★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302693 – PDF DOWNLOAD

$30.95

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302693 – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302693 – PDF DOWNLOAD

FILE DETAILS:

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302693 – PDF DOWNLOAD

Language : English
Pages : 524
Downloadable : Yes
File Type : PDF

DESCRIPTION:

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302693 – PDF DOWNLOAD

About these operating instructions:
1.1 Validity:

Validity of these operating instructions:

  • These operating instructions apply only to lattice extensions supplied by
    Manitowoc Crane Group Germany GmbH.
  • In addition, for the operation of the truck crane with a lattice extension described in these
    operating instructions, all details in the Operating manual GMK 5250L, supplied by the factory for
    the lattice extensions are applicable.

Prerequisites for assembly and operation:

The lattice extensions described in this operating manual may only be operated together with a
GROVE truck crane GMK 5250L whose serial number is identical with the serial number marked on the
lattice extensions.

References to other operating manuals:

  • Cross references to other operating or maintenance manuals are shown for instance in the following
    form: à Operating manual GMK5250L.
  • The subject that is referenced can be found in the index or table of contents
    of the document to which reference is made.

IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302693 – PDF DOWNLOAD

Lattice extension operating manual..............................................................................  1
Additional page – Fitting the hoist rope on auxiliary single-sheave boom top 1..................................  3
	Validity....................................................................................................  3
	Versions....................................................................................................  3
	Moving the rod..............................................................................................  4
1 About these operating instructions............................................................................ 35
	1.1 Validity................................................................................................ 35
	1.2 Terms used.............................................................................................. 37
2 Basic safety instructions..................................................................................... 39
	2.1 Other applicable documents.............................................................................. 39
	2.2 Safety instructions for working with a lattice extension................................................ 40
3 Operating elements............................................................................................ 41
	3.1 On the lattice extension................................................................................ 41
		3.1.1 Overview.......................................................................................... 41
		3.1.2 Hand-held control of the lattice extension........................................................ 42
		3.1.3 Connecting the lattice extension hand-held control................................................ 44
		3.1.4 Section2 control unit............................................................................ 45
	3.2 In the crane cab........................................................................................ 47
		3.2.1 Overview.......................................................................................... 47
		3.2.2 On the CCS control unit........................................................................... 48
		3.2.3 On the RCL control unit........................................................................... 51
		3.2.4 At the right of the control console............................................................... 52
	3.3 On the hand-held control................................................................................ 53
		3.3.1 Connecting hand-held control...................................................................... 55
4 Rigging work on the main boom................................................................................. 57
	4.1 Hose reel............................................................................................... 57
		4.1.1 Slinging points................................................................................... 57
		4.1.2 Transport dimensions and weights.................................................................. 58
	4.2 Rigging work on the hose reel........................................................................... 59
		4.2.1 Fitting / removing the hose reel.................................................................. 59
		4.2.2 Checking the rotation lock on the hose reel....................................................... 61
		4.2.3 Positions of the hydraulic connections.......................................................... 62
5 Swing-away lattice............................................................................................ 67
	5.1 Notes on this chapter................................................................................... 67
	5.2 Operations planning..................................................................................... 67
		5.2.1 Assembly.......................................................................................... 67
		5.2.2 Identification.................................................................................... 69
		5.2.3 Slinging points................................................................................... 70
		5.2.4 Transport dimensions and weights.................................................................. 72
		5.2.5 Transport condition – removed..................................................................... 74
		5.2.6 Transport condition – folded...................................................................... 77
	5.3 Checklists for rigging work............................................................................. 79
		5.3.1 Overview.......................................................................................... 79
		5.3.2 CHECKLIST: Installing the swing-away lattice – into the working position.......................... 81
		5.3.3 CHECKLIST: Installing the swing-away lattice – into the transport position........................ 89
		5.3.4 CHECKLIST: Removing the swing-away lattice – from the working position............................ 97
		5.3.5 CHECKLIST: Removing the swing-away lattice – from thetransport position..........................103
		5.3.6 CHECKLIST: Rigging the swing-away lattice 2 + 10.5 m – in the working position....................107
		5.3.7 CHECKLIST: Rigging the swing-away lattice 2 + 19.3 m – in the working position....................113
		5.3.8 CHECKLIST: Rigging the swing-away lattice 2 + 10.5 m – in the transport position..................119
		5.3.9 CHECKLIST: Rigging the swing-away lattice 2 + 19.3 m – in the transport position..................127
		5.3.10 CHECKLIST: Further rigging work..................................................................135
	5.4 Rigging work............................................................................................137
		5.4.1 Secure the swing-away lattice with guide rope.....................................................137
		5.4.2 Notes on the position of the telescoping cylinder.................................................138
		5.4.3 Extending/retracting the extension cylinder.......................................................139
		5.4.4 Extending/retracting the swivel ram...............................................................141
		5.4.5 Unlocking/locking the front connection............................................................143
		5.4.6 Unlock/lock the swivel ram........................................................................144
		5.4.7 Unlocking/locking the middle connection...........................................................145
		5.4.8 Locking/unlocking the rear connection.............................................................146
		5.4.9 Establishing/separating the rear connection.......................................................147
		5.4.10 Establishing/separating the slewing connection – mechanical locking..............................148
		5.4.11 Establishing/separating the slewing connection – mechanical locking..............................151
		5.4.12 Section4 / main boom – hydraulic locking........................................................152
		5.4.13 Section4 / main boom– mechanical locking........................................................155
		5.4.14 Establishing/separating connections between lattice extension sections – during installati.......156
		5.4.15 Section1/section2 - Establish/separate the right-hand connection...............................163
		5.4.16 Section1/section2 - Establish/separate the left-hand connection................................164
		5.4.17 Section1/section2 – Establish/separate the folded connection...................................165
		5.4.18 Swinging the swing-away lattice..................................................................167
		5.4.19 Slewing section1................................................................................168
		5.4.20 Establishing/disconnecting the hydraulic connections – Mainboom/swing-away lattice..............169
		5.4.21 Establishing/disconnecting electrical connections to the swing-away lattice......................171
		5.4.22 Folding deflection sheaves out/in................................................................185
		5.4.23 Attaching/removing the hoist rope................................................................188
		5.4.24 Installing / removing the lifting limit switch...................................................190
		5.4.25 Installing / removing the anemometer and air traffic control light...............................192
		5.4.26 Installing / removing the camera.................................................................194
		5.4.27 Main boom operation with a folded swing-away lattice – Necessary rigging work....................196
		5.4.28 Derricking the swing-away lattice for rigging work – hand-held control...........................199
		5.4.29 Set the swing-away lattice down on the rear connection...........................................200
		5.4.30 Derricking the swing-away lattice – Section2 control unit.......................................201
	5.5 Operation with swing-away lattice.......................................................................203
		5.5.1 Setting the RCL...................................................................................203
		5.5.2 Derricking the main boom..........................................................................204
		5.5.3 Telescoping with rigged swing-away lattice........................................................204
		5.5.4 Derricking the swing-away lattice in operation....................................................205
		5.5.5 Procedure if permissible wind speed is exceeded...................................................206
		5.5.6 Information about the main boom operation when the swing-away lattice is folded/rigged............207
		5.5.7 Instructions for turning loads over...............................................................208
	5.6 Maintenance.............................................................................................209
		5.6.5 Description of maintenance work...................................................................210
	5.7 Troubleshooting.........................................................................................217
		5.7.1 Troubleshooting table.............................................................................217
		5.7.2 Swing-away lattice emergency operation............................................................219
6 Boom extension................................................................................................223
	6.1 Notes on this chapter...................................................................................223
	6.2 Operations planning.....................................................................................224
		6.2.1 Assembly..........................................................................................224
		6.2.2 Identification....................................................................................225
		6.2.3 Slinging points...................................................................................226
		6.2.4 Transport dimensions and weights..................................................................227
		6.2.5 Transport condition...............................................................................227
	6.3 Checklists for rigging work.............................................................................228
		6.3.1 Overview..........................................................................................228
		6.3.2 CHECKLIST: Installing the boom extension..........................................................229
		6.3.3 CHECKLIST: Removing the boom extension............................................................233
	6.4 Description of the rigging work.........................................................................238
		6.4.1 Folding the deflection sheave out/in – section5..................................................238
		6.4.2 Installing/removing section5 at the main boom....................................................239
		6.4.3 Connecting/disconnecting the electrical connections – section5/main boom.........................240
		6.4.4 Connecting/disconnecting the hydraulic connections – section5/main boom..........................242
		6.4.5 Folding the deflection sheave out/in – section4..................................................243
		6.4.6 Folding the deflection sheave out/in – section2..................................................244
		6.4.7 Connecting/disconnecting the electrical connections – section4/section5.........................245
		6.4.8 Connecting/disconnecting the hydraulic connections – section4/section5..........................247
		6.4.9 Installing/removing the swing-away lattice on section5 – Hydraulic locking.......................248
		6.4.10 Installing/removing the swing-away lattice on section5 – Mechanical locking.....................251
		6.4.11 Positioning/removing the hoist rope – section5 up to section4..................................252
	6.5 Operation with boom extension...........................................................................253
		6.5.1 Setting the RCL...................................................................................253
		6.5.2 Derricking, telescoping the main boom.............................................................254
		6.5.3 Procedure if permissible wind speed is exceeded...................................................255
		6.5.4 Instructions for turning loads over...............................................................255
	6.6 Maintenance.............................................................................................256
		6.6.3 Description of maintenance work...................................................................257
7 Integral heavy load lattice extension (ISS) 4.1m/12.1m......................................................259
	7.1 Operations planning.....................................................................................260
		7.1.1 Assembly..........................................................................................260
		7.1.2 Identification....................................................................................261
		7.1.3 Slinging points...................................................................................262
		7.1.4 Transport dimensions and weights..................................................................263
		7.1.5 Transport condition...............................................................................263
	7.2 Checklists for rigging work.............................................................................265
		7.2.1 Overview..........................................................................................265
		7.2.2 CHECKLIST: Installing the ISS 4.1m...............................................................266
		7.2.3 CHECKLIST: Removing the ISS 4.1m.................................................................271
		7.2.4 CHECKLIST: Installing the ISS 12.1m..............................................................275
		7.2.5 CHECKLIST: Removing the ISS 12.1m................................................................281
	7.3 Rigging work............................................................................................287
		7.3.1 Breaking the connection – section4/swing-away lattice............................................287
		7.3.2 Installing section4 / removing it – hydraulic locking............................................289
		7.3.3 Installing section4 / removing it – mechanical locking...........................................292
		7.3.4 Making/breaking the electrical connections – section4 / main boom................................293
		7.3.5 Making/breaking the hydraulic connections – section4 / main boom.................................295
		7.3.6 Folding out / folding in the deflection sheave on section4.......................................296
		7.3.7 Folding out / folding in the head sheave on section4.............................................297
		7.3.8 Positioning/removing the hoist rope – section4...................................................298
		7.3.9 Possible reeving methods on the heavy load lattice extension......................................299
		7.3.10 Installing / removing the lifting limit switch...................................................301
		7.3.11 Installing / removing the anemometer and air traffic control light...............................302
		7.3.12 Installing / removing the camera.................................................................304
		7.3.13 Folding out / folding in the deflection sheave on section5......................................305
		7.3.14 Mounting section5 to the main boom / removing it from the main boom.............................306
		7.3.15 Making/breaking the electrical connections – section5 / main boom...............................307
		7.3.16 Making/breaking the hydraulic connections – section5 / main boom................................309
		7.3.17 Installing section4 on to section5 / removing it – hydraulic locking...........................310
		7.3.18 Installing section4 on to section5 / removing it – mechanical locking..........................313
		7.3.19 Making the electrical connections between section4 and section5................................314
		7.3.20 Making the hydraulic connection between section4 and section 5..................................316
		7.3.21 Positioning/removing the hoist rope – section5 and section4....................................317
	7.4 ISS, derricking.........................................................................................319
	7.5 Operation with the ISS..................................................................................321
		7.5.1 Setting the RCL...................................................................................321
		7.5.2 Derricking, telescoping the main boom.............................................................323
		7.5.3 Procedure if permissible wind speeds are exceeded.................................................324
		7.5.4 Instructions for turning loads over...............................................................324
	7.6 Maintenance.............................................................................................325
		7.6.1 Maintenance plan W................................................................................325
		7.6.2 Maintenance plan M 1..............................................................................325
		7.6.3 Maintenance plan M 3..............................................................................325
		7.6.4 Maintenance plan M12..............................................................................326
		7.6.5 Description of maintenance work...................................................................326
8 Heavy load lattice extension (SLS) 4.1 m/12.1 m...............................................................331
	8.1 Operations planning.....................................................................................331
		8.1.1 Assembly..........................................................................................331
		8.1.2 Identification....................................................................................333
		8.1.3 Slinging points...................................................................................334
		8.1.4 Transport dimensions and weights..................................................................335
		8.1.5 Transport condition...............................................................................335
	8.2 Checklists for rigging work.............................................................................337
		8.2.1 Overview..........................................................................................337
		8.2.2 CHECKLIST: Installing the heavy load lattice extension 4.1m......................................338
		8.2.3 CHECKLIST: Removing the heavy load lattice extension 4.1m........................................343
		8.2.4 CHECKLIST: Installing the heavy load lattice extension 12.1m.....................................347
		8.2.5 CHECKLIST: Removing the heavy load lattice extension 12.1m.......................................353
	8.3 Rigging work............................................................................................359
		8.3.1 Installing section4 on to the main boom / removing it – hydraulic locking........................359
		8.3.2 Installing section4 on to the main boom / removing it – mechanical locking.......................362
		8.3.3 Making/breaking the electrical connections – section4 / main boom................................363
		8.3.4 Making/breaking the hydraulic connections – section4 / main boom.................................365
		8.3.5 Folding out / folding in the deflection sheave on section4.......................................366
		8.3.6 Folding out / folding in the head sheave on section4.............................................367
		8.3.7 Positioning/removing the hoist rope – section4...................................................368
		8.3.8 Possible reeving methods on the heavy load lattice extension......................................369
		8.3.9 Installing / removing the lifting limit switch....................................................371
		8.3.10 Installing / removing the anemometer and air traffic control light...............................372
		8.3.11 Installing / removing the camera.................................................................374
		8.3.12 Folding out / folding in the deflection sheave on section5......................................375
		8.3.13 Mounting section5 to the main boom / removing it from the main boom.............................376
		8.3.14 Making/breaking the electrical connections – section5 / main boom...............................377
		8.3.15 Making/breaking the hydraulic connections – section5 / main boom................................379
		8.3.16 Installing section4 on to section5 / removing it – hydraulic locking...........................380
		8.3.17 Installing section4 on to section5 / removing it – mechanical locking..........................383
		8.3.18 Making the electrical connections between section4 and section5................................384
		8.3.19 Making the hydraulic connection between section4 and section5..................................386
		8.3.20 Positioning/removing the hoist rope – section5/section4........................................387
	8.4 Derricking the heavy load lattice extension.............................................................389
	8.5 Operating the heavy load lattice extension..............................................................391
		8.5.1 Setting the RCL...................................................................................391
		8.5.2 Derricking, telescoping the main boom.............................................................393
		8.5.3 Procedure if permissible wind speeds are exceeded.................................................394
		8.5.4 Instructions for turning loads over...............................................................394
	8.6 Maintenance.............................................................................................395
		8.6.5 Description of maintenance work...................................................................396
9 Heavy load lattice extension (SLS) 2.0 m/10.0 m...............................................................401
	9.1 Operations planning.....................................................................................401
		9.1.1 Assembly..........................................................................................401
		9.1.2 Identification....................................................................................402
		9.1.3 Slinging points...................................................................................403
		9.1.4 Transport dimensions and weights..................................................................404
		9.1.5 Transport condition...............................................................................405
	9.2 Checklists for rigging work.............................................................................407
		9.2.1 Overview..........................................................................................407
		9.2.2 CHECKLIST: SLS 2.0 m installation into the working position.......................................408
		9.2.3 CHECKLIST: SLS 2.0 m installation into the transport position.....................................411
		9.2.4 CHECKLIST: SLS 2.0 m removal from the working position............................................412
		9.2.5 CHECKLIST: SLS 2.0 m removal from the transport position..........................................415
		9.2.6 CHECKLIST: SLS 2.0 m rigging into the working position............................................417
		9.2.7 CHECKLIST: SLS 2.0 m rigging into the transport position..........................................420
		9.2.8 CHECKLIST: SLS 10.0 m installation................................................................423
		9.2.9 CHECKLIST: SLS 10.0 m removal.....................................................................427
	9.3 Rigging work............................................................................................431
		9.3.1 Mounting section 6 to the main boom / removing it from themain boom..............................431
		9.3.2 Moving section 6 into the working position / transport position:..................................434
		9.3.3 Making/breaking the electrical connections – section 6 / main boom................................436
		9.3.4 Installing / removing the deflection sheave – section 6...........................................438
		9.3.5 Positioning / removing the hoist rope – section 6.................................................439
		9.3.6 Possible reeving methods on the heavy load lattice extension......................................441
		9.3.7 Installing / removing the lifting limit switch....................................................443
		9.3.8 Setting the angle.................................................................................444
		9.3.9 Installing / removing the anemometer and air traffic control light................................445
		9.3.10 Installing / removing the camera.................................................................447
		9.3.11 Folding out / folding in the deflection sheave on section 5......................................448
		9.3.12 Mounting section 5 to the main boom / removing it from the main boom.............................449
		9.3.13 Making/breaking the electrical connections – section 5 / main boom...............................450
		9.3.14 Installing section 6 on to section 5 / removing it...............................................452
		9.3.15 Making the electrical connections between section 6 and section 5................................453
		9.3.16 Positioning / removing the hoist rope – section 5 and section 6..................................455
	9.4 Operating the heavy load lattice extension..............................................................457
		9.4.1 Setting the RCL...................................................................................457
		9.4.2 Derricking, telescoping the main boom.............................................................459
		9.4.3 Procedure if permissible wind speeds are exceeded.................................................460
		9.4.4 Instructions for turning loads over...............................................................460
	9.5 Maintenance.............................................................................................461
		9.5.3 Description of maintenance work...................................................................462
10 Auxiliary single-sheave boom top 1...........................................................................463
	10.1 Operations planning....................................................................................463
		10.1.1 Identification and slinging points...............................................................463
		10.1.2 Transport dimensions and weights.................................................................464
		10.1.3 Transport condition..............................................................................464
	10.2 Rigging work...........................................................................................465
		10.2.1 Moving the auxiliary single-sheave boom top into the working position............................465
		10.2.2 Moving the auxiliary single-sheave boom top into the transport position..........................467
		10.2.3 Installing / removing a folded up auxiliary single-sheave boom top...............................469
		10.2.4 Attaching and removing the hoist rope............................................................470
		10.2.5 Installing / removing the lifting limit switch and anemometer....................................471
	10.3 Operation with the auxiliary single-sheave boom top 1..................................................473
		10.3.1 Setting the RCL..................................................................................473
		10.3.2 Procedure if permissible wind speeds are exceeded................................................474
		10.3.3 Instructions for turning loads over..............................................................474
	10.4 Maintenance............................................................................................475
		10.4.3 Description of maintenance work..................................................................476
11 Auxiliary single-sheave boom top2...........................................................................477
	11.1 Operations planning....................................................................................477
		11.1.1 Identification and slinging points...............................................................477
		11.1.2 Transport dimensions and weights.................................................................478
		11.1.3 Transport condition..............................................................................478
	11.2 Rigging work...........................................................................................479
		11.2.1 Moving the auxiliary single-sheave boom top into the working position............................479
		11.2.2 Moving the auxiliary single-sheave boom top into the transport position..........................481
		11.2.3 Installing/removing a folded up auxiliary single-sheave boomtop.................................483
		11.2.4 Attaching and removing the hoist rope............................................................484
		11.2.5 Lifting limit switch and anemometer..............................................................485
	11.3 Operation with the lattice extension 2.................................................................487
		11.3.1 Setting the RCL..................................................................................487
		11.3.2 Procedure if permissible wind speeds are exceeded................................................488
		11.3.3 Instructions for turning loads over..............................................................488
	11.4 Maintenance............................................................................................489
		11.4.3 Description of maintenance work..................................................................490
12 Turning loads over...........................................................................................491
	12.1 Setting the RCL........................................................................................492
	12.2 Turning a load over....................................................................................493
13 Driving with a rigged crane..................................................................................495
	13.1 Safety instructions....................................................................................495
	13.2 Driving path...........................................................................................496
	13.3 Permissible rigging modes and axle loads...............................................................497
		13.3.1 Swing-away lattice...............................................................................498
		13.3.2 Boom extension...................................................................................502
		13.3.3 Heavy load lattice extension 2.0m/10m..........................................................505
		13.3.4 Heavy load lattice extension 4.1m/12.1m........................................................509
		13.3.5 Integral heavy load lattice extension............................................................511
		13.3.6 Auxiliary single-sheave boom top 1 and auxiliary single-sheave boom top 2........................511
	13.4 Before driving.........................................................................................512
	13.5 While driving..........................................................................................512
	13.6 After driving..........................................................................................512
14 Index........................................................................................................513
	A...........................................................................................................515
	B...........................................................................................................515
	C...........................................................................................................516
	D...........................................................................................................516
	H...........................................................................................................516
	I...........................................................................................................518
	L...........................................................................................................519
	M...........................................................................................................519
	O...........................................................................................................520
	P...........................................................................................................520
	S...........................................................................................................520
	T...........................................................................................................521

Need help? Contact: [email protected]

https://vimeo.com/851906824?share=copy

PLEASE NOTE:

  • This is not a physical manual but a digital manual – meaning no physical copy will be couriered to you. The manual can be yours in the next 2 mins as once you make the payment, you will be directed to the download page IMMEDIATELY.
  • This is the same manual used by the dealers inorder to diagnose your vehicle of its faults.
  • Require some other service manual or have any queries: please WRITE to us at [email protected]

S.V

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order