π’
Trusted Business
Verified & Licensed
π‘οΈ
Virus Free Files
100% Safe Downloads
π
Secure Payment
SSL Protected
β‘
Instant Delivery
Available Immediately
Grove Crane GMK 6300 Lattice Extension Operating Manual SN 3112446 – PDF DOWNLOAD
$28.95
Grove Crane GMK 6300 Lattice Extension Operating Manual SN 3112446 – PDF DOWNLOAD
Category: Grove
Tags: Grove Crane GMK 6300 Lattice Extension Operating, Grove Crane GMK 6300 Lattice Extension Operating Manual SN 3112446, Grove Crane GMK 6300 Lattice Extension Operating Manual SN 3112446 - PDF DOWNLOAD
Vendor: Bolt And Nut Manuals
β‘
Instant PDF Download
Available immediately
πΎ
Save to Your Device
Download & keep forever
π‘οΈ
Antivirus Scanned
100% virus-free
π
Trusted Worldwide
175,000+ customers
Description
Grove Crane GMK 6300 Lattice Extension Operating Manual SN 3112446 – PDF DOWNLOAD
FILE DETAILS:
Grove Crane GMK 6300 Lattice Extension Operating Manual SN 3112446 – PDF DOWNLOAD
Language : English
Pages : 346
Downloadable : Yes
File Type : PDF
DESCRIPTION:
Grove Crane GMK 6300 Lattice Extension Operating Manual SN 3112446 – PDF DOWNLOAD
About this operating manual:
All the lattice extensions described in the operating manual can be obtained as additional equipment.
Validity of this operating manual:
This operating manual only applies to lattice extensions which were delivered by Deutsche GROVE GmbH.
In addition, for the operation of the truck crane with a lattice extension described in this operating manual, all details in the included Operating manual for GMK 6300 for which the lattice extension was delivered from the factory, are applicable.
Validity of this operating manual:
This operating manual only applies to lattice extensions which were delivered by Deutsche GROVE GmbH.
In addition, for the operation of the truck crane with a lattice extension described in this operating manual, all details in the included Operating manual for GMK 6300 for which the lattice extension was delivered from the factory, are applicable.
Prerequisites for assembly and operation:
The lattice extensions described in this operating manual may only be operated together with a GROVE truck crane GMK 6300 whose serial number is identical with the serial number that is marked on the lattice extensions.
Safety instructions:
The operation of GMK 6300 with one of the lattice extensions described in this operating manual is subject to:
β All the basic safety instructions to be found in the subsequent section Basic safety instructions and
β All the safety instructions contained in the supplied operating manual of GMK 6300.
Safety instructions:
The operation of GMK 6300 with one of the lattice extensions described in this operating manual is subject to:
β All the basic safety instructions to be found in the subsequent section Basic safety instructions and
β All the safety instructions contained in the supplied operating manual of GMK 6300.
IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:
Grove Crane GMK 6300 Lattice Extension Operating Manual SN 3112446 – PDF DOWNLOAD
1 Important information...................................................................................... 7 1.1 About this operating manual.......................................................................... 7 Validity of this operating manual.................................................................... 7 Prerequisites for assembly and operation............................................................. 7 Safety instructions................................................................................. 7 References to other operating manuals................................................................ 7 Alternative representations......................................................................... 8 1.2 Basic safety instructions............................................................................ 9 1.2.1 Warnings and symbols........................................................................... 9 1.3 Intended use......................................................................................... 10 1.4 Organisational measures.............................................................................. 12 1.5 Personnel qualifications............................................................................. 14 1.6 Safety instructions for working with the truck crane................................................. 15 2 Transport dimensions, weights and allocation of the lattice extension sections............................. 19 2.1 Transport dimensions and weights in metric units..................................................... 19 2.1.1 Telescopic swing-away lattice extension........................................................ 19 2.1.2 Auxiliary single-sheave boom top............................................................... 19 2.1.3 Boom extension................................................................................. 20 2.1.4 Luffing jib.................................................................................... 20 2.1.5 Heavy load lattice extension................................................................... 21 2.2 Assignment of the parts to lattice extensions........................................................ 23 3 Telescopic swing-away lattice extension.................................................................... 27 3.1 Supplement to the operation of the GMK6300 with the telescopic swing-away lattice extension ........ 27 3.1.1 Changed prerequisite for telescoping........................................................... 27 3.1.2 Instructions for driving with the telescopic swing-away lattice extension mounted sideways..... 28 3.2 Additional operating and display elements in the driver's cab........................................ 29 3.2.1 Location of the additional operating and display elements...................................... 30 3.2.2 The functions of the additional operating and display elements................................. 31 3.3 Additional operating and display elements in the crane cab........................................... 33 3.3.1 Location of the additional operating and display elements...................................... 33 3.3.2 Function of the additional operating and display elements...................................... 34 3.4 Operating elements on the telescopic swing-away lattice extension................................... 35 3.4.1 Mobile switch unit............................................................................. 35 3.5 Components and identification........................................................................ 37 Components........................................................................................... 37 Identification....................................................................................... 37 Serial numbers on telescopic swing- away lattice extension........................................... 38 Serial number on adapter unit........................................................................ 38 3.6 Assembly of the lattice extensions................................................................... 39 3.7 Slinging points...................................................................................... 41 3.8 Checklists for rigging work.......................................................................... 43 3.8.1 Overview of the required rigging work.......................................................... 43 3.8.2 CHECKLIST: Mounting the telescopic swing-away lattice extension............................... 44 3.8.3 CHECKLIST: Removing the telescopic swing-away lattice extension............................... 45 3.8.4 CHECKLIST: Rigging the telescopic swing-away lattice extension................................ 46 3.8.5 CHECKLIST: Unrigging the telescopic swing-away lattice extension.............................. 51 3.9 Description of the rigging work...................................................................... 57 3.9.1 Preparing the truck crane for rigging.......................................................... 57 Prerequisites for rigging........................................................................ 57 Prerequisites for unrigging...................................................................... 57 3.9.2 Mounting/removing the adapter unit............................................................. 58 3.9.3 Checking driving/working with the main boom rigging modes...................................... 59 Rigging modes with lattice extension folded at the side.......................................... 61 3.9.4 Connections and positions with the lattice extension folded at the side........................ 62 Positions in the rear area....................................................................... 63 Connections in the middle area................................................................... 64 Connections in the front area.................................................................... 66 3.9.5 Pin connection to swing the lattice extension.................................................. 67 Creating a slewing connection.................................................................... 67 Releasing a slewing connection................................................................... 68 3.9.6 Swivelling the lattice extension when rigging.................................................. 69 Requirements for swivelling...................................................................... 69 When rigging..................................................................................... 69 When unrigging................................................................................... 69 3.9.7 Pin connections for working in lattice extension mode.......................................... 70 Align the lower bearing points................................................................... 71 3.9.8 Establishing/disconnecting the hydraulic connections........................................... 72 3.9.9 Electrical connection for rigging work......................................................... 73 3.9.10 Telescoping the lattice extension............................................................. 74 Inserting/releasing mechanical safety device..................................................... 74 Telescoping the lattice extension................................................................ 75 3.9.11 Adjusting the angle on the lattice extension.................................................. 76 Attaching the lattice extension to the hoist rope............................................... 76 Setting the angle................................................................................ 77 Required pin connections for the angle.......................................................... 78 3.9.12 Folding the deflection sheave out/in on the foot section...................................... 79 3.9.13 Placing and reeving the hoist rope............................................................ 80 Positioning the hoist rope....................................................................... 80 Reeving the hoist rope........................................................................... 81 3.9.14 Lifting limit switch on the lattice extension................................................. 82 Changing over the lifting limit switch........................................................... 82 Connecting the lifting limit switch.............................................................. 83 3.9.15 Anemometer on the lattice extension........................................................... 84 Changing over the anemometer..................................................................... 84 3.9.16 Transporting the lattice extension............................................................ 85 On a separate vehicle............................................................................ 85 Folded at the side............................................................................... 85 3.10 Working with the lattice extension.................................................................. 86 Working movements.................................................................................... 86 RCL shutdown......................................................................................... 86 Procedure if the permissible wind speed is exceeded.................................................. 86 3.10.1 Raising and setting down the main boom with rigged lattice extension.......................... 87 Raising.......................................................................................... 87 Setting down..................................................................................... 87 3.10.2 Telescoping with rigged lattice extension..................................................... 88 3.10.3 Swinging the lattice extension onto the run-up rail........................................... 89 Swinging outside the crane cab................................................................... 89 Swinging from the crane cab...................................................................... 90 3.11 Turning loads with the lattice extension............................................................ 91 3.11.1 Preconditions................................................................................. 91 3.11.2 Setting the RCL............................................................................... 92 Turning a load................................................................................... 93 3.12 Driving with rigged crane with a rigged lattice extension.......................................... 95 3.12.1 Driving path.................................................................................. 95 3.12.2 Position of the boom.......................................................................... 96 11 m telescopic swing-away lattice extension..................................................... 97 19 m telescopic swing-away lattice extension..................................................... 98 3.12.3 Driving the rigged crane...................................................................... 99 Lock the superstructure and engage the slewing gear holding brake................................ 99 Retracting the outriggers........................................................................ 99 Switching over the suspension locking system..................................................... 99 Switching on the separate steering...............................................................100 Driving..........................................................................................100 Extending the outriggers........................................................................101 3.13 Malfunctions while working with the telescopic swingaway lattice extension.........................103 3.13.1 Malfunctions on the telescopic swing-away lattice extension...................................103 3.14 Maintenance plans...................................................................................105 3.14.1 Maintenance plan M1: monthly/after 100 oper. hrs.............................................105 3.14.2 Maintenance plan M3: every 3 months/after 300 oper. hrs......................................105 3.15 Lubrication chart...................................................................................107 3.16 Maintenance work....................................................................................109 3.16.1 Assemblies endangered by cleaning work........................................................109 3.16.2 Preparing the truck crane for maintenance work................................................110 3.16.3 Lubricating support rollers...................................................................111 3.16.4 Lubricating the tow chain and the gear chain..................................................112 Lubricating the gear chain.......................................................................113 Lubricating the tow chain........................................................................113 3.16.5 Tension in the tow chain and gear chain check, if required increase tension...................114 Checking tow chain tension.......................................................................115 Checking gear chain tension......................................................................115 Increasing tow chain tension.....................................................................116 Increasing gear chain tension....................................................................116 3.16.6 Lubricating the telescope slide faces.........................................................117 3.16.7 Adjusting the support roller for the telescopic section.......................................118 4 Auxiliary single-sheave boom top...........................................................................121 4.1 Slinging point.......................................................................................121 4.2 Description of the rigging work......................................................................123 4.2.1 Installing/removing auxiliary single-sheave boom top...........................................123 Installation.....................................................................................123 Removal..........................................................................................124 4.2.2 Rigging the auxiliary single-sheave boom top...................................................125 Rigging in transport position....................................................................125 Rigging in working position......................................................................125 4.3 Reeving the hoist rope...............................................................................127 Positioning the hoist rope...........................................................................127 Possible reeving methods on the auxiliary single- sheave boom top....................................127 4.4 Connecting the lifting limit switch and anemometer...................................................129 Connecting the lifting limit switch..................................................................129 Connecting the anemometer...........................................................................129 4.5 Turning loads with the auxiliary single-sheave boom top..............................................131 Preconditions........................................................................................131 Setting the RCL......................................................................................132 Turning a load.......................................................................................133 5 Boom extension.............................................................................................137 5.1 Components and identification........................................................................137 Components...........................................................................................137 Identification.......................................................................................137 Foot section.........................................................................................138 Intermediate sections...............................................................................138 Head.................................................................................................139 Angle piece..........................................................................................139 5.2 Possible combinations................................................................................141 5.3 Slinging points......................................................................................143 5.4 Rigging the boom extension...........................................................................145 5.4.1 CHECKLIST: Rigging the boom extension..........................................................145 5.4.2 CHECKLIST: Unrigging the boom extension........................................................148 5.5 Description of the rigging work......................................................................151 5.5.1 Truck crane rigging mode during installation of the boom extension.............................151 5.5.2 Handling the pins..............................................................................152 5.5.3 Installing/removing the foot section...........................................................153 Installation.....................................................................................153 Removal..........................................................................................153 5.5.4 Installing/removing the boom extension sections................................................154 Checks before installation/removal...............................................................154 Connecting pins..................................................................................154 Installing.......................................................................................155 Removing.........................................................................................155 5.5.5 Transport pins.................................................................................157 5.5.6 Angle piece....................................................................................158 Inclining the angle piece to 25.................................................................159 Angle section at a3 angle......................................................................159 5.5.7 Changing over the lifting limit switch and anemometer..........................................160 5.5.8 Establishing/disconnecting the electrical connection...........................................161 Connecting cable.................................................................................161 Establishing aconnection........................................................................162 Disconnecting theconnection.....................................................................163 5.5.9 Reeving the hoist rope.........................................................................164 Possible reeving methods.........................................................................166 5.6 Driving with rigged crane and rigged boom extension..................................................169 5.6.1 Driving path...................................................................................169 5.6.2 Position of the boom...........................................................................170 19 m boom extension.............................................................................171 27 m boom extension.............................................................................172 35 m boom extension.............................................................................173 43 m boom extension.............................................................................174 51 m boom extension.............................................................................175 5.6.3 Driving the rigged crane.......................................................................176 Lock the superstructure and engage the slewing gear holding brake................................176 Retracting the outriggers........................................................................176 Switching over the suspension locking system.....................................................176 Driving..........................................................................................177 Extending the outriggers........................................................................177 5.7 Operation with boom extension........................................................................179 Crane movements......................................................................................180 RCL Shutdown.........................................................................................180 Effect of wind when operating the boom extension.....................................................181 5.7.1 Telescoping with rigged boom extension.........................................................182 5.8 Maintenance plans....................................................................................183 5.8.1 Maintenance plan M1: monthly/after 100 oper. hrs..............................................183 5.9 Lubrication chart....................................................................................185 5.10 Maintenance work....................................................................................187 5.10.1 Lubricating the fall-back guard...............................................................187 5.10.2 Lubricating connecting pins...................................................................187 6 Luffing jib................................................................................................191 6.1 Additional operating and display elements in the crane cab...........................................191 6.1.1 Position of the additional operating and display elements......................................192 6.1.2 Function of the additional operating and display elements......................................194 6.2 Components and identification........................................................................197 Components...........................................................................................197 Identification.......................................................................................197 Foot section.........................................................................................198 Intermediate sections and guy piece.................................................................198 Head.................................................................................................199 Luffing control arm..................................................................................199 6.3 Possible combinations................................................................................201 6.4 Slinging points......................................................................................203 6.5 Rigging the luffing jib..............................................................................205 6.5.1 CHECKLIST: Rigging luffing jib.................................................................205 6.5.2 CHECKLIST: Removing the luffing jib............................................................210 6.6 Description of the rigging work......................................................................215 6.6.1 Rigging mode of the truck crane when mounting the luffing jib..................................215 6.6.2 Installing/removing the luffing control arm....................................................216 Installing luffing control arm...................................................................216 Removal..........................................................................................217 6.6.3 Rigging/unrigging fall-back guard strut........................................................219 When rigging.....................................................................................219 When unrigging...................................................................................220 6.6.4 Handling the pins..............................................................................221 6.6.5 Installing/removing the foot section...........................................................222 Installation.....................................................................................222 Removal..........................................................................................222 6.6.6 Raising/setting down the luffing control arm...................................................223 Raising the luffing jib..........................................................................223 Setting down the luffing control arm.............................................................224 Raising/folding in the railing...................................................................224 6.6.7 Preparing the upper hook block for rigging.....................................................225 Before mounting the foot section.................................................................225 After mounting the foot section..................................................................225 6.6.8 Fasten the upper hook block on the luffing control arm.........................................226 6.6.9 Removing the upper hook block from the luffing control arm.....................................228 6.6.10 Installing/removing boom sections and rear pendant links......................................230 Connecting pins..................................................................................230 Installing.......................................................................................230 Removing.........................................................................................232 Rear pendant link transport protection...........................................................234 6.6.11 Removing/inserting the transport pins.........................................................236 Removing the transport pins......................................................................236 Inserting transport pins........................................................................237 6.6.12 Moving the lifting limit switch and anemometer................................................238 Changing over the anemometer.....................................................................238 Connecting the lifting limit switch and anemometer...............................................238 Locking the lifting limit switch.................................................................239 Releasing locking................................................................................240 6.6.13 Establishing/disconnecting the electrical connection..........................................240 RCL connecting cable.............................................................................240 Establishing aconnection........................................................................241 Disconnecting the connection.....................................................................242 6.6.14 Reeving the hoist rope........................................................................243 Possible reeving methods.........................................................................245 6.6.15 Telescoping with the luffing jib..............................................................247 Telescoping when using the rigged 21m luffing jib...............................................250 6.6.16 Derricking luffing jib when rigging...........................................................251 6.6.17 Derricking main boom with installed luffing jib...............................................253 Derricking between β1.5 to 82..................................................................253 Derricking between 70and82...................................................................253 6.6.18 Putting the luffing jib into working position.................................................254 Raise the luffing jib............................................................................254 Telescoping to fixed length......................................................................257 Entering working position........................................................................257 6.6.19 Preparing the luffing jib for unrigging.......................................................258 6.6.20 Checking the shutdown angles..................................................................262 Initial position.................................................................................262 Checking the shutdown angles....................................................................263 6.7 Operating with the luffing jib.......................................................................267 6.7.1 Maximum permitted slewing speed................................................................268 6.7.2 Crane movements................................................................................269 6.7.3 Working range and shutdowns....................................................................270 6.7.4 RCL shutdown...................................................................................271 The effect of wind when operating with the luffing jib...........................................272 6.7.5 Malfunctions when working with theluffing jib.................................................273 6.8 Driving with rigged crane and rigged luffing jib.....................................................275 6.8.1 Driving path...................................................................................275 6.8.2 Position of the boom...........................................................................276 21 m luffing jib.................................................................................277 29 m luffing jib.................................................................................278 37 m luffing jib.................................................................................279 45 m luffing jib.................................................................................280 53 m luffing jib.................................................................................281 61 m luffing jib.................................................................................282 6.8.3 Driving the rigged crane.......................................................................283 Lock the superstructure and engage the slewing gear holding brake................................283 Retracting the outriggers........................................................................283 Switching over the suspension locking system.....................................................283 Extending the outriggers........................................................................284 6.9 Maintenance plans....................................................................................285 6.9.1 Maintenance plan M1: monthly/after 100 oper. hrs..............................................285 6.9.2 Maintenance plan M6: every six monthly/after 500 oper. hrs....................................285 6.10 Lubrication chart...................................................................................287 6.11 Maintenance work....................................................................................289 6.11.1 Lubricating the fall-back guard...............................................................289 6.11.2 Lubricating connecting pins...................................................................289 6.11.3 Checking the nitrogen and oil pressure in the fall-back guard strut...........................290 Test connections.................................................................................290 Nitrogen pressure................................................................................291 Oil pressure.....................................................................................293 7 Heavy load lattice extension...............................................................................297 7.1 Components and identification........................................................................297 7.2 Possible combinations................................................................................299 7.3 Slinging points......................................................................................301 7.4 Rigging the heavy load lattice extension.............................................................303 7.4.1 CHECKLIST: Rigging the heavy load lattice extension............................................303 7.4.2 CHECKLIST: Unrigging the heavy load lattice extension..........................................305 7.5 Description of the rigging work......................................................................307 7.5.1 Truck crane rigging mode during installation of the heavy load lattice extension...............307 7.5.2 Handling the pins..............................................................................308 7.5.3 Installing/removing heavy load lattice extension sections......................................308 Connecting pins..................................................................................308 Installing.......................................................................................309 Removing.........................................................................................310 7.5.4 Angle piece....................................................................................311 Inclining the angle piece to 40.................................................................312 Angle section at a18 angle.....................................................................312 7.5.5 Moving the lifting limit switch and anemometer.................................................313 Connecting the lifting limit switch and anemometer...............................................314 7.5.6 Establishing/disconnecting the electrical connection...........................................314 Connecting cable.................................................................................314 Establishing connection.........................................................................315 Disconnecting the connection.....................................................................316 7.5.7 Reeving the hoist rope.........................................................................317 Possible reeving methods on the heavy load lattice extension.....................................319 7.6 Operating the heavy load lattice extension...........................................................321 Telescoping with rigged heavy load lattice extension.................................................321 7.6.1 Crane movements................................................................................322 RCL shutdown.....................................................................................322 Effect of wind when operating the heavy load lattice extension..................................323 7.7 Turning loads with the heavy load lattice extension..................................................325 Preconditions........................................................................................325 Setting the RCL......................................................................................326 Turning a load.......................................................................................327 7.8 Driving with a rigged crane and rigged heavy load lattice extension.................................329 7.8.1 Driving path...................................................................................329 7.8.2 Position of the boom...........................................................................330 Heavy load lattice extension 3.5m...............................................................331 Heavy load lattice extension 7.0m...............................................................332 7.8.3 Driving the rigged crane.......................................................................333 Lock the superstructure and engage the slewing gear holding brake................................333 Retracting the outriggers........................................................................333 Switching over the suspension locking system.....................................................333 Switching on the separate steering...............................................................334 Driving..........................................................................................334 Extending the outriggers........................................................................335 8 Index......................................................................................................339 A........................................................................................................341 B........................................................................................................341 C........................................................................................................341 D........................................................................................................341 E........................................................................................................341 F........................................................................................................342 H........................................................................................................342 I........................................................................................................342 L........................................................................................................342 M........................................................................................................342 O........................................................................................................343 P........................................................................................................343 R........................................................................................................343 S........................................................................................................343 T........................................................................................................344 U........................................................................................................344
Contact us: [email protected]
PLEASE NOTE:
- This is the same manual used by the DEALERSHIPS to SERVICE your vehicle.
- The manual can be all yours – Once payment is complete, you will be taken to the download page from where you can download the manual. All in 2-5 minutes time!!
- Need any other service / repair / parts manual, please feel free to contact us atΒ heydownloadss @gmail.comΒ . We may surprise you with a nice offer
S.VΒ
βΉ
What Our Customers Say
β
β
β
β
β
Live reviews from customers
Loading customer reviews...
π Related Products
Discover more professional manuals for your equipment
-70% OFF

Grove GMK 5200 Operating Instructions Manual Part 1 (Driving) - PDF DOWNLOAD
β
β
β
β
β
(209 reviews)
$98.95
$29.95
-64% OFF

Grove GMK 5220 Operating Instructions Manual Part 1 (Driving) - PDF DOWNLOAD
β
β
β
β
β
(54 reviews)
$82.95
$29.95
-70% OFF

Grove Crane GMK 5100 Operating Instructions Manual Part 1 (Carrier) - PDF DOWNLOAD
β
β
β
β
β
(278 reviews)
$98.95
$29.95
-65% OFF

Grove GMK 5220 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD
β
β
β
β
β
(155 reviews)
$65.95
$22.95