★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302933 – PDF DOWNLOAD

$30.95

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302933 – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302933 – PDF DOWNLOAD

FILE DETAILS:

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302933 – PDF DOWNLOAD

Language : English
Pages : 552
Downloadable : Yes
File Type : PDF

DESCRIPTION:

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302933 – PDF DOWNLOAD

About these operating instructions:
1.1 Validity:

Validity of these operating instructions:

  • These operating instructions apply only to lattice extensions supplied by
    Manitowoc Crane Group Germany GmbH.
  • In addition, for the operation of the truck crane with a lattice extension described in these
    operating instructions, all details in the Operating manual GMK 5250L, supplied by the factory for
    the lattice extensions are applicable.

Prerequisites for assembly and operation:

The lattice extensions described in this operating manual may only be operated together with a
GROVE truck crane GMK 5250L whose serial number is identical with the serial number marked on the
lattice extensions.

References to other operating manuals:

  • Cross references to other operating or maintenance manuals are shown for instance in the following
    form: à Operating manual GMK5250L.
  • The subject that is referenced can be found in the index or table of contents
    of the document to which reference is made.

IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:

Grove Crane GMK 5250L Lattice Extension Operating Manual 3302933 – PDF DOWNLOAD

1 About these operating instructions.................................................................................. 33
	1.1 Validity...................................................................................................... 33
	1.2 Terms used.................................................................................................... 35
2 Basic safety instructions........................................................................................... 37
	2.1 Other applicable documents.................................................................................... 37
	2.2 Safety instructions for working with a lattice extension...................................................... 38
3 Operating elements.................................................................................................. 39
	3.1 On the lattice extension...................................................................................... 39
		3.1.1 Overview................................................................................................ 39
		3.1.2 Hand-held control of the lattice extension.............................................................. 40
		3.1.3 Connecting the lattice extension hand-held control...................................................... 42
		3.1.4 Section 2 control unit.................................................................................. 43
	3.2 In the crane cab.............................................................................................. 45
		3.2.1 Overview................................................................................................ 45
		3.2.2 On the CCS control unit................................................................................. 46
		3.2.3 On the RCL control unit................................................................................. 49
		3.2.4 At the right of the control console..................................................................... 50
	3.3 On the hand-held control...................................................................................... 51
		3.3.1 Connecting hand-held control............................................................................ 53
4 Rigging work on the main boom....................................................................................... 55
	4.1 Hose reel..................................................................................................... 55
		4.1.1 Slinging points......................................................................................... 55
		4.1.2 Transport dimensions and weights........................................................................ 56
	4.2 Rigging work on the hose reel................................................................................. 57
		4.2.1 Fitting / removing the hose reel........................................................................ 57
		4.2.2 Checking the rotation lock on the hose reel............................................................. 59
		4.2.3 Positions of the hydraulic connections.................................................................. 60
5 Swing-away lattice.................................................................................................. 65
	5.1 Notes on this chapter......................................................................................... 65
	5.2 Operations planning........................................................................................... 65
		5.2.1 Assembly................................................................................................ 65
		5.2.2 Identification.......................................................................................... 67
		5.2.3 Slinging points......................................................................................... 68
		5.2.4 Transport dimensions and weights........................................................................ 70
		5.2.5 Transport condition – removed........................................................................... 72
		5.2.6 Transport condition – folded............................................................................ 75
	5.3 Checklists for rigging work................................................................................... 77
		5.3.1 Overview................................................................................................ 77
		5.3.2 CHECKLIST: Installing the swing-away lattice – into the operating position.............................. 79
		5.3.3 CHECKLIST: Installing the swing-away lattice – into the transport position.............................. 87
		5.3.4 CHECKLIST: Removing the swing-away lattice – from the operating position................................ 95
		5.3.5 CHECKLIST: Removing the swing-away lattice – from the transport position................................101
		5.3.6 CHECKLIST: Rigging the swing-away lattice 2 + 10.5 m (6.6 + 34.5 ft) – in the operating position........105
		5.3.7 CHECKLIST: Rigging the swing-away lattice 2 + 19.3 m (6.6 + 63.3 ft) – in the operating position........111
		5.3.8 CHECKLIST: Rigging the swing-away lattice 2 + 10.5 m (6.6 + 34.5 ft) – in the transport position........117
		5.3.9 CHECKLIST: Rigging the swing-away lattice 2 + 19.3 m (6.6 + 63.3 ft) – in the transport position........125
		5.3.10 CHECKLIST: Further rigging work........................................................................133
	5.4 Rigging work..................................................................................................135
		5.4.1 Securing the swing-away lattice components with guide rope..............................................135
		5.4.2 Notes on the position of the telescoping cylinder.......................................................136
		5.4.3 Extending/retracting the extension cylinder.............................................................137
		5.4.4 Extending/retracting the swivel ram.....................................................................139
		5.4.5 Unlocking/locking the front connection..................................................................141
		5.4.6 Swivel ram/section 4 – Establishing/separating the connection...........................................142
		5.4.7 Locking/unlocking the middle connection.................................................................143
		5.4.8 Securing/releasing the rear connection..................................................................144
		5.4.9 Establishing/separating the rear connection.............................................................145
		5.4.10 Establishing/separating the slewing connection – hydraulic locking.....................................146
		5.4.11 Establishing/separating the slewing connection – mechanical locking....................................149
		5.4.12 Section 4/ main boom – hydraulic locking...............................................................150
		5.4.13 Section 4/main boom– mechanical locking................................................................155
		5.4.14 Establishing/separating connections between lattice extension sections – during installing/removing....156
		5.4.15 Section 1/section 2 – Establishing/separating the right-hand connection................................163
		5.4.16 Section 1/section 2 – Establishing/separating the left-hand connection.................................164
		5.4.17 Section 1/section 2 – Establishing/separating the folded connection....................................165
		5.4.18 Swinging the swing-away lattice........................................................................167
		5.4.19 Swinging section 1.....................................................................................168
		5.4.20 Establishing/disconnecting the hydraulic connection....................................................169
		5.4.21 Establishing/disconnecting electrical connections to the swing-away lattice............................171
		5.4.22 Folding the deflection sheaves out/in..................................................................185
		5.4.23 Attaching/removing the hoist rope......................................................................188
		5.4.24 Installing/removing the lifting limit switch...........................................................190
		5.4.25 Installing/removing the anemometer and air traffic control light.......................................192
		5.4.26 Installing/removing the camera.........................................................................194
		5.4.27 Main boom operation with a folded swing-away lattice – Necessary rigging work..........................196
		5.4.28 Derricking the swing-away lattice for rigging work – hand-held control.................................199
		5.4.29 Setting the swing-away lattice down on the rear connection.............................................200
		5.4.30 Derricking the swing-away lattice – Section 2 control unit.............................................201
		5.4.31 Rigging work for driving with a dolly..................................................................202
	5.5 Operation with a swing-away lattice...........................................................................207
		5.5.1 Setting the RCL.........................................................................................207
		5.5.2 Derricking the main boom................................................................................208
		5.5.3 Telescoping with a rigged swing-away lattice............................................................208
		5.5.4 Derricking the swing-away lattice during operation......................................................209
		5.5.5 Procedure if the permissible wind speed is exceeded.....................................................210
		5.5.6 Information on the main boom operation when the swing-away lattice is folded/rigged.....................211
		5.5.7 Instructions for turning loads over.....................................................................212
	5.6 Maintenance...................................................................................................213
		5.6.1 Maintenance plan W......................................................................................213
		5.6.2 Maintenance plan M 1....................................................................................213
		5.6.3 Maintenance plan M 3....................................................................................214
		5.6.4 Maintenance plan M 12...................................................................................214
		5.6.5 Description of maintenance work.........................................................................214
	5.7 Finding and eliminating malfunctions..........................................................................221
		5.7.1 Troubleshooting table...................................................................................221
		5.7.2 Swinging the swing-away lattice in emergency operation..................................................223
6 Boom extension......................................................................................................227
	6.1 Notes on this chapter.........................................................................................227
	6.2 Operations planning...........................................................................................228
		6.2.1 Assembly................................................................................................228
		6.2.2 Identification..........................................................................................229
		6.2.3 Slinging points.........................................................................................230
		6.2.4 Transport dimensions and weights........................................................................231
		6.2.5 Transport condition.....................................................................................231
	6.3 Checklists for rigging work...................................................................................232
		6.3.1 Overview................................................................................................232
		6.3.2 CHECKLIST: Installing the boom extension................................................................233
		6.3.3 CHECKLIST: Removing the boom extension..................................................................237
	6.4 Description of the rigging work...............................................................................242
		6.4.1 Folding the deflection sheave out/in – section 5........................................................242
		6.4.2 Installing/removing section 5 at the main boom..........................................................243
		6.4.3 Connecting/disconnecting the electrical connections – section 5/main boom...............................244
		6.4.4 Connecting/disconnecting the hydraulic connections – section 5/main boom................................246
		6.4.5 Folding the deflection sheave out/in – section 4........................................................247
		6.4.6 Folding the deflection sheave out/in – section 2........................................................248
		6.4.7 Connecting/disconnecting the electrical connections – section 4/section 5...............................249
		6.4.8 Connecting/disconnecting the hydraulic connections – section 4/section 5................................251
		6.4.9 Installing/removing the swing-away lattice on section 5 – Hydraulic locking.............................252
		6.4.10 Installing/removing the swing-away lattice on section 5 – Mechanical locking...........................257
		6.4.11 Positioning/removing the hoist rope – section 5 up to section 4........................................258
	6.5 Operation with boom extension.................................................................................259
		6.5.1 Setting the RCL.........................................................................................259
		6.5.2 Derricking, telescoping the main boom...................................................................260
		6.5.3 Procedure if permissible wind speed is exceeded.........................................................261
		6.5.4 Instructions for turning loads over.....................................................................261
	6.6 Maintenance...................................................................................................262
		6.6.3 Description of maintenance work.........................................................................263
7 Integral heavy load lattice extension (ISS) 4.1 m/12.1 m (13.5 ft/39.7 ft)..........................................265
	7.1 Operations planning...........................................................................................266
		7.1.1 Assembly................................................................................................266
		7.1.2 Identification..........................................................................................267
		7.1.3 Slinging points.........................................................................................268
		7.1.4 Transport dimensions and weights........................................................................269
		7.1.5 Transport condition.....................................................................................269
	7.2 Checklists for rigging work...................................................................................271
		7.2.1 Overview................................................................................................271
		7.2.2 CHECKLIST: Installing the ISS 4.1 m (13.5 ft)...........................................................272
		7.2.3 CHECKLIST: Removing the ISS 4.1 m (13.5 ft).............................................................277
		7.2.4 CHECKLIST: Installing the ISS 12.1 m (39.7 ft)..........................................................281
		7.2.5 CHECKLIST: Removing the ISS 12.1 m (39.7 ft)............................................................287
	7.3 Rigging work..................................................................................................293
		7.3.1 Breaking the connection – section 4/swing-away lattice..................................................293
		7.3.2 Installing section 4 / removing it – hydraulic locking..................................................295
		7.3.3 Installing section 4 / removing it – mechanical locking.................................................300
		7.3.4 Making/breaking the electrical connections – section 4 / main boom......................................301
		7.3.5 Making/breaking the hydraulic connections – section 4 / main boom.......................................303
		7.3.6 Folding out / folding in the deflection sheave on section 4.............................................304
		7.3.7 Folding out / folding in the head sheave on section 4...................................................305
		7.3.8 Positioning/removing the hoist rope – section 4.........................................................306
		7.3.9 Possible reeving methods on the heavy load lattice extension............................................307
		7.3.10 Installing / removing the lifting limit switch.........................................................309
		7.3.11 Installing / removing the anemometer and air traffic control light.....................................310
		7.3.12 Installing / removing the camera.......................................................................312
		7.3.13 Folding out / folding in the deflection sheave on section 5............................................313
		7.3.14 Mounting section 5 to the main boom / removing it from the main boom...................................314
		7.3.15 Making/breaking the electrical connections – section 5 / main boom.....................................315
		7.3.16 Making/breaking the hydraulic connections – section 5 / main boom......................................317
		7.3.17 Installing section 4 on to section 5 / removing it – hydraulic locking.................................318
		7.3.18 Installing section 4 on to section 5 / removing it – mechanical locking................................323
		7.3.19 Making the electrical connections between section 4 and section 5......................................324
		7.3.20 Making the hydraulic connection between section 4 and section 5........................................326
		7.3.21 Positioning/removing the hoist rope – section 5 and section 4..........................................327
	7.4 ISS, derricking...............................................................................................329
	7.5 Operation with the ISS........................................................................................331
		7.5.1 Setting the RCL.........................................................................................331
		7.5.2 Derricking, telescoping the main boom...................................................................333
		7.5.3 Procedure if permissible wind speeds are exceeded.......................................................334
		7.5.4 Instructions for turning loads over.....................................................................334
	7.6 Maintenance...................................................................................................335
		7.6.1 Maintenance plan W......................................................................................335
		7.6.2 Maintenance plan M 1....................................................................................335
		7.6.3 Maintenance plan M 3....................................................................................335
		7.6.4 Maintenance plan M12....................................................................................336
		7.6.5 Description of maintenance work.........................................................................336
8 Heavy load lattice extension (SLS) 4.1 m/12.1 m (13.5 ft/39.7 ft)...................................................341
	8.1 Operations planning...........................................................................................341
		8.1.1 Assembly................................................................................................341
		8.1.2 Identification..........................................................................................343
		8.1.3 Slinging points.........................................................................................344
		8.1.4 Transport dimensions and weights........................................................................345
		8.1.5 Transport condition.....................................................................................345
	8.2 Checklists for rigging work...................................................................................347
		8.2.1 Overview................................................................................................347
		8.2.2 CHECKLIST: Installing the heavy load lattice extension 4.1 m (13.5 ft)..................................348
		8.2.3 CHECKLIST: Removing the heavy load lattice extension 4.1 m (13.5 ft)....................................353
		8.2.4 CHECKLIST: Installing the heavy load lattice extension 12.1 m (39.7 ft).................................357
		8.2.5 CHECKLIST: Removing the heavy load lattice extension 12.1 m (39.7 ft)...................................363
	8.3 Rigging work..................................................................................................369
		8.3.1 Installing section 4 on to the main boom / removing it – hydraulic locking..............................369
		8.3.2 Installing section 4 on to the main boom / removing it – mechanical locking.............................374
		8.3.3 Making/breaking the electrical connections – section 4 / main boom......................................375
		8.3.4 Making/breaking the hydraulic connections – section 4 / main boom.......................................377
		8.3.5 Folding out / folding in the deflection sheave on section 4.............................................378
		8.3.6 Folding out / folding in the head sheave on section 4...................................................379
		8.3.7 Positioning/removing the hoist rope – section 4.........................................................380
		8.3.8 Possible reeving methods on the heavy load lattice extension............................................381
		8.3.9 Installing / removing the lifting limit switch..........................................................383
		8.3.10 Installing / removing the anemometer and air traffic control light.....................................384
		8.3.11 Installing / removing the camera.......................................................................386
		8.3.12 Folding out / folding in the deflection sheave on section 5............................................387
		8.3.13 Mounting section 5 to the main boom / removing it from the main boom...................................388
		8.3.14 Making/breaking the electrical connections – section 5 / main boom.....................................389
		8.3.15 Making/breaking the hydraulic connections – section 5 / main boom......................................391
		8.3.16 Installing section 4 on to section 5 / removing it – hydraulic locking.................................392
		8.3.17 Installing section 4 on to section 5 / removing it – mechanical locking................................397
		8.3.18 Making the electrical connections between section 4 and section 5......................................398
		8.3.19 Making the hydraulic connection between section 4 and section 5........................................400
		8.3.20 Positioning/removing the hoist rope – section 5/section 4..............................................401
	8.4 Derricking the heavy load lattice extension...................................................................403
	8.5 Operating the heavy load lattice extension....................................................................405
		8.5.1 Setting the RCL.........................................................................................405
		8.5.2 Derricking, telescoping the main boom...................................................................407
		8.5.3 Procedure if permissible wind speeds are exceeded.......................................................408
		8.5.4 Instructions for turning loads over.....................................................................408
	8.6 Maintenance...................................................................................................409
		8.6.5 Description of maintenance work.........................................................................410
9 Heavy load lattice extension (SLS) 2.0 m/10.0 m (6.6 ft/32.8 ft)....................................................415
	9.1 Operations planning...........................................................................................415
		9.1.1 Assembly................................................................................................415
		9.1.2 Identification..........................................................................................416
		9.1.3 Slinging points.........................................................................................417
		9.1.4 Transport dimensions and weights........................................................................418
		9.1.5 Transport condition.....................................................................................419
	9.2 Checklists for rigging work...................................................................................421
		9.2.1 Overview................................................................................................421
		9.2.2 CHECKLIST: SLS 2.0 m (6.6 ft) installation into the working position....................................422
		9.2.3 CHECKLIST: SLS 2.0 m (6.6 ft) installation into the transport position..................................425
		9.2.4 CHECKLIST: SLS 2.0 m (6.6 ft) removal from the working position.........................................426
		9.2.5 CHECKLIST: SLS 2.0 m (6.6 ft) removal from the transport position.......................................429
		9.2.6 CHECKLIST: SLS 2.0 m (6.6 ft) rigging into the working position.........................................431
		9.2.7 CHECKLIST: SLS 2.0 m (6.6 ft) rigging into the transport position.......................................434
		9.2.8 CHECKLIST: SLS 10.0 m (32.8 ft) installation............................................................437
		9.2.9 CHECKLIST: SLS 10.0 m (32.8 ft) removal.................................................................441
	9.3 Rigging work..................................................................................................445
		9.3.1 Mounting section 6 to the main boom / removing it from the main boom....................................445
		9.3.2 Moving section 6 into the working position / transport position:........................................448
		9.3.3 Making/breaking the electrical connections – section 6 / main boom......................................450
		9.3.4 Installing / removing the deflection sheave – section 6.................................................452
		9.3.5 Positioning / removing the hoist rope – section 6.......................................................453
		9.3.6 Possible reeving methods on the heavy load lattice extension............................................455
		9.3.7 Installing / removing the lifting limit switch..........................................................457
		9.3.8 Setting the angle.......................................................................................458
		9.3.9 Installing / removing the anemometer and air traffic control light......................................459
		9.3.10 Installing / removing the camera.......................................................................461
		9.3.11 Folding out / folding in the deflection sheave on section 5............................................462
		9.3.12 Mounting section 5 to the main boom / removing it from the main boom...................................463
		9.3.13 Making/breaking the electrical connections – section 5 / main boom.....................................464
		9.3.14 Installing section 6 on to section 5 / removing it.....................................................466
		9.3.15 Making the electrical connections between section 6 and section 5......................................467
		9.3.16 Positioning / removing the hoist rope – section 5 and section 6........................................469
	9.4 Operating the heavy load lattice extension....................................................................471
		9.4.1 Setting the RCL.........................................................................................471
		9.4.2 Derricking, telescoping the main boom...................................................................473
		9.4.3 Procedure if permissible wind speeds are exceeded.......................................................474
		9.4.4 Instructions for turning loads over.....................................................................474
	9.5 Maintenance...................................................................................................475
		9.5.3 Description of maintenance work.........................................................................476
10 Auxiliary single-sheave boom top 1.................................................................................477
	10.1 Operations planning..........................................................................................477
		10.1.1 Identification and slinging points.....................................................................477
		10.1.2 Transport dimensions and weights.......................................................................478
		10.1.3 Transport condition....................................................................................478
	10.2 Rigging work.................................................................................................479
		10.2.1 Moving the auxiliary single-sheave boom top into the working position..................................479
		10.2.2 Moving the auxiliary single-sheave boom top into the transport position................................481
		10.2.3 Installing / removing a folded up auxiliary single-sheave boom top.....................................483
		10.2.4 Attaching and removing the hoist rope..................................................................485
		10.2.5 Installing / removing the lifting limit switch and anemometer..........................................487
	10.3 Operation with the auxiliary single-sheave boom top 1........................................................489
		10.3.1 Setting the RCL........................................................................................489
		10.3.2 Procedure if permissible wind speeds are exceeded......................................................490
		10.3.3 Instructions for turning loads over....................................................................490
	10.4 Maintenance..................................................................................................491
		10.4.3 Description of maintenance work........................................................................492
11 Auxiliary single-sheave boom top 2.................................................................................493
	11.1 Operations planning..........................................................................................493
		11.1.1 Identification and slinging points.....................................................................493
		11.1.2 Transport dimensions and weights.......................................................................494
		11.1.3 Transport condition....................................................................................494
	11.2 Rigging work.................................................................................................495
		11.2.1 Moving the auxiliary single-sheave boom top into the working position..................................495
		11.2.2 Moving the auxiliary single-sheave boom top into the transport position................................497
		11.2.3 Installing/removing a folded up auxiliary single-sheave boom top.......................................499
		11.2.4 Attaching and removing the hoist rope..................................................................500
		11.2.5 Lifting limit switch and anemometer....................................................................501
	11.3 Operation with the lattice extension 2.......................................................................503
		11.3.1 Setting the RCL........................................................................................503
		11.3.2 Procedure if permissible wind speeds are exceeded......................................................504
		11.3.3 Instructions for turning loads over....................................................................504
	11.4 Maintenance..................................................................................................505
		11.4.3 Description of maintenance work........................................................................506
12 Turning loads over.................................................................................................507
	12.1 Setting the RCL..............................................................................................508
	12.2 Turning a load over..........................................................................................509
13 Driving with a rigged crane........................................................................................511
	13.1 Safety instructions..........................................................................................511
	13.2 Driving path.................................................................................................512
	13.3 Permissible rigging modes and axle loads.....................................................................513
		13.3.1 Swing-away lattice.....................................................................................514
		13.3.2 Boom extension.........................................................................................522
		13.3.3 Heavy load lattice extension 2.0 m/10 m (6.6 ft/32.8 ft)...............................................528
		13.3.4 Heavy load lattice extension 4.1 m/12.1 m (13.5 ft/39.7 ft)............................................534
		13.3.5 Integral heavy load lattice extension..................................................................538
		13.3.6 Auxiliary single-sheave boom top 1 and auxiliary single-sheave boom top 2..............................538
	13.4 Before driving...............................................................................................539
	13.5 While driving................................................................................................539
	13.6 After driving................................................................................................539
14 Index..............................................................................................................541
	A.................................................................................................................543
	B.................................................................................................................543
	C.................................................................................................................544
	D.................................................................................................................544
	H.................................................................................................................544
	I.................................................................................................................546
	L.................................................................................................................547
	M.................................................................................................................547
	O.................................................................................................................548
	P.................................................................................................................548
	S.................................................................................................................548
	T.................................................................................................................550

Contact us: [email protected]

https://vimeo.com/851902640?share=copy

PLEASE NOTE:

  • This is the same manual used by the dealers to diagnose and troubleshoot your vehicle
  • You will be directed to the download page as soon as the purchase is completed. The whole payment and downloading process will take anywhere between 2-5 minutes
  • Need any other service / repair / parts manual, please feel free to contact [email protected] . We still have 50,000 manuals unlisted

S.V

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order