Grove Crane GMK 6400 Boom Extension light Operating Instruction Manual 3113164 – PDF DOWNLOAD
$27.95
Grove Crane GMK 6400 Boom Extension light Operating Instruction Manual 3113164 – PDF DOWNLOAD
Description
Grove Crane GMK 6400 Boom Extension light Operating Instruction Manual 3113164 – PDF DOWNLOAD
FILE DETAILS:
Grove Crane GMK 6400 Boom Extension light Operating Instruction Manual 3113164 – PDF DOWNLOAD
Language : English
Pages : 160
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:
Grove Crane GMK 6400 Boom Extension light Operating Instruction Manual 3113164 – PDF DOWNLOAD
Basic safety instructions:
- In principle, the basic safety instructions from the GMK 6400 operating instructions apply. The
basic safety instructions for the lattice extensions supplied for the truck crane are given below. - Information regarding the warnings and symbols used; Γ GMK 6400 operating instructions.
Intended use:
The GMK 6400 is a state-of-the-art truck crane, designed in accordance with approved safety
regulations. Nevertheless, the operator or third parties can still be endangered and the crane or
other property put at risk while using it.
- In addition to the following specifications, also follow the specifications about proper use given
in the GMK 6400 operating instructions. - The GMK 6400 may only be operated with parts of equipment which are permitted by Manitowoc Crane
Group Germany GmbH and which are labelled with the serial number of the GMK 6400. - Observe the inspection and maintenance requirements for the lattice exten- ording to the
Maintenance chapter.
TABLE OF CONTENTS:
Grove Crane GMK 6400 Boom Extension light Operating Instruction Manual 3113164 – PDF DOWNLOAD
1 Overview......................................................................... 7 1.1 Accidents.................................................................. 7 1.2 Warranty................................................................... 7 1.3 Terms used................................................................. 8 1.3.1 For the boom extension, light........................................ 8 1.3.2 On the main boom..................................................... 10 1.4 Notes on the lattice extension operating manual............................ 11 1.4.1 What do the symbols used mean?....................................... 11 1.4.2 Definition of direction information.................................. 11 Basic rule............................................................. 11 Switches and buttons................................................... 12 General notes on the operating elements................................ 12 General rules for buttons and symbols.................................. 12 1.4.3 How are the operating instructions structured?....................... 13 1.4.4 How do I find the information I need?................................ 14 1.5 Conversion table for US measuring units.................................... 15 2 Basic safety instructions........................................................ 19 2.1 Intended use............................................................... 19 2.2 Improper use............................................................... 20 2.3 Organisational measures.................................................... 20 2.4 Personnel qualifications................................................... 21 Requirements............................................................... 21 Training courses........................................................... 21 2.5 Safety instructions for working with the lattice extension................. 22 2.6 Notes on transporting persons.............................................. 23 3 For operations planning.......................................................... 27 3.1 Information on the load capacity charts.................................... 27 3.2 Notes on assembly.......................................................... 28 3.3 Assembly................................................................... 30 3.3.1 Combinations Type A and Type B....................................... 30 3.3.2 Combinations Type C.................................................. 32 3.4 Transport dimensions and weights........................................... 34 3.5 Identification............................................................. 36 3.6 Slinging points............................................................ 38 3.7 Transport.................................................................. 39 Applicable for all sections................................................ 39 For the head............................................................... 39 4 Additional operating and display elements........................................ 43 4.1 Overview of the operating elements......................................... 43 4.1.1 On the crane control display......................................... 43 Power unit speeds submenu.............................................. 43 4.1.2 On the RCL display................................................... 44 Submenu for entering rigging mode...................................... 44 Submenu for RCL monitoring............................................. 44 4.2 Brief description of the operating elements................................ 45 4.2.1 On the crane control display......................................... 45 In the power unit speed submenu........................................ 45 4.2.2 On the RCL display................................................... 45 Entering rigging mode in submenu....................................... 45 In the RCL monitoring submenu.......................................... 46 5 Boom extension, light............................................................ 49 5.1 Checklists for rigging work................................................ 49 5.1.1 CHECKLIST: Rigging the boom extension, light......................... 49 5.1.2 CHECKLIST: Unrigging the boom extension, light....................... 53 5.2 Description of the rigging work............................................ 57 5.2.1 Installing/removing the rear pendant links........................... 57 Removing the rear pendant links........................................ 57 Installing the rear pendant links...................................... 57 5.2.2 Pulling apart/pushing together intermediate sections................. 58 Folding up/folding out the rests....................................... 58 Rear pendant link transport protection................................. 58 Pulling apart intermediate sections.................................... 59 Pushing together intermediate sections................................. 60 5.2.3 Rigging mode of the truck crane when installing and removing......... 61 5.2.4 Establishing/disconnecting the connections for the hydraulic lock.... 62 Establishing the connections........................................... 62 Disconnecting the connections.......................................... 63 5.2.5 Securing/releasing locks............................................. 64 5.2.6 Locking the adapter/releasing the pin................................ 65 Prerequisites.......................................................... 65 Locking the adapter.................................................... 65 Releasing the locking pin.............................................. 66 5.2.7 Handling the pins.................................................... 67 5.2.8 Installing/removing boom extension sections.......................... 68 Before installation.................................................... 68 Installing............................................................. 69 Removing............................................................... 70 5.2.9 Removing/installing the deflection sheave on the angle piece......... 71 5.2.10 Replacing deflection sheaves on the angle piece..................... 72 5.2.11 Folding deflection sheaves up/down.................................. 73 On the angle piece..................................................... 73 On the adapter......................................................... 74 5.2.12 Setting the angle position of the boom extension.................... 75 5.2.13 Installing/removing the lifting limit switch........................ 77 Installing lifting limit switch........................................ 77 Removing the lifting limit switch...................................... 78 5.2.14 Connecting cable.................................................... 79 5.2.15 Establishing/disconnecting the electrical connection................ 80 Establishing a connection.............................................. 80 Disconnecting.......................................................... 81 5.2.16 Anemometer and air traffic control light............................ 82 Installing............................................................. 82 Removing............................................................... 82 5.2.17 Placing and reeving the hoist rope.................................. 84 Possible reevings...................................................... 86 5.3 Operation with boom extension.............................................. 89 5.3.1 Operating the RCL.................................................... 90 Entering the RCL code.................................................. 90 Entering components.................................................... 90 Accepting the rigging mode............................................. 92 Checks and displays in the Monitoring submenu.......................... 93 5.3.2 RCL shutdown......................................................... 94 5.3.3 Crane movements...................................................... 94 5.3.4 Telescoping with rigged boom extension............................... 95 5.3.5 Checks when operating with the boom extension........................ 96 Horizontal alignment................................................... 96 Checking the wind speed................................................ 96 6 Driving with a rigged truck crane................................................101 6.1 Driving distance...........................................................102 6.2 Permissible rigging modes and axle loads...................................102 6.3 Before driving the rigged truck crane......................................103 6.4 Driving the rigged truck crane.............................................103 Driving from the driver's cab..............................................103 While driving..............................................................103 6.5 Tables with boom positions and axle loads..................................105 Information about the tables...............................................105 6.5.1 Driving with rigged truck crane with MegaWingLift..................106 Boom extension, light, 2,3 + 11 m 42..................................106 Boom extension, light, 2,3 + 11 m 20..................................107 Boom extension, light, 8,3 + 5m 42...................................108 Boom extension, light, 2,3 + 17m 42..................................109 Boom extension, light, 2,3 + 17m 20..................................110 Boom extension, light, 14,3 + 5m 42..................................111 Boom extension, light, 2,3 + 23m 42..................................112 Boom extension, light, 2,3 + 23m 20..................................113 Boom extension, light, 20,3 + 5m 42..................................114 6.5.2 Driving with rigged truck crane without Mega Wing Lift...............115 Boom extension, light, 2,3 + 11m 42..................................115 Boom extension, light, 2,3 + 11m 20..................................116 Boom extension, light, 8,3 + 5m 42...................................117 Boom extension, light, 2,3 + 17m 42..................................118 Boom extension, light, 2,3 + 17m 20..................................119 Boom extension, light, 14,3 + 5m 42..................................120 Boom extension, light, 2,3 + 23m 42..................................121 Boom extension, light, 2,3 + 23m 20..................................122 Boom extension, light, 20,3 + 5m 42..................................123 Boom extension, light, 2,3 + 29m 42..................................124 Boom extension, light, 2,3 + 29m 20..................................125 Boom extension, light, 26,3 + 5m 42..................................126 Boom extension, light, 2,3 + 35m 42..................................127 Boom extension, light, 2,3 + 35m 20..................................128 Boom extension, light, 32,3 + 5m 42..................................129 Boom extension, light, 2,3 + 41m 42..................................130 Boom extension, light, 2,3 + 41m 20..................................131 Boom extension, light, 38,3 + 5m 42..................................132 7 Malfunctions.....................................................................135 7.1 Notes on troubleshooting...................................................135 General instructions.......................................................135 What to do in the event of malfunctions....................................135 Fuses......................................................................135 ECOS malfunctions..........................................................135 RCL malfunctions...........................................................135 7.2 Troubleshooting and remedies...............................................137 7.2.1 Boom extension.......................................................137 7.3 RCL malfunctions...........................................................139 7.3.1 Table of lattice extension error codes...............................139 7.3.2 Checking RCL supply lines and connections............................141 On the lattice extension...............................................142 8 Maintenance......................................................................145 8.1 Cleaning...................................................................146 Overview of subassemblies easily damaged when cleaning.....................146 8.2 Maintenance plans..........................................................147 8.2.1 Maintenance plan M 1.................................................147 8.2.2 Maintenance plan M 3.................................................147 8.3 Maintenance work...........................................................148 8.3.1 Lubricating the connecting and socket pins...........................148 Grease, tools..........................................................148 Prerequisites..........................................................148 Check the following....................................................148 Greasing...............................................................149 8.3.2 Checking the sheaves.................................................149 9 Index............................................................................153 A..............................................................................155 B..............................................................................155 C..............................................................................155 D..............................................................................155 F..............................................................................155 I..............................................................................155 L..............................................................................156 M..............................................................................156 O..............................................................................156 P..............................................................................156 R..............................................................................157 S..............................................................................157 T..............................................................................157 W..............................................................................157
Questions? Email us: [email protected]
PLEASE NOTE:
- This is the same manual used by the DEALERSHIPS to SERVICE your vehicle.
- The manual can be all yours – Once payment is complete, you will be taken to the download page from where you can download the manual. All in 2-5 minutes time!!
- Need any other service / repair / parts manual, please feel free to contact us atΒ heydownloadss @gmail.comΒ . We may surprise you with a nice offer
S.V
What Our Customers Say
π Related Products
Discover more professional manuals for your equipment

Grove GMK 5130-1 Operating Instructions Manual Part 1 (Driving) - PDF DOWNLOAD

Grove GMK5200 6220-L Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

Grove GMK4075-1 Operating Instructions Manual Part 1 (Driving) - PDF DOWNLOAD
