★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Grove Crane GMK 6400 Lattice Extension Operating Instruction Manual 3112975 – PDF DOWNLOAD

$28.95

Grove Crane GMK 6400 Lattice Extension Operating Instruction Manual 3112975 – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Grove Crane GMK 6400 Lattice Extension Operating Instruction Manual 3112975 – PDF DOWNLOAD

FILE DETAILS:

Grove Crane GMK 6400 Lattice Extension Operating Instruction Manual 3112975 – PDF DOWNLOAD

Language : English
Pages : 398
Downloadable : Yes
File Type : PDF

IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:

Grove Crane GMK 6400 Lattice Extension Operating Instruction Manual 3112975 – PDF DOWNLOAD

Basic safety instructions:

  • In principle, the basic safety instructions apply from the Operating Instruc- tions GMK 6400. The
    basic safety instructions for the lattice extensions sup- plied for the truck crane are given
    below.
  • Information regarding the warnings and symbols used; à Operating Instructions GMK 6400.

Intended use:
The GMK 6400 is a state-of-the-art truck crane, designed in accordance with approved safety
regulations. Nevertheless, the operator or third parties can still be endangered and the crane or
other property put at risk while using it.

  • In addition to the following specifications, also observe the specifications for intended use in
    the Operating Instructions GMK 6400.
  • The GMK 6400 may only be operated with parts of equipment which are permitted by Manitowoc Crane
    Group Germany GmbH and which are labelled with the serial number of the GMK 6400.
  • Observe the inspection and maintenance requirements for the lattice exten- sion according to the
    Maintenance chapter.

Only use the rigging winch (special equipment) to do the following:
– To pull the rope of the hoisting gear to the head when rigging the boom extension and the
luffing jib
– To pull the rope of the hoisting gear over the luffing control arm to the
upper hook block when rigging the luffing jib

TABLE OF CONTENTS:

Grove Crane GMK 6400 Lattice Extension Operating Instruction Manual 3112975 – PDF DOWNLOAD

Additional page: Slinging points on the auxiliary single-sheave boom top..........................  3
Additional page: Modified rigging winch...........................................................  5
	Validity......................................................................................  5
		Modifications.............................................................................  5
	Rope guide....................................................................................  6
		Rope guide for the mounting sites.........................................................  6
			Additional support roller.............................................................  6
		Positioning the rigging rope on the support roller/taking it off the support roller.......  7
		Setting the support roller upright/laying it down.........................................  7
Additional page: Operating with the luffing jib
..................................................  9
Correction sheet: Electrical connection head/foot section......................................... 11
1 Overview........................................................................................ 21
	1.1 Accidents................................................................................. 21
	1.2 Warranty.................................................................................. 21
	1.3 Terms used................................................................................ 22
		1.3.1 For the boom extension.............................................................. 22
		1.3.2 For the luffing jib................................................................. 24
		1.3.3 For the heavy load lattice extension................................................ 26
		1.3.4 For the auxiliary single-sheave boom top............................................ 27
		1.3.5 For operation of the rigging winch.................................................. 28
		1.3.6 On the main boom.................................................................... 29
	1.4 Notes about the lattice extension operating manual........................................ 31
		1.4.1 What do the symbols used mean?...................................................... 31
		1.4.2 Definitions of direction information................................................ 31
			Basic rule............................................................................ 31
			Switches and buttons................................................................. 32
			General information on the operating elements......................................... 32
			General rules for buttons and symbols................................................ 32
		1.4.3 How are the operating instructions structured?...................................... 33
		1.4.4 How do I find the information I need?............................................... 34
	1.5 Conversion table for US measurements...................................................... 35
2 Basic safety instructions....................................................................... 39
	2.1 Intended use.............................................................................. 39
	2.2 Improper use.............................................................................. 40
	2.3 Organisational measures................................................................... 40
	2.4 Personnel qualifications.................................................................. 41
		Requirements.............................................................................. 41
		Training courses.......................................................................... 41
	2.5 Safety instructions for working with the lattice extension............................... 42
	2.6 Information on transporting persons....................................................... 43
3 For operations planning......................................................................... 47
	3.1 Boom extension, luffing jib and heavy load lattice extension.............................. 47
		3.1.1 Notes on assembly................................................................... 47
		3.1.2 Assembly of the boom extension 3 inclined.......................................... 48
		3.1.3 Assembly of the boom extension 25 inclined......................................... 54
		3.1.4 Assembly of the luffing jib without inclination..................................... 58
		3.1.5 Assembly of the luffing jib with inclination........................................ 62
		3.1.6 Assembly of the heavy load lattice extension........................................ 64
		3.1.7 Transport dimensions and weights.................................................... 65
			Foot section in different combinations.............................................. 68
			Intermediate sections pushed into each other......................................... 70
		3.1.8 Identification...................................................................... 71
		3.1.9 Slinging points..................................................................... 75
			Slinging points on the foot section................................................... 77
		3.1.10 Transport.......................................................................... 79
			Applicable for all sections........................................................... 79
			For the foot section/luffing control arm............................................. 79
			For the head.......................................................................... 80
	3.2 Auxiliary single-sheave boom top.......................................................... 81
		3.2.1 Assembly............................................................................ 81
		3.2.2 Identification and slinging point................................................... 81
		3.2.3 Transport dimensions and weight..................................................... 82
4 Additional operating and display elements....................................................... 85
	4.1 Overview of the operating elements........................................................ 85
		4.1.1 On the crane control display........................................................ 85
			Main menu............................................................................. 85
			Luffing jib submenu.................................................................. 86
			Power unit speeds submenu............................................................. 86
		4.1.2 On the RCL display.................................................................. 87
			Submenu for entering rigging mode..................................................... 87
			Submenu for RCL monitoring............................................................ 87
		4.1.3 On the hand-held control............................................................ 88
	4.2 Brief description of the operating elements............................................... 89
		4.2.1 On the crane control display........................................................ 89
			In the power unit speed submenu....................................................... 89
			In the Luffing jib submenu............................................................ 89
		4.2.2 On the RCL display.................................................................. 97
			Entering rigging mode in submenu...................................................... 97
			In the RCL monitoring submenu......................................................... 98
		4.2.3 On the hand-held control............................................................ 99
			Pre-selection......................................................................... 99
			Movements of the rigging winch........................................................100
5 Boom extension..................................................................................103
	5.1 Checklists for rigging work...............................................................103
		5.1.1 CHECKLIST: Rigging the boom extension...............................................103
		5.1.2 CHECKLIST: Unrigging the boom extension.............................................109
	5.2 Description of the rigging work...........................................................113
		5.2.1 Pulling apart/pushing together intermediate sections................................113
			Folding up/folding out holders........................................................113
			Installing/removing the rear pendant links...........................................113
			Pulling apart intermediate sections...................................................114
			Pushing together intermediate sections...............................................115
		5.2.2 Checking the bracing arms...........................................................116
		5.2.3 Rigging mode of the truck crane at installation and removal.........................117
		5.2.4 Establishing/disconnecting the connections for the hydraulic lock...................118
			Making the connections...............................................................118
			Breaking the connections.............................................................119
		5.2.5 Securing/releasing locks............................................................120
		5.2.6 Locking the foot section/releasing the lock.........................................121
			Prerequisites.........................................................................121
			Locking the foot section..............................................................121
			Releasing the lock....................................................................122
		5.2.7 Handling the pins...................................................................123
		5.2.8 Installing/removing boom extension sections.........................................124
			Before the installation...............................................................124
			Installing............................................................................124
			Removing..............................................................................125
		5.2.9 Blocking the joint on the foot section..............................................126
		5.2.10 Removing/installing the deflection sheave on the angle piece.......................127
		5.2.11 Replacing deflection sheaves on the angle piece....................................128
		5.2.12 Folding deflection sheaves up/down.................................................129
			On the angle piece....................................................................129
			On the foot section..................................................................130
		5.2.13 Setting the angle position of the boom extension...................................131
		5.2.14 Installing/removing the lifting limit switch.......................................133
			Installing lifting limit switch.......................................................133
			Removing the lifting limit switch....................................................134
		5.2.15 Anemometer and air traffic control light...........................................135
			Installing............................................................................135
			Removing..............................................................................135
		5.2.16 Electrical connection foot section/main boom.......................................136
			Establishing..........................................................................136
			Disconnecting.........................................................................136
		5.2.17 Electric connection head/foot section..............................................137
			Connecting cable......................................................................137
			Establishing..........................................................................137
			Disconnecting.........................................................................138
		5.2.18 Placing and reeving the hoist rope.................................................140
			Possible reeving methods..............................................................142
	5.3 Operation with boom extension.............................................................145
		5.3.1 Operating the RCL...................................................................146
			Entering the RCL code.................................................................146
			Enter components......................................................................146
			Accepting the rigging mode...........................................................148
			Checks and displays in the Monitoring submenu.........................................148
		5.3.2 RCL shutdown........................................................................150
		5.3.3 Crane movements.....................................................................150
		5.3.4 Telescoping with rigged boom extension..............................................151
		5.3.5 Checks when operating with the boom extension.......................................152
			Horizontal alignment.................................................................152
			Checking the wind speed...............................................................152
6 Luffing jib.....................................................................................157
	6.1 Checklists for rigging work...............................................................157
		6.1.1 CHECKLIST: Rigging the luffing jib..................................................157
		6.1.2 CHECKLIST: Unrigging the luffing jib................................................165
	6.2 Description of the rigging work...........................................................171
		6.2.1 Ladder and railing..................................................................171
			When rigging..........................................................................171
			When unrigging........................................................................172
			Railing on the luffing control arm....................................................174
		6.2.2 Pulling apart/pushing together intermediate sections................................175
		6.2.3 Checking the bracing arms...........................................................175
		6.2.4 Rigging mode of the truck crane at installation and removal.........................175
		6.2.5 Installing/removing the luffing control arm.........................................176
			Installation..........................................................................176
			Removal...............................................................................179
		6.2.6 Raising/setting down the luffing control arm........................................182
			Raising the luffing control arm.......................................................182
			Setting down the luffing control arm..................................................182
		6.2.7 Hand-held control...................................................................183
			Moving the hoists.....................................................................183
			Moving the rigging winch.............................................................183
		6.2.8 Separating/connecting catcher 2 and raising cylinder................................184
			Setting down/ raising catcher 2.......................................................184
			Separating catcher 2 and the raising cylinder.........................................185
			Connecting catcher 2 and raising cylinder............................................185
		6.2.9 Reeving the auxiliary hoist rope to the upper hook block............................186
		6.2.10 Preparing the upper hook block for rigging.........................................188
			Before mounting the foot section......................................................188
			After mounting the foot section.......................................................189
		6.2.11 Fastening the upper hook block on the luffing control arm..........................189
			Releasing the safety device on the upper hook block...................................189
			Pulling the upper hook block towards the luffing control arm.........................190
			Locking the upper hook block..........................................................191
		6.2.12 Releasing the upper hook block from the luffing control arm........................193
			Releasing the locking pin.............................................................193
			Pulling the upper hook block towards the catcher......................................194
			Securing the upper hook block in the catcher..........................................195
			Reeling up the hoist rope.............................................................196
		6.2.13 Replacing the intermediate sections on the foot section............................197
			Prerequisites.........................................................................197
			When rigging..........................................................................198
			When unrigging........................................................................199
		6.2.14 Installing/removing sections of the luffing jib and rear pendant links.............200
			Before the installation..............................................................200
			Installing............................................................................200
			Removing..............................................................................202
			Rear pendant link transport protection...............................................204
		6.2.15 Hinge lock in the foot section.....................................................205
			Releasing the hinge lock..............................................................205
			Locking the hinge.....................................................................207
		6.2.16 Setting the angle of the luffing jib...............................................209
		6.2.17 Placing and reeving the hoist rope.................................................211
			Possible reeving methods..............................................................212
		6.2.18 Opening the luffing jib submenu....................................................213
		6.2.19 Telescoping with the luffing jib...................................................214
			Prerequisites.........................................................................214
			Telescoping with teleautomation.......................................................215
			Telescoping with semi-automatic.......................................................217
		6.2.20 Derricking luffing jib when rigging................................................219
			Prerequisites.........................................................................219
		6.2.21 Derricking main boom with installed luffing jib....................................221
			Derricking between –1.5 to 82.......................................................221
			Derricking between 80 and 60........................................................222
		6.2.22 Putting the luffing jib into working position......................................223
			Raising the luffing jib...............................................................223
			Telescoping to fixed length...........................................................224
			Lowering to working position.........................................................225
		6.2.23 Preparing the luffing jib for unrigging............................................226
	6.3 Operating with the luffing jib............................................................229
		6.3.1 Operating the RCL...................................................................230
			Entering the RCL code for the luffing jib.............................................230
			Entering components for the luffing jib..............................................230
			Accepting the rigging mode...........................................................232
			Checks and displays in the Monitoring submenu.......................................233
		6.3.2 RCL shutdown........................................................................235
		6.3.3 Crane movements.....................................................................236
			Controlling...........................................................................236
			Derricking the main boom..............................................................236
			Maximum power unit speeds.............................................................236
			Shutdowns.............................................................................236
		6.3.4 Working range and shutdowns.........................................................237
		6.3.5 Checks when operating with the luffing jib..........................................239
			Horizontal alignment.................................................................239
			Checking the wind speed...............................................................239
7 Heavy load lattice extension....................................................................243
	7.1 Rigging the heavy load lattice extension..................................................243
		7.1.1 CHECKLIST: Rigging the heavy load lattice extension.................................243
		7.1.2 CHECKLIST: Unrigging the heavy load lattice extension...............................247
	7.2 Description of the rigging work...........................................................251
		7.2.1 Truck crane rigging mode during installation of the heavy load lattice extension....251
		7.2.2 Establishing/disconnecting the connections for the hydraulic lock...................252
			Making the connections...............................................................252
			Breaking the connections.............................................................253
		7.2.3 Securing/releasing locks............................................................254
		7.2.4 Handling the pins...................................................................255
		7.2.5 Locking the adapter/releasing the pin...............................................256
			Prerequisites.........................................................................256
			Locking the adapter...................................................................256
			Releasing the locking pin.............................................................257
		7.2.6 Replacing deflection sheaves on the angle piece.....................................258
		7.2.7 Installing/removing head section and angle piece....................................259
			Installing............................................................................259
			Removing..............................................................................259
		7.2.8 Folding deflection sheaves up/down..................................................261
			On the angle piece....................................................................261
			On the adapter........................................................................262
		7.2.9 Setting the angle position of the heavy load lattice extension......................263
		7.2.10 Installing/removing the lifting limit switch.......................................265
			Installing lifting limit switch.......................................................265
			Removing the lifting limit switch....................................................266
		7.2.11 Anemometer and air traffic control light...........................................267
			Installing............................................................................267
			Removing..............................................................................267
		7.2.12 Establishing/disconnecting the electrical connection...............................268
			Establishing aconnection.............................................................268
			Disconnecting.........................................................................269
		7.2.13 Placing and reeving hoist rope.....................................................270
			Possible reeving methods..............................................................271
	7.3 Operating the heavy load lattice extension................................................273
		7.3.1 Operating the RCL...................................................................273
			Entering the RCL code for the heavy load lattice extension...........................273
			Entering components for the heavy load lattice extension..............................273
			Accepting the rigging mode...........................................................275
			Checks and displays in the Monitoring submenu.......................................276
		7.3.2 RCL shutdown........................................................................277
		7.3.3 Crane movements.....................................................................277
		7.3.4 Telescoping with rigged heavy load lattice extension................................278
		7.3.5 Checks when operating with the heavy load lattice extension.........................279
			Horizontal alignment.................................................................279
			Checking the wind speed...............................................................279
		7.3.6 Notes on two-hook operation.........................................................280
8 Auxiliary single-sheave boom top................................................................283
	8.1 Installing/removing.......................................................................283
		8.1.1 Installing/removing the auxiliary single-sheave boom top............................283
			Installing............................................................................283
			Removing..............................................................................284
	8.2 Rigging the auxiliary single-sheave boom top..............................................285
		8.2.1 Rigging in working position/transport position......................................285
		8.2.2 Attaching and removing the hoist rope...............................................286
			Possible reeving methods..............................................................287
		8.2.3 Lifting limit switch and anemometer.................................................288
			Lifting limit switch..................................................................288
			Installing and removing...............................................................289
	8.3 Operation with the auxiliary single-sheave boom top.......................................290
		8.3.1 Setting the RCL.....................................................................290
		8.3.2 Derricking, telescoping the main boom...............................................290
		8.3.3 Notes on RCL shutdown...............................................................291
		8.3.4 Procedure if permissible wind speeds are exceeded...................................291
		8.3.5 RCL display with the auxiliary single-sheave boom top folded up/rigged..............292
		8.3.6 Notes on two-hook operation.........................................................292
9 Turning loads...................................................................................295
	9.1 Requirements..............................................................................296
	9.2 Setting the RCL to turn loads.............................................................297
		Entering the reevings....................................................................297
		Setting the RCL to the auxiliary hoist....................................................297
	9.3 Turning a load............................................................................299
10 Rigging winch (additional equipment)...........................................................305
	10.1 Overview.................................................................................305
		Operating principle and accessories.......................................................305
	10.2 Hand-held control........................................................................306
	10.3 Pulling the hoist rope to the head.......................................................307
		Requirements..............................................................................307
		Remarks...................................................................................307
		Rigging work on the sheaves for operating the rigging winch...............................308
		Reeling off the rigging rope..............................................................309
		Positioning the rigging rope..............................................................310
		Connecting the rigging rope and the hoist rope............................................310
		Unreeling the hoist rope..................................................................311
		Separating the rigging rope and the hoist rope............................................312
		Rolling the rigging rope onto the drum....................................................312
		Rigging work on the sheaves for crane operation...........................................314
	10.4 Pulling the hoist rope to the upper hook block...........................................315
		Requirements..............................................................................315
		Rigging work on the sheaves for operating the rigging winch...............................316
		Reeling off the rigging rope..............................................................317
		Positioning the rigging rope..............................................................318
		Connecting the rigging rope and the main hoist rope.......................................319
		Reeling off the main hoist rope...........................................................319
		Separating the rigging rope and the main hoist rope.......................................319
		Rolling the rigging rope onto the drum....................................................320
	10.5 Rigging work.............................................................................321
		10.5.1 For operation of the rigging winch.................................................321
			Releasing the winch lock..............................................................321
			Locking the winch.....................................................................321
			Loosening the rigging rope at the rope attachment point...............................322
			Fastening the rigging rope at the rope attachment point...............................323
			Installing the rigging winch..........................................................323
			Removing the rigging winch............................................................325
		10.5.2 Connecting/disconnecting the electrical connection.................................326
			Establishing..........................................................................326
			Disconnecting.........................................................................326
		10.5.3 Establishing/disconnecting the hydraulic connection................................327
			Establishing..........................................................................327
			Disconnecting.........................................................................327
		10.5.4 Rigging on the foot section........................................................328
			For operation of the rigging winch....................................................328
			For crane operation...................................................................329
		10.5.5 Guide sheaves......................................................................330
			Inserting or removing the rigging rope................................................330
		10.5.6 On the angle piece.................................................................331
			For operation of the rigging winch....................................................331
			For crane operation...................................................................331
		10.5.7 On the head........................................................................332
			For operation of the rigging winch....................................................332
			For crane operation...................................................................332
		10.5.8 Rope connector.....................................................................333
			Establishing the connection...........................................................333
			Undoing the connection................................................................335
11 Driving with rigged truck crane................................................................339
	11.1 Driving distance.........................................................................340
	11.2 Permissible rigging modes and axle loads.................................................340
		11.2.1 Rigging modes with boom extension..................................................340
		11.2.2 Rigging modes with luffing jib.....................................................341
		11.2.3 Rigging modes with the heavy load lattice extension................................344
		11.2.4 Rigging modes with the auxiliary single-sheave boom top............................344
	11.3 Before driving the rigged truck crane....................................................345
	11.4 Driving the rigged truck crane...........................................................345
		Driving from the driver's cab.............................................................345
		While driving.............................................................................345
	11.5 Tables with boom positions and axle loads................................................347
		Information about the tables..............................................................347
		11.5.1 Boom extension with 3 angle.......................................................348
		11.5.2 Boom extension with 25 angle......................................................348
		11.5.3 Luffing jib........................................................................348
		11.5.4 Heavy load lattice extension.......................................................348
		11.5.5 Auxiliary single-sheave boom top...................................................348
12 Malfunctions...................................................................................351
	12.1 Notes on troubleshooting.................................................................351
		General information......................................................................351
		What to do in theevent of malfunctions..................................................351
		Fuses.....................................................................................351
		ECOS malfunctions........................................................................351
		RCL malfunctions..........................................................................351
	12.2 Troubleshooting and remedies.............................................................353
		12.2.1 Boom extension and heavy load lattice extension....................................353
		12.2.2 Luffing jib........................................................................353
	12.3 RCL malfunctions.........................................................................357
		12.3.1 Table of lattice extension error codes.............................................358
		12.3.2 Checking RCL supply lines and connections..........................................359
			On the lattice extension..............................................................360
13 Maintenance....................................................................................363
	13.1 Cleaning work............................................................................364
		Overview of subassemblies easily damaged when cleaning....................................364
	13.2 Maintenance plans........................................................................367
		13.2.1 Maintenance plan M 1...............................................................367
		13.2.2 Maintenance plan M 3...............................................................367
		13.2.3 Maintenance plan Y 2...............................................................368
		13.2.4 Maintenance plan Y 5...............................................................368
		13.2.5 Maintenance plan Y 10..............................................................368
	13.3 Boom extension and luffing jib...........................................................369
		13.3.1 Lubricating the connecting and socket pins.........................................369
			Grease, tools.........................................................................369
			Prerequisites.........................................................................369
			Checking..............................................................................369
			Lubricating...........................................................................370
		13.3.2 Lubricating the lower joint........................................................371
			Grease, spare parts, tools............................................................371
			Prerequisites.........................................................................371
			Lubrication...........................................................................371
		13.3.3 Checking the sheaves...............................................................372
		13.3.4 Checking the nitrogen pressure and oil pressure in the fall-back guard strut.......373
			Spare parts and tools.................................................................373
			Prerequisites.........................................................................373
			Test connections......................................................................374
			Nitrogen pressure.....................................................................374
			Oil pressure..........................................................................378
		13.3.5 Required inspections for the fall-back guard strut.................................380
	13.4 Rigging winch (additional equipment).....................................................381
		13.4.1 Lubricating the bearings...........................................................381
			Grease, spare parts, tools............................................................381
			Prerequisites.........................................................................381
			Lubricating...........................................................................381
		13.4.2 Greasing the driving pinions.......................................................382
			Grease, spare parts, tools............................................................382
			Prerequisites.........................................................................382
			Greasing..............................................................................382
		13.4.3 Checking the condition of the rigging rope.........................................383
		13.4.4 Changing the rigging rope..........................................................384
			Spare parts and tools.................................................................384
			Prerequisites.........................................................................384
			Removing the old rope.................................................................384
			Attaching a new rope..................................................................385
14 Index..........................................................................................389
	A.............................................................................................391
	B.............................................................................................391
	C.............................................................................................391
	F.............................................................................................391
	H.............................................................................................391
	I.............................................................................................392
	L.............................................................................................392
	M.............................................................................................393
	O.............................................................................................393
	P.............................................................................................394
	R.............................................................................................394
	S.............................................................................................395
	T.............................................................................................395
	W.............................................................................................395
3_113_006_EN_20130903.pdf.........................................................................  0

Contact us: [email protected]

https://vimeo.com/852092433?share=copy

PLEASE NOTE:

  • This is the same manual used by the dealers to diagnose and troubleshoot your vehicle
  • You will be directed to the download page as soon as the purchase is completed. The whole payment and downloading process will take anywhere between 2-5 minutes
  • Need any other service / repair / parts manual, please feel free to contact [email protected] . We still have 50,000 manuals unlisted

S.V

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order