeds are exceeded............................124
		6.3.3 Instructions for turning loads over..........................................124
	6.4 Maintenance........................................................................125
		6.4.3 Description of maintenance work..............................................126
7 Auxiliary single-sheave boom top2.......................................................129
	7.1 Operations planning................................................................129
		7.1.1 Identification and slinging points...........................................129
		7.1.2 Transport dimensions and weights.............................................130
		7.1.3 Transport condition..........................................................130
	7.2 Rigging work.......................................................................131
		7.2.1 Moving the auxiliary single-sheave boom top into the working position........131
		7.2.2 Moving the auxiliary single-sheave boom top into the transport position......133
		7.2.3 Installing/removing a folded up auxiliary single-sheave boomtop.............135
		7.2.4 Attaching and removing the hoist rope........................................136
		7.2.5 Lifting limit switch and anemometer..........................................137
	7.3 Operation with the lattice extension 2.............................................139
		7.3.1 Setting the RCL..............................................................139
		7.3.2 Procedure if permissible wind speeds are exceeded............................140
		7.3.3 Instructions for turning loads over..........................................140
	7.4 Maintenance........................................................................141
		7.4.3 Description of maintenance work..............................................142
8 Turning loads over.......................................................................145
	8.1 Setting the RCL....................................................................146
	8.2 Turning a load over................................................................147
9 Driving with a rigged crane..............................................................151
	9.1 Safety instructions................................................................151
	9.2 Driving path.......................................................................152
	9.3 Permissible rigging modes and axle loads...........................................153
		9.3.1 Swing-away lattice...........................................................154
		9.3.2 Boom extension...............................................................162
		9.3.3 Heavy load lattice extension 2.0m/10m (6.6ft/32.8ft).....................168
		9.3.4 Heavy load lattice extension 4.1m/12.1m (13.5ft/39.7ft)..................174
		9.3.5 Integral heavy load lattice extension........................................178
		9.3.6 Auxiliary single-sheave boom top 1 and auxiliary single-sheave boom top 2....178
	9.4 Before driving.....................................................................179
	9.5 While driving......................................................................179
	9.6 After driving......................................................................179
10 Index...................................................................................183
	A......................................................................................185
	B......................................................................................185
	D......................................................................................185
	H......................................................................................186
	I......................................................................................187
	L......................................................................................187
	M......................................................................................187
	O......................................................................................187
	P......................................................................................187
	S......................................................................................188
	T......................................................................................188

Need help? Contact: [email protected]

https://vimeo.com/851901610?share=copy

PLEASE NOTE:

  • This is the SAME exact manual used by your dealers to fix your vehicle.
  • The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
  • Any queries / doubts regarding your purchase, please feel free to contact [email protected]

S.V

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order