★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Grove Crane GMK 5250XL-1 Lattice extension Operating Manual – PDF DOWNLOAD

$28.95

Grove Crane GMK 5250XL-1 Lattice extension Operating Manual – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Grove Crane GMK 5250XL-1 Lattice extension Operating Manual – PDF DOWNLOAD

FILE DETAILS:

Grove Crane GMK 5250XL-1 Lattice extension Operating Manual – PDF DOWNLOAD

Language : English
Pages : 436
Downloadable : Yes
File Type : PDF

DESCRIPTION:

Grove Crane GMK 5250XL-1 Lattice extension Operating Manual – PDF DOWNLOAD

Overview:
Validity of this operating manual:
Validity of this operating manual
This operating manual applies only to lattice extensions supplied by Manitowoc Crane Group Germany GmbH.
Prerequisites for installation and operation:
The lattice extensions described in this operating manual may only be operated together with a GROVE truck crane GMK 5250XL-1 whose serial number is identical with the serial number marked on the lattice extensions.
References to other operating manuals:
Cross references to other operating or maintenance manuals are shown, for instance, in the form: àOperating manual GMK 5250XL-1.
• The subject that is referenced can be found in the index or table of contents of the document to which reference is made.
Safety instructions for working with a lattice extension:
This chapter contains additional safety instructions only for safe handling of the lattice extensions described in this operating manual.
Working at heights:
  • If there is a danger of falling working on the truck crane, suitable equipment must be used to prevent falling (e.g. ladder, lifting platform, auxiliary crane).
  • The lattice extensions are provided with holders for positioning a ladder. Place the ladder between the holders so that it cannot slip off.
  • If despite using such equipment the risk of falling cannot be minimised you must secure yourself and any assisting personnel by using fall arrest systems.
  • The points to which the fall arrest system can be attached on the truck crane are indicated by the symbol shown here.

IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:

Grove Crane GMK 5250XL-1 Lattice extension Operating Manual – PDF DOWNLOAD

Lattice extension operating manuals.....................................................................  1
	1 Overview.......................................................................................... 31
		Validity of this operating manual............................................................... 31
			Validity of this operating manual........................................................... 31
			Prerequisites for installation and operation................................................ 31
			References to other operating manuals....................................................... 31
		Lattice extension described..................................................................... 32
		Terms used...................................................................................... 34
			Lattice extension parts..................................................................... 34
			Additional equipment........................................................................ 35
	2 Basic safety instructions......................................................................... 37
		Other applicable documents...................................................................... 37
		Safety instructions for working with a lattice extension........................................ 38
			Working at heights.......................................................................... 38
			Slinging.................................................................................... 38
			Locks....................................................................................... 38
			Rigging mode................................................................................ 38
			Two cranes.................................................................................. 38
	3 Operating elements................................................................................ 39
		On the swing-away lattice....................................................................... 39
		In the crane cab................................................................................ 40
			Overview.................................................................................... 40
			At the control console, right............................................................... 41
			On the CCS control unit..................................................................... 41
				Menu with independent displays.......................................................... 41
				Enter rigging mode/ telescope status menu............................................... 42
		Other operating elements........................................................................ 43
			On the turntable............................................................................ 43
	4 Rigging work on the main boom..................................................................... 45
		Hose drum....................................................................................... 45
			Slinging points............................................................................. 45
			Dimensions and weights...................................................................... 46
		Rigging work on the hose drum................................................................... 47
			Installing/removing the hose drum........................................................... 47
				Removal................................................................................. 49
			Engaging/releasing the locking device on the hose drum...................................... 51
			Positions of the hydraulic connections...................................................... 52
				Working with the lattice extension...................................................... 52
				Main boom operation..................................................................... 53
	5 Swing-away lattice................................................................................ 55
		Swing-away lattice versions..................................................................... 55
		Operations planning............................................................................. 57
			Permissible combinations.................................................................... 57
			Dimensions and weights...................................................................... 58
			Identification.............................................................................. 60
		Transport conditions............................................................................ 61
			Overview.................................................................................... 61
			Transport conditions – Notes on checking.................................................... 63
			Transport conditions – Folded – Swing-away lattice 17.8 m................................... 65
			Transport condition – Folded – Section 1 only............................................... 69
			Transport condition – Removed – Swing-away lattice.......................................... 70
			Transport condition – Removed – Main boom................................................... 72
			Transport condition – Removed – Section 3................................................... 74
		Checklists for rigging work..................................................................... 75
			Symbols and their representation............................................................ 75
			Overview.................................................................................... 76
			CHECKLIST: Installation – In the working position........................................... 77
			CHECKLIST: Installation – In the transport position......................................... 82
			CHECKLIST: Removal – From the working position.............................................. 88
			CHECKLIST: Removal – From the transport position – Section 1................................ 93
			CHECKLIST: Removal – From the transport position – Swing-away lattice....................... 94
			CHECKLIST: Rigging in the working position – 11.2 m......................................... 96
			CHECKLIST: Rigging in the working position – 17.8 m.........................................100
			CHECKLIST: After rigging in the working position............................................105
			CHECKLIST: Before rigging in the transport position.........................................107
			CHECKLIST: Rigging in the transport position – 11.2 m.......................................109
			CHECKLIST: Rigging in the transport position – 17.8 m.......................................113
		Rigging work – General information..............................................................119
			Slinging points.............................................................................119
			Securing the swing-away lattice with the guide rope.........................................121
			Folding the run-up rail out/in..............................................................123
			Reeving the guide rope in the run-up rail...................................................124
			Section 2 – Folding the deflection sheaves in/out...........................................125
			Section 3 – Deflection sheaves – Transport position/ Working position.......................127
		Rigging work – Establishing/separating connections..............................................129
			Preparing the truck crane...................................................................129
			Overview of the rigging ranges..............................................................130
			Range 1 – Folded – Slewing connection.......................................................131
			Range 1 – Folded down – Main boom/Section 2.................................................132
			Range 1 – Folded down – Slewing connection..................................................134
			Range 1 – Installing/removing – Main boom/Section 2.........................................135
			Range 1 – Installation – Slewing connection.................................................138
			Range 2 – Folded – Main boom/Section 2......................................................139
				Establishing............................................................................139
				Disconnecting...........................................................................140
			Range 2 – Folded down/removed – Engage position.............................................141
			Range 3 – Installation/Removal – Section 2A/Section 2B......................................142
				Establishing............................................................................142
				Disconnecting...........................................................................144
			Range 3 – Installation/Removal – Section 2/Section 3........................................145
			Range 4 – Folded – Main boom/Section 1......................................................148
			Range 4 – Installation/Removal – Main boom/Section 1........................................149
			Range 5 – Folded – Section 1/Section 2......................................................151
			Range 5 – Folded down – Section 1/Section 2.................................................152
			Range 6 – Folded – Main boom/Section 1......................................................153
				Establishing............................................................................153
			Range 6 – Folded – Section 1/Section 2......................................................156
			Range 6 – Folded down – Section 1/Section 2.................................................157
			Range 6 – Installation/Removal – Section 1/Section 2........................................158
			Range 6 – Installation/Removal – Main boom/Section 1........................................160
			Relieving the connecting points.............................................................162
		Rigging work – Swinging operations..............................................................163
			Swing-away lattice – In front of the main boom..............................................163
			Swing-away lattice – At the main boom – In range 2..........................................164
			Swing-away lattice – At the main boom – In range 6..........................................165
			Section 1...................................................................................166
		Rigging work – Hydraulic connection.............................................................167
		Rigging work – Electrical connections...........................................................169
			Overview....................................................................................169
			Main boom/Section 2.........................................................................170
			Section 1 - Section 2.......................................................................172
			Section 2A/Section 2B.......................................................................174
			Section 2/Section 3.........................................................................176
				Section 3/ Section 2B...................................................................176
				Section 2A/ Section 3...................................................................178
		Further rigging work............................................................................181
			Fitting/removing the hoist rope.............................................................181
			Possible reeving methods....................................................................183
			Installing/removing the lifting limit switch................................................184
				Installation............................................................................184
				Removal.................................................................................185
			Installing/removing the anemometer and air traffic control light............................186
				Installation............................................................................186
				Removal.................................................................................187
			Installing/removing the camera..............................................................188
				Installation............................................................................188
				Removal.................................................................................189
		Rigging work – Derricking the swing-away lattice................................................191
			Display on the derricking cylinder..........................................................191
			With the hand-held control..................................................................192
			With the control unit on section 2..........................................................193
		Operation with swing-away lattice...............................................................195
			Setting the RCL.............................................................................195
				Input...................................................................................195
			Derricking the main boom....................................................................197
			Telescoping with a rigged swing-away lattice................................................197
			Derricking the swing-away lattice during operation..........................................198
				Switching on the derricking gear........................................................198
				Raising and lowering....................................................................198
				Switching off the derricking gear.......................................................199
			Checking the wind speed.....................................................................200
			Information on main boom operation when the swing-away lattice is installed.................201
			Instructions for turning loads over.........................................................202
		Maintenance.....................................................................................203
			Maintenance plan W..........................................................................203
			M 1 maintenance plan........................................................................203
			M 3 maintenance plan........................................................................203
			M 12 maintenance plan.......................................................................203
			Greasing the piston rod.....................................................................204
				Prerequisite............................................................................204
			Lubricating the pins........................................................................205
				Grease..................................................................................205
				Prerequisite............................................................................205
				Lubrication.............................................................................205
			Checking the sheaves........................................................................206
				Grease..................................................................................206
				Prerequisite............................................................................206
				Check...................................................................................206
			Lubricating joints..........................................................................207
				Grease..................................................................................207
			Lubricating the spring latch on the run-up rail.............................................208
				Grease..................................................................................208
		Troubleshooting.................................................................................209
			Troubleshooting table.......................................................................209
	6 Boom extension....................................................................................211
		Notes...........................................................................................211
		Operations planning.............................................................................213
			Permissible combinations....................................................................213
			Dimensions and weights......................................................................214
			Identification..............................................................................214
		Transport conditions............................................................................215
			Transport conditions – Notes on checking....................................................215
			Transport condition – Removed – Section 4...................................................216
		Checklists for rigging work.....................................................................217
			Symbols.....................................................................................217
			Overview....................................................................................217
			CHECKLIST: Installing.......................................................................218
			CHECKLIST: Removing.........................................................................223
		Rigging work – General information..............................................................227
			Slinging points.............................................................................227
			Securing with a guide rope..................................................................228
			Section 4 – Folding the deflection sheave in/out............................................229
			Section 2 – Folding the deflection sheaves in/out...........................................230
		Rigging work – Establishing/separating connections..............................................233
			Preparing the truck crane...................................................................233
			Main boom/section 4.........................................................................234
			Section 4/section 2.........................................................................236
			Section 2A/Section 2B.......................................................................238
				Establishing............................................................................238
				Disconnecting...........................................................................240
		Rigging work – Hydraulic connection.............................................................241
			Main boom/section 4.........................................................................241
			Section 4/section 2B........................................................................242
		Rigging work – Electrical connections...........................................................243
			Main boom/section 4.........................................................................243
			Section 4/section 2B........................................................................245
			Section 2A/Section 2B.......................................................................247
		Further rigging work............................................................................249
			Fitting/removing the hoist rope.............................................................249
		Operation with boom extension...................................................................251
			Setting the RCL.............................................................................251
				Input...................................................................................251
				Shutdown................................................................................252
			Derricking the main boom....................................................................253
			Telescoping with a rigged boom extension....................................................253
			Derricking the boom extension during operation..............................................254
			Checking the wind speed.....................................................................255
			Notes on main boom operation................................................................256
			Instructions for turning loads over.........................................................256
		Maintenance.....................................................................................256
		Troubleshooting.................................................................................257
			Troubleshooting table.......................................................................257
	7 Derricking heavy load lattice extension...........................................................259
		Notes...........................................................................................259
		Operations planning.............................................................................261
			Permissible combination.....................................................................261
			Dimensions and weights......................................................................262
			Identification..............................................................................263
		Transport conditions............................................................................265
			Transport conditions – Notes on checking....................................................265
			Transport condition – Folded................................................................266
			Transport condition – Removed – Section 2B..................................................267
			Transport condition – Removed – Section 4...................................................268
		Checklists for rigging work.....................................................................269
			Symbols.....................................................................................269
			Overview....................................................................................269
			CHECKLIST: Installation – 3.8 m.............................................................270
			CHECKLIST: Installation – 11.8 m............................................................273
			CHECKLIST: After installation...............................................................276
			CHECKLIST: Before removal...................................................................278
			CHECKLIST Removal – 3.8 m...................................................................279
			CHECKLIST Removal – 11.8 m..................................................................282
		Rigging work – General information..............................................................285
			Slinging points.............................................................................285
			Securing the heavy load lattice extension with a guide rope.................................286
			Folding the deflection sheaves out/in.......................................................287
			Folding the head sheave in/out..............................................................289
		Rigging work – Establishing / separating connections............................................291
			Preparing the truck crane...................................................................291
			Main boom / section 2B......................................................................292
			Main boom / section 4.......................................................................294
			Section 4 / section 2B......................................................................297
		Rigging work – Hydraulic connection.............................................................299
			Heavy load lattice extension 3.8 m..........................................................299
			Heavy load lattice extension 11.8 m.........................................................300
		Rigging work – Electrical connections...........................................................303
			Heavy load lattice extension 3.8 m..........................................................304
			Heavy load lattice extension 11.8 m.........................................................306
				Main boom / section 4...................................................................306
				Section 4 / section 2B..................................................................308
		Further rigging work............................................................................311
			Fitting / removing the hoist rope...........................................................311
				Removal.................................................................................312
			Notes for reeving and unreeving.............................................................313
			Possible reeving methods....................................................................314
			Installing/removing the lifting limit switch................................................315
			Installing/removing the anemometer and air traffic control light............................316
				Installing..............................................................................316
				Removing................................................................................316
			Installing/removing the camera..............................................................317
		Rigging work – Derricking the heavy load lattice extension......................................318
		Operation with heavy load lattice extension.....................................................319
			Setting the RCL.............................................................................319
				Input...................................................................................319
			Derricking the main boom....................................................................321
			Telescoping with a rigged heavy load lattice extension......................................321
			Derricking the heavy load lattice extension during operation................................322
				Switching on the derricking gear........................................................322
				Raising and lowering....................................................................322
				Switching off the derricking gear.......................................................323
			Checking the wind speed.....................................................................324
			Information about main boom operation when the heavy load lattice extension is installed....325
			Instructions for turning loads over.........................................................326
		Maintenance.....................................................................................327
			Maintenance plan W..........................................................................327
			M 1 maintenance plan........................................................................327
			M 3 maintenance plan........................................................................327
			M 12 maintenance plan.......................................................................327
			Greasing the piston rod.....................................................................328
				Prerequisite............................................................................328
			Lubricating the pins........................................................................329
				Grease..................................................................................329
				Prerequisite............................................................................329
				Lubrication.............................................................................329
			Checking the sheaves........................................................................330
				Prerequisite............................................................................330
				Check...................................................................................330
			Lubricating joints..........................................................................331
				Grease..................................................................................331
		Troubleshooting.................................................................................333
			Troubleshooting table.......................................................................333
	8 Auxiliary single-sheave boom top 1................................................................335
		Operations planning.............................................................................335
			Permissible combinations....................................................................335
			Dimensions and weights......................................................................336
			Identification..............................................................................336
		Transport conditions............................................................................337
			Transport conditions – Instructions for checking............................................337
			Transport condition – Folded................................................................339
			Transport condition – Removed...............................................................340
		Rigging work – General information..............................................................341
			Slinging points.............................................................................341
			Securing the auxiliary single-sheave boom top with a guide rope.............................342
		Rigging work – Installing/removing..............................................................343
			In the working position.....................................................................343
				Installing..............................................................................343
				Removing................................................................................345
			In transport position.......................................................................346
				Installing..............................................................................346
				Removing................................................................................347
		Rigging work – Changing the position of the auxiliary single-sheave boom top....................349
			From the working position to the transport position.........................................349
			From transport position to working position.................................................350
		Further rigging work............................................................................353
			Fitting/removing the hoist rope.............................................................353
			Possible reeving methods....................................................................354
			Installing/removing the lifting limit switch................................................355
				Installing..............................................................................355
				Removing................................................................................356
			Installing/removing the anemometer and air traffic control light............................357
			Installing/removing the camera..............................................................357
		Operation with auxiliary single-sheave boom top.................................................359
			Setting the RCL.............................................................................359
				Input...................................................................................359
				Shutdown................................................................................360
			Note on the maximum permissible load........................................................360
			Checking the wind speed.....................................................................361
			Instructions for turning loads over.........................................................362
		Maintenance.....................................................................................363
			M 1 maintenance plan........................................................................363
			M 3 maintenance plan........................................................................363
			Lubricating the pins........................................................................364
				Grease..................................................................................364
				Prerequisite............................................................................364
			Checking the sheaves........................................................................365
				Prerequisite............................................................................365
	9 Auxiliary single-sheave boom top 2................................................................367
		Operations planning.............................................................................367
			Permissible combinations....................................................................367
			Dimensions and weights......................................................................368
			Identification..............................................................................369
		Transport conditions............................................................................371
			Transport conditions – Notes on checking....................................................371
			Transport condition – Folded................................................................373
			Transport condition – Removed...............................................................374
		Rigging work – General information..............................................................375
			Slinging points.............................................................................375
			Securing the auxiliary single-sheave boom top with a guide rope.............................376
		Rigging work – Installing/removing..............................................................377
			In the working position.....................................................................377
				Installing..............................................................................377
				Removal.................................................................................379
			In the transport position...................................................................380
				Installing..............................................................................380
				Removal.................................................................................381
		Rigging work – Changing the position of the auxiliary single-sheave boom top....................383
			From the transport position to the working position.........................................383
			From the working position to the transport position.........................................385
		Further rigging work............................................................................386
			Folding the head sheave in/out..............................................................386
			Establishing/disconnecting electrical connections...........................................387
				Marker lights...........................................................................387
				Lifting limit switch....................................................................388
			Fitting/removing the hoist rope.............................................................389
			Possible reeving methods....................................................................390
			Installing/removing the lifting limit switch................................................391
			Installing/removing the anemometer and air traffic control light............................392
			Installing/removing the camera..............................................................392
		Operation with the auxiliary single-sheave boom top.............................................393
			Setting the RCL.............................................................................393
				Input...................................................................................393
				Shutdown................................................................................394
			Note on the maximum permissible load........................................................394
			Checking the wind speed.....................................................................395
			Instructions for turning loads over.........................................................396
		Maintenance.....................................................................................397
			M 1 maintenance plan........................................................................397
			M 3 maintenance plan........................................................................397
			Lubricating the pins........................................................................398
				Grease..................................................................................398
				Prerequisite............................................................................398
			Checking the sheaves........................................................................399
				Prerequisite............................................................................399
	10 Turning loads over...............................................................................401
		Prerequisites...................................................................................401
		Setting the RCL.................................................................................402
			Entering the reeving........................................................................402
			Switching over to the auxiliary hoist.......................................................402
		Turning a load over.............................................................................403
	11 Driving with a rigged crane......................................................................405
		Safety instructions.............................................................................405
		Driving distance................................................................................407
		Permissible rigging modes and axle loads........................................................408
			Notes.......................................................................................408
			Notes on the tables.........................................................................408
			Swing-away lattice..........................................................................410
				Swing-away lattice 11.2 m...............................................................410
				Swing-away lattice 17.8 m...............................................................412
				Swing-away lattice 25.8 m...............................................................413
			Derrickable heavy load lattice extension....................................................414
				Heavy load lattice extension 3.8 m......................................................414
				Heavy load lattice extension 11.8 m.....................................................416
			Boom extension..............................................................................418
				Boom extension 19.2 m...................................................................418
				Boom extension 25.8 m...................................................................419
				Boom extension 33.8 m...................................................................420
			Auxiliary single-sheave boom top 1 and auxiliary single-sheave boom top 2...................421
		Before driving..................................................................................423
		While driving...................................................................................423
		After driving...................................................................................423
	12 Index............................................................................................425
		A...............................................................................................427
		B...............................................................................................428
		D...............................................................................................429
		H...............................................................................................430
		I...............................................................................................430
		L...............................................................................................431
		O...............................................................................................431
		R...............................................................................................431
		S...............................................................................................431
		T...............................................................................................433

Need help? Contact: [email protected]

PLEASE NOTE:

  • This is the SAME MANUAL used by the dealerships to diagnose your vehicle
  • No waiting for couriers / posts as this is a PDF manual and you can download it within 2 minutes time once you make the payment.
  • Your payment is all safe and the delivery of the manual is INSTANT – You will be taken to the DOWNLOAD PAGE.
  • So have no hesitations whatsoever and write to us about any queries you may have : heydownloadss @gmail.com

S.V

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order