Grove Crane GMK 6300 Lattice Extension Operating Manual 3112447 – PDF DOWNLOAD
$28.95
Grove Crane GMK 6300 Lattice Extension Operating Manual 3112447 – PDF DOWNLOAD
Description
Grove Crane GMK 6300 Lattice Extension Operating Manual 3112447 – PDF DOWNLOAD
FILE DETAILS:
Grove Crane GMK 6300 Lattice Extension Operating Manual 3112447 – PDF DOWNLOAD
Language : English
Pages : 350
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:
Grove Crane GMK 6300 Lattice Extension Operating Manual 3112447 – PDF DOWNLOAD
Important information:
About this operating manual:
Validity of this operating manual:
- This operating manual only applies to lattice extensions which were deliver- ed by Deutsche GROVE
GmbH. - In addition, for the operation of the truck crane with a lattice extension des- cribed in this
operating manual, all details in the included Operating manual for GMK 6300 for which the lattice
extension was delivered from the factory, are applicable.
Prerequisites for assembly and operation:
The lattice extensions described in this operating manual may only be ope- rated together with a
GROVE truck crane GMK 6300 whose serial number is identical with the serial number that is marked
on the lattice extensions.
Safety instructions:
The operation of GMK 6300 with one of the lattice extensions described in this operating manual is
subject to:
– All the basic safety instructions to be found in the subsequent section Ba- sic safety
instructions and
– All the safety instructions contained in the supplied operating manual of
GMK 6300.
TABLE OF CONTENTS:
Grove Crane GMK 6300 Lattice Extension Operating Manual 3112447 – PDF DOWNLOAD
Lattice extension operating manual........................................................................... 1 Luffing jib correction sheet ................................................................................ 3 1 Luffing jib – Fall-back guard strut maintenance work................................................... 3 Invalidation of the description...................................................................... 3 1.1 Luffing control arm with fall-back guard strut................................................... 3 1.2 Maintenance interval for the fall-back guard strut............................................... 4 GROVE- Part numbers.............................................................................. 4 1.2.1 Visual inspection.......................................................................... 4 1.2.2 Pressure test.............................................................................. 4 1 Important information...................................................................................... 9 1.1 About this operating manual.......................................................................... 9 Validity of this operating manual.................................................................... 9 Prerequisites for assembly and operation............................................................. 9 Safety instructions................................................................................. 9 References to other operating manuals................................................................ 9 Alternative representations......................................................................... 10 1.2 Basic safety instructions............................................................................ 11 1.2.1 Warnings and symbols........................................................................... 11 1.3 Intended use......................................................................................... 12 1.4 Organisational measures.............................................................................. 14 1.5 Personnel qualifications............................................................................. 16 1.6 Safety instructions for working with the truck crane................................................. 17 1.7 Specifications in US standard units of measurement................................................... 19 1.7.1 Telescopic swing-away lattice extension........................................................ 19 1.7.2 Auxiliary single-sheave boom top............................................................... 19 1.7.3 Boom extension................................................................................. 20 1.7.4 Luffing jib.................................................................................... 20 1.7.5 Heavy load lattice extension................................................................... 20 2 Transport dimensions, weights and allocation of the lattice extension sections............................. 23 2.1 Transport dimensions and weights in metric units..................................................... 23 2.1.1 Telescopic swing-away lattice extension........................................................ 23 2.1.2 Auxiliary single-sheave boom top............................................................... 23 2.1.3 Boom extension................................................................................. 23 2.1.4 Luffing jib.................................................................................... 24 2.1.5 Heavy load lattice extension................................................................... 24 2.2 Transport dimensions and weights in US units......................................................... 25 2.2.1 Telescopic swing-away lattice extension........................................................ 25 2.2.2 Auxiliary single-sheave boom top............................................................... 25 2.2.3 Boom extension................................................................................. 25 2.2.4 Luffing jib.................................................................................... 26 2.2.5 Heavy load lattice extension................................................................... 26 2.3 Assignment of the parts to lattice extensions........................................................ 27 3 Telescopic swing-away lattice extension.................................................................... 31 3.1 Supplement to the operation of the GMK6300 with the telescopic swing-away lattice extension ........ 31 3.1.1 Changed prerequisite for telescoping........................................................... 31 3.1.2 Instructions for driving with the telescopic swing-away lattice extension mounted sideways..... 32 3.2 Additional operating and display elements in the driver's cab........................................ 33 3.2.1 Location of the additional operating and display elements...................................... 34 3.2.2 The functions of the additional operating and display elements................................. 35 3.3 Additional operating and display elements in the crane cab........................................... 37 3.3.1 Location of the additional operating and display elements...................................... 37 3.3.2 Function of the additional operating and display elements...................................... 38 3.4 Operating elements on the telescopic swing-away lattice extension................................... 39 3.4.1 Mobile switch unit............................................................................. 39 3.5 Components and identification........................................................................ 41 Components........................................................................................... 41 Identification....................................................................................... 41 Serial numbers on telescopic swing- away lattice extension........................................... 42 Serial number on adapter unit........................................................................ 42 3.6 Assembly of the lattice extensions................................................................... 43 3.7 Slinging points...................................................................................... 45 3.8 Checklists for rigging work.......................................................................... 47 3.8.1 Overview of the required rigging work.......................................................... 47 3.8.2 CHECKLIST: Mounting the telescopic swing-away lattice extension............................... 48 3.8.3 CHECKLIST: Removing the telescopic swing-away lattice extension............................... 49 3.8.4 CHECKLIST: Rigging the telescopic swing-away lattice extension................................ 50 3.8.5 CHECKLIST: Unrigging the telescopic swing-away lattice extension.............................. 55 3.9 Description of the rigging work...................................................................... 61 3.9.1 Preparing the truck crane for rigging.......................................................... 61 Prerequisites for rigging........................................................................ 61 Prerequisites for unrigging...................................................................... 61 3.9.2 Mounting/removing the adapter unit............................................................. 62 3.9.3 Checking driving/working with the main boom rigging modes...................................... 63 Rigging modes with lattice extension folded at the side.......................................... 65 3.9.4 Connections and positions with the lattice extension folded at the side........................ 66 Positions in the rear area....................................................................... 67 Connections in the middle area................................................................... 68 Connections in the front area.................................................................... 70 3.9.5 Pin connection to swing the lattice extension.................................................. 71 Creating a slewing connection.................................................................... 71 Releasing a slewing connection................................................................... 72 3.9.6 Swivelling the lattice extension when rigging.................................................. 73 Requirements for swivelling...................................................................... 73 When rigging..................................................................................... 73 When unrigging................................................................................... 73 3.9.7 Pin connections for working in lattice extension mode.......................................... 74 Align the lower bearing points................................................................... 75 3.9.8 Establishing/disconnecting the hydraulic connections........................................... 76 3.9.9 Electrical connection for rigging work......................................................... 77 3.9.10 Telescoping the lattice extension............................................................. 78 Inserting/releasing mechanical safety device..................................................... 78 Telescoping the lattice extension................................................................ 79 3.9.11 Adjusting the angle on the lattice extension.................................................. 80 Attaching the lattice extension to the hoist rope............................................... 80 Setting the angle................................................................................ 81 Required pin connections for the angle.......................................................... 82 3.9.12 Folding the deflection sheave out/in on the foot section...................................... 83 3.9.13 Placing and reeving the hoist rope............................................................ 84 Positioning the hoist rope....................................................................... 84 Reeving the hoist rope........................................................................... 85 3.9.14 Lifting limit switch on the lattice extension................................................. 86 Changing over the lifting limit switch........................................................... 86 Connecting the lifting limit switch.............................................................. 87 3.9.15 Anemometer on the lattice extension........................................................... 88 Changing over the anemometer..................................................................... 88 3.9.16 Transporting the lattice extension............................................................ 89 On a separate vehicle............................................................................ 89 Folded at the side............................................................................... 89 3.10 Working with the lattice extension.................................................................. 90 Working movements.................................................................................... 90 RCL shutdown......................................................................................... 90 Procedure if the permissible wind speed is exceeded.................................................. 90 3.10.1 Raising and setting down the main boom with rigged lattice extension.......................... 91 Raising.......................................................................................... 91 Setting down..................................................................................... 91 3.10.2 Telescoping with rigged lattice extension..................................................... 92 3.10.3 Swinging the lattice extension onto the run-up rail........................................... 93 Swinging outside the crane cab................................................................... 93 Swinging from the crane cab...................................................................... 94 3.11 Turning loads with the lattice extension............................................................ 95 3.11.1 Preconditions................................................................................. 95 3.11.2 Setting the RCL............................................................................... 96 Turning a load................................................................................... 97 3.12 Driving with rigged crane with a rigged lattice extension.......................................... 99 3.12.1 Driving path.................................................................................. 99 3.12.2 Position of the boom..........................................................................100 11 m telescopic swing-away lattice extension.....................................................101 19 m telescopic swing-away lattice extension.....................................................102 3.12.3 Driving the rigged crane......................................................................103 Lock the superstructure and engage the slewing gear holding brake................................103 Retracting the outriggers........................................................................103 Switching over the suspension locking system.....................................................103 Switching on the separate steering...............................................................104 Driving..........................................................................................104 Extending the outriggers........................................................................105 3.13 Malfunctions while working with the telescopic swingaway lattice extension.........................107 3.13.1 Malfunctions on the telescopic swing-away lattice extension...................................107 3.14 Maintenance plans...................................................................................109 3.14.1 Maintenance plan M1: monthly/after 100 oper. hrs.............................................109 3.14.2 Maintenance plan M3: every 3 months/after 300 oper. hrs......................................109 3.15 Lubrication chart...................................................................................111 3.16 Maintenance work....................................................................................113 3.16.1 Assemblies endangered by cleaning work........................................................113 3.16.2 Preparing the truck crane for maintenance work................................................114 3.16.3 Lubricating support rollers...................................................................115 3.16.4 Lubricating the tow chain and the gear chain..................................................116 Lubricating the gear chain.......................................................................117 Lubricating the tow chain........................................................................117 3.16.5 Tension in the tow chain and gear chain check, if required increase tension...................118 Checking tow chain tension.......................................................................119 Checking gear chain tension......................................................................119 Increasing tow chain tension.....................................................................120 Increasing gear chain tension....................................................................120 3.16.6 Lubricating the telescope slide faces.........................................................121 3.16.7 Adjusting the support roller for the telescopic section.......................................122 4 Auxiliary single-sheave boom top...........................................................................125 4.1 Slinging point.......................................................................................125 4.2 Description of the rigging work......................................................................127 4.2.1 Installing/removing auxiliary single-sheave boom top...........................................127 Installation.....................................................................................127 Removal..........................................................................................128 4.2.2 Rigging the auxiliary single-sheave boom top...................................................129 Rigging in transport position....................................................................129 Rigging in working position......................................................................129 4.3 Reeving the hoist rope...............................................................................131 Positioning the hoist rope...........................................................................131 Possible reeving methods on the auxiliary single- sheave boom top....................................131 4.4 Connecting the lifting limit switch and anemometer...................................................133 Connecting the lifting limit switch..................................................................133 Connecting the anemometer...........................................................................133 4.5 Turning loads with the auxiliary single-sheave boom top..............................................135 Preconditions........................................................................................135 Setting the RCL......................................................................................136 Turning a load.......................................................................................137 5 Boom extension.............................................................................................141 5.1 Components and identification........................................................................141 Components...........................................................................................141 Identification.......................................................................................141 Foot section.........................................................................................142 Intermediate sections...............................................................................142 Head.................................................................................................143 Angle piece..........................................................................................143 5.2 Possible combinations................................................................................145 5.3 Slinging points......................................................................................147 5.4 Rigging the boom extension...........................................................................149 5.4.1 CHECKLIST: Rigging the boom extension..........................................................149 5.4.2 CHECKLIST: Unrigging the boom extension........................................................152 5.5 Description of the rigging work......................................................................155 5.5.1 Truck crane rigging mode during installation of the boom extension.............................155 5.5.2 Handling the pins..............................................................................156 5.5.3 Installing/removing the foot section...........................................................157 Installation.....................................................................................157 Removal..........................................................................................157 5.5.4 Installing/removing the boom extension sections................................................158 Checks before installation/removal...............................................................158 Connecting pins..................................................................................158 Installing.......................................................................................159 Removing.........................................................................................159 5.5.5 Transport pins.................................................................................161 5.5.6 Angle piece....................................................................................162 Inclining the angle piece to 25.................................................................163 Angle section at a3 angle......................................................................163 5.5.7 Changing over the lifting limit switch and anemometer..........................................164 5.5.8 Establishing/disconnecting the electrical connection...........................................165 Connecting cable.................................................................................165 Establishing aconnection........................................................................166 Disconnecting theconnection.....................................................................167 5.5.9 Reeving the hoist rope.........................................................................168 Possible reeving methods.........................................................................170 5.6 Driving with rigged crane and rigged boom extension..................................................173 5.6.1 Driving path...................................................................................173 5.6.2 Position of the boom...........................................................................174 19 m boom extension.............................................................................175 27 m boom extension.............................................................................176 35 m boom extension.............................................................................177 43 m boom extension.............................................................................178 51 m boom extension.............................................................................179 5.6.3 Driving the rigged crane.......................................................................180 Lock the superstructure and engage the slewing gear holding brake................................180 Retracting the outriggers........................................................................180 Switching over the suspension locking system.....................................................180 Driving..........................................................................................181 Extending the outriggers........................................................................181 5.7 Operation with boom extension........................................................................183 Crane movements......................................................................................184 RCL Shutdown.........................................................................................184 Effect of wind when operating the boom extension.....................................................185 5.7.1 Telescoping with rigged boom extension.........................................................186 5.8 Maintenance plans....................................................................................187 5.8.1 Maintenance plan M1: monthly/after 100 oper. hrs..............................................187 5.9 Lubrication chart....................................................................................189 5.10 Maintenance work....................................................................................191 5.10.1 Lubricating the fall-back guard...............................................................191 5.10.2 Lubricating connecting pins...................................................................191 6 Luffing jib................................................................................................195 6.1 Additional operating and display elements in the crane cab...........................................195 6.1.1 Position of the additional operating and display elements......................................196 6.1.2 Function of the additional operating and display elements......................................198 6.2 Components and identification........................................................................201 Components...........................................................................................201 Identification.......................................................................................201 Foot section.........................................................................................202 Intermediate sections and guy piece.................................................................202 Head.................................................................................................203 Luffing control arm..................................................................................203 6.3 Possible combinations................................................................................205 6.4 Slinging points......................................................................................207 6.5 Rigging the luffing jib..............................................................................209 6.5.1 CHECKLIST: Rigging luffing jib.................................................................209 6.5.2 CHECKLIST: Removing the luffing jib............................................................214 6.6 Description of the rigging work......................................................................219 6.6.1 Rigging mode of the truck crane when mounting the luffing jib..................................219 6.6.2 Installing/removing the luffing control arm....................................................220 Installing luffing control arm...................................................................220 Removal..........................................................................................221 6.6.3 Rigging/unrigging fall-back guard strut........................................................223 When rigging.....................................................................................223 When unrigging...................................................................................224 6.6.4 Handling the pins..............................................................................225 6.6.5 Installing/removing the foot section...........................................................226 Installation.....................................................................................226 Removal..........................................................................................226 6.6.6 Raising/setting down the luffing control arm...................................................227 Raising the luffing jib..........................................................................227 Setting down the luffing control arm.............................................................228 Raising/folding in the railing...................................................................228 6.6.7 Preparing the upper hook block for rigging.....................................................229 Before mounting the foot section.................................................................229 After mounting the foot section..................................................................229 6.6.8 Fasten the upper hook block on the luffing control arm.........................................230 6.6.9 Removing the upper hook block from the luffing control arm.....................................232 6.6.10 Installing/removing boom sections and rear pendant links......................................234 Connecting pins..................................................................................234 Installing.......................................................................................234 Removing.........................................................................................236 Rear pendant link transport protection...........................................................238 6.6.11 Removing/inserting the transport pins.........................................................240 Removing the transport pins......................................................................240 Inserting transport pins........................................................................241 6.6.12 Moving the lifting limit switch and anemometer................................................242 Changing over the anemometer.....................................................................242 Connecting the lifting limit switch and anemometer...............................................242 Locking the lifting limit switch.................................................................243 Releasing locking................................................................................244 6.6.13 Establishing/disconnecting the electrical connection..........................................244 RCL connecting cable.............................................................................244 Establishing aconnection........................................................................245 Disconnecting the connection.....................................................................246 6.6.14 Reeving the hoist rope........................................................................247 Possible reeving methods.........................................................................249 6.6.15 Telescoping with the luffing jib..............................................................251 Telescoping when using the rigged 21m luffing jib...............................................254 6.6.16 Derricking luffing jib when rigging...........................................................255 6.6.17 Derricking main boom with installed luffing jib...............................................257 Derricking between –1.5 to 82..................................................................257 Derricking between 70and82...................................................................257 6.6.18 Putting the luffing jib into working position.................................................258 Raise the luffing jib............................................................................258 Telescoping to fixed length......................................................................261 Entering working position........................................................................261 6.6.19 Preparing the luffing jib for unrigging.......................................................262 6.6.20 Checking the shutdown angles..................................................................266 Initial position.................................................................................266 Checking the shutdown angles....................................................................267 6.7 Operating with the luffing jib.......................................................................271 6.7.1 Maximum permitted slewing speed................................................................272 6.7.2 Crane movements................................................................................273 6.7.3 Working range and shutdowns....................................................................274 6.7.4 RCL shutdown...................................................................................275 The effect of wind when operating with the luffing jib...........................................276 6.7.5 Malfunctions when working with theluffing jib.................................................277 6.8 Driving with rigged crane and rigged luffing jib.....................................................279 6.8.1 Driving path...................................................................................279 6.8.2 Position of the boom...........................................................................280 21 m luffing jib.................................................................................281 29 m luffing jib.................................................................................282 37 m luffing jib.................................................................................283 45 m luffing jib.................................................................................284 53 m luffing jib.................................................................................285 61 m luffing jib.................................................................................286 6.8.3 Driving the rigged crane.......................................................................287 Lock the superstructure and engage the slewing gear holding brake................................287 Retracting the outriggers........................................................................287 Switching over the suspension locking system.....................................................287 Extending the outriggers........................................................................288 6.9 Maintenance plans....................................................................................289 6.9.1 Maintenance plan M1: monthly/after 100 oper. hrs..............................................289 6.9.2 Maintenance plan M6: every six monthly/after 500 oper. hrs....................................289 6.10 Lubrication chart...................................................................................291 6.11 Maintenance work....................................................................................293 6.11.1 Lubricating the fall-back guard...............................................................293 6.11.2 Lubricating connecting pins...................................................................293 6.11.3 Checking the nitrogen and oil pressure in the fall-back guard strut...........................294 Test connections.................................................................................294 Nitrogen pressure................................................................................295 Oil pressure.....................................................................................297 7 Heavy load lattice extension...............................................................................301 7.1 Components and identification........................................................................301 7.2 Possible combinations................................................................................303 7.3 Slinging points......................................................................................305 7.4 Rigging the heavy load lattice extension.............................................................307 7.4.1 CHECKLIST: Rigging the heavy load lattice extension............................................307 7.4.2 CHECKLIST: Unrigging the heavy load lattice extension..........................................309 7.5 Description of the rigging work......................................................................311 7.5.1 Truck crane rigging mode during installation of the heavy load lattice extension...............311 7.5.2 Handling the pins..............................................................................312 7.5.3 Installing/removing heavy load lattice extension sections......................................312 Connecting pins..................................................................................312 Installing.......................................................................................313 Removing.........................................................................................314 7.5.4 Angle piece....................................................................................315 Inclining the angle piece to 40.................................................................316 Angle section at a18 angle.....................................................................316 7.5.5 Moving the lifting limit switch and anemometer.................................................317 Connecting the lifting limit switch and anemometer...............................................318 7.5.6 Establishing/disconnecting the electrical connection...........................................318 Connecting cable.................................................................................318 Establishing connection.........................................................................319 Disconnecting the connection.....................................................................320 7.5.7 Reeving the hoist rope.........................................................................321 Possible reeving methods on the heavy load lattice extension.....................................323 7.6 Operating the heavy load lattice extension...........................................................325 Telescoping with rigged heavy load lattice extension.................................................325 7.6.1 Crane movements................................................................................326 RCL shutdown.....................................................................................326 Effect of wind when operating the heavy load lattice extension..................................327 7.7 Turning loads with the heavy load lattice extension..................................................329 Preconditions........................................................................................329 Setting the RCL......................................................................................330 Turning a load.......................................................................................331 7.8 Driving with a rigged crane and rigged heavy load lattice extension.................................333 7.8.1 Driving path...................................................................................333 7.8.2 Position of the boom...........................................................................334 Heavy load lattice extension 3.5m...............................................................335 Heavy load lattice extension 7.0m...............................................................336 7.8.3 Driving the rigged crane.......................................................................337 Lock the superstructure and engage the slewing gear holding brake................................337 Retracting the outriggers........................................................................337 Switching over the suspension locking system.....................................................337 Switching on the separate steering...............................................................338 Driving..........................................................................................338 Extending the outriggers........................................................................339 8 Index......................................................................................................343 A........................................................................................................345 B........................................................................................................345 C........................................................................................................345 D........................................................................................................345 E........................................................................................................345 F........................................................................................................346 H........................................................................................................346 I........................................................................................................346 L........................................................................................................346 M........................................................................................................346 O........................................................................................................347 P........................................................................................................347 R........................................................................................................347 S........................................................................................................347 T........................................................................................................348 U........................................................................................................348
Customer Support: [email protected]
PLEASE NOTE:
- This is the SAME MANUAL used by the dealerships to diagnose your vehicle
- No waiting for couriers / posts as this is a PDF manual and you can download it within 2 minutes time once you make the payment.
- Your payment is all safe and the delivery of the manual is INSTANT – You will be taken to the DOWNLOAD PAGE.
- So have no hesitations whatsoever and write to us about any queries you may have : heydownloadss @gmail.com
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Grove GMK 6200-1 Operating Instructions Manual Part 1 (Carrier) - PDF DOWNLOAD

Grove Crane GMK 5100 Operating Instructions Manual Part 1 (Carrier) - PDF DOWNLOAD

Grove GMK5100 Operating Instructions Working Range Limiter Manual
