Grove Crane GMK 5250L Lattice Extension Operating Manual 3302457 – PDF DOWNLOAD
$28.95
Grove Crane GMK 5250L Lattice Extension Operating Manual 3302457 – PDF DOWNLOAD
Description
Grove Crane GMK 5250L Lattice Extension Operating Manual 3302457 – PDF DOWNLOAD
FILE DETAILS:
Grove Crane GMK 5250L Lattice Extension Operating Manual 3302457 – PDF DOWNLOAD
Language : English
Pages : 190
Downloadable : Yes
File Type : PDF
DESCRIPTION:
Grove Crane GMK 5250L Lattice Extension Operating Manual 3302457 – PDF DOWNLOAD
About these operating instructions:
1.1 Validity:
Validity of these operating instructions:
- These operating instructions apply only to lattice extensions supplied by
Manitowoc Crane Group Germany GmbH. - In addition, for the operation of the truck crane with a lattice extension described in these
operating instructions, all details in the Operating manual GMK 5250L, supplied by the factory for
the lattice extensions are applicable.
Prerequisites for assembly and operation:
The lattice extensions described in this operating manual may only be operated together with a
GROVE truck crane GMK 5250L whose serial number is identical with the serial number marked on the
lattice extensions.
References to other operating manuals:
- Cross references to other operating or maintenance manuals are shown for instance in the following
form: à Operating manual GMK5250L. - The subject that is referenced can be found in the index or table of contents
of the document to which reference is made.
IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:
Grove Crane GMK 5250L Lattice Extension Operating Manual 3302457 – PDF DOWNLOAD
Fitting the hoist rope on auxiliary single-sheave boom top 1............................... 3 Validity............................................................................... 3 Versions............................................................................... 3 Moving the rod......................................................................... 4 1 About these operating instructions....................................................... 9 1.1 Validity........................................................................... 9 1.2 Terms used......................................................................... 11 2 Basic safety instructions................................................................ 15 2.1 Other applicable documents......................................................... 15 2.2 Safety instructions for working with a lattice extension........................... 16 3 Operating elements....................................................................... 19 3.1 On the lattice extension........................................................... 19 3.1.1 Overview..................................................................... 19 3.1.2 Hand-held control of the lattice extension................................... 20 3.1.3 Connecting the lattice extension hand-held control........................... 22 3.1.4 Section2 control unit....................................................... 23 3.2 In the crane cab................................................................... 25 3.2.1 Overview..................................................................... 25 3.2.2 On the CCS control unit...................................................... 26 3.2.3 On the RCL control unit...................................................... 29 3.2.4 At the right of the control console.......................................... 30 3.3 On the hand-held control........................................................... 31 3.3.1 Connecting hand-held control................................................. 33 4 Rigging work on the main boom............................................................ 37 4.1 Hose reel.......................................................................... 37 4.1.1 Slinging points.............................................................. 37 4.1.2 Transport dimensions and weights............................................. 38 4.2 Rigging work on the hose reel...................................................... 39 4.2.1 Fitting / removing the hose reel............................................. 39 4.2.2 Checking the rotation lock on the hose reel.................................. 41 4.2.3 Positions of the hydraulic connections..................................... 42 5 Heavy load lattice extension (SLS) 2.0 m/10.0 m (6.6 ft/32.8 ft)......................... 49 5.1 Operations planning................................................................ 49 5.1.1 Assembly..................................................................... 49 5.1.2 Identification............................................................... 50 5.1.3 Slinging points.............................................................. 51 5.1.4 Transport dimensions and weights............................................. 52 5.1.5 Transport condition.......................................................... 53 5.2 Checklists for rigging work........................................................ 55 5.2.1 Overview..................................................................... 55 5.2.2 CHECKLIST: SLS 2.0 m (6.6 ft) installation into the working position......... 56 5.2.3 CHECKLIST: SLS 2.0 m (6.6 ft) installation into the transport position....... 59 5.2.4 CHECKLIST: SLS 2.0 m (6.6 ft) removal from the working position.............. 60 5.2.5 CHECKLIST: SLS 2.0 m (6.6 ft) removal from the transport position............ 63 5.2.6 CHECKLIST: SLS 2.0 m (6.6 ft) rigging into the working position.............. 65 5.2.7 CHECKLIST: SLS 2.0 m (6.6 ft) rigging into the transport position............ 68 5.2.8 CHECKLIST: SLS 10.0 m (32.8 ft) installation................................. 71 5.2.9 CHECKLIST: SLS 10.0 m (32.8 ft) removal...................................... 75 5.3 Rigging work....................................................................... 79 5.3.1 Mounting section 6 to the main boom / removing it from themain boom......... 79 5.3.2 Moving section 6 into the working position / transport position:............. 82 5.3.3 Making/breaking the electrical connections – section 6 / main boom........... 84 5.3.4 Installing / removing the deflection sheave – section 6...................... 86 5.3.5 Positioning / removing the hoist rope – section 6............................ 87 5.3.6 Possible reeving methods on the heavy load lattice extension................. 89 5.3.7 Installing / removing the lifting limit switch............................... 91 5.3.8 Setting the angle............................................................ 92 5.3.9 Installing / removing the anemometer and air traffic control light........... 93 5.3.10 Installing / removing the camera............................................ 95 5.3.11 Folding out / folding in the deflection sheave on section 5................. 96 5.3.12 Mounting section 5 to the main boom / removing it from the main boom........ 97 5.3.13 Making/breaking the electrical connections – section 5 / main boom.......... 98 5.3.14 Installing section 6 on to section 5 / removing it..........................100 5.3.15 Making the electrical connections between section 6 and section 5...........101 5.3.16 Positioning / removing the hoist rope – section 5 and section 6.............103 5.4 Operating the heavy load lattice extension.........................................105 5.4.1 Setting the RCL..............................................................105 5.4.2 Derricking, telescoping the main boom........................................107 5.4.3 Procedure if permissible wind speeds are exceeded............................107 5.4.4 Instructions for turning loads over..........................................108 5.5 Maintenance........................................................................109 5.5.3 Description of maintenance work..............................................110 6 Auxiliary single-sheave boom top 1.......................................................113 6.1 Operations planning................................................................113 6.1.1 Identification and slinging points...........................................113 6.1.2 Transport dimensions and weights.............................................114 6.1.3 Transport condition..........................................................114 6.2 Rigging work.......................................................................115 6.2.1 Moving the auxiliary single-sheave boom top into the working position........115 6.2.2 Moving the auxiliary single-sheave boom top into the transport position......117 6.2.3 Installing / removing a folded up auxiliary single-sheave boom top...........119 6.2.4 Attaching and removing the hoist rope........................................120 6.2.5 Installing / removing the lifting limit switch and anemometer................121 6.3 Operation with the auxiliary single-sheave boom top 1..............................123 6.3.1 Setting the RCL..............................................................123 6.3.2 Procedure if permissible wind speeds are exceeded............................124 6.3.3 Instructions for turning loads over..........................................124 6.4 Maintenance........................................................................125 6.4.3 Description of maintenance work..............................................126 7 Auxiliary single-sheave boom top2.......................................................129 7.1 Operations planning................................................................129 7.1.1 Identification and slinging points...........................................129 7.1.2 Transport dimensions and weights.............................................130 7.1.3 Transport condition..........................................................130 7.2 Rigging work.......................................................................131 7.2.1 Moving the auxiliary single-sheave boom top into the working position........131 7.2.2 Moving the auxiliary single-sheave boom top into the transport position......133 7.2.3 Installing/removing a folded up auxiliary single-sheave boomtop.............135 7.2.4 Attaching and removing the hoist rope........................................136 7.2.5 Lifting limit switch and anemometer..........................................137 7.3 Operation with the lattice extension 2.............................................139 7.3.1 Setting the RCL..............................................................139 7.3.2 Procedure if permissible wind speeds are exceeded............................140 7.3.3 Instructions for turning loads over..........................................140 7.4 Maintenance........................................................................141 7.4.3 Description of maintenance work..............................................142 8 Turning loads over.......................................................................145 8.1 Setting the RCL....................................................................146 8.2 Turning a load over................................................................147 9 Driving with a rigged crane..............................................................151 9.1 Safety instructions................................................................151 9.2 Driving path.......................................................................152 9.3 Permissible rigging modes and axle loads...........................................153 9.3.1 Swing-away lattice...........................................................154 9.3.2 Boom extension...............................................................162 9.3.3 Heavy load lattice extension 2.0m/10m (6.6ft/32.8ft).....................168 9.3.4 Heavy load lattice extension 4.1m/12.1m (13.5ft/39.7ft)..................174 9.3.5 Integral heavy load lattice extension........................................178 9.3.6 Auxiliary single-sheave boom top 1 and auxiliary single-sheave boom top 2....178 9.4 Before driving.....................................................................179 9.5 While driving......................................................................179 9.6 After driving......................................................................179 10 Index...................................................................................183 A......................................................................................185 B......................................................................................185 D......................................................................................185 H......................................................................................186 I......................................................................................187 L......................................................................................187 M......................................................................................187 O......................................................................................187 P......................................................................................187 S......................................................................................188 T......................................................................................188
Need help? Contact: [email protected]
https://vimeo.com/851901610?share=copy
PLEASE NOTE:
- This is the SAME exact manual used by your dealers to fix your vehicle.
- The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
- Any queries / doubts regarding your purchase, please feel free to contact [email protected]
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Grove GMK4075 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

Grove GMK 5130-1 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

Grove GMK4100 4100-L 5095 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

