★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Grove Crane GMK 7450 Mega Wing Lift (MWL) Operating instructions Manual 2084908 – PDF DOWNLOAD

$28.95

Grove Crane GMK 7450 Mega Wing Lift (MWL) Operating instructions Manual 2084908 – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Grove Crane GMK 7450 Mega Wing Lift (MWL) Operating instructions Manual 2084908 – PDF DOWNLOAD

FILE DETAILS:

Grove Crane GMK 7450 Mega Wing Lift (MWL) Operating instructions Manual 2084908 – PDF DOWNLOAD

Language : English
Pages : 350
Downloadable : Yes
File Type : PDF

IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:

Grove Crane GMK 7450 Mega Wing Lift (MWL) Operating instructions Manual 2084908 – PDF DOWNLOAD

About these operating instructions:
Abbreviations used:
These operating instructions describe a load increasing system, which is available as additional
equipment. The system is called Mega Wing Lift and is abbreviated in these operating instructions
to MWL (Mega Wing Lift).

Validity of these operating instructions:

  • These operating instructions only apply to original parts supplied by Deutsche GROVE GmbH and
    describe the operation of the MWL.
  • In addition, operation of the truck crane is also subject to all the specifica- tions in the
    Operating instructions accompanying the GMK 7450 for which the MWL was manufactured.
    For the operation of the truck crane with the lattice extensions described in these operating
    instructions, but without the MWL, the GMK 7450 Lattice extension operating instructions apply.

Prerequisites for assembly and operation:

The MWL described in these operating instructions may only be operated together with a GROVE GMK
7450 truck crane whose serial number is iden- tical with the serial number that is marked on the
MWL.

Safety instructions:

The operation of GMK 7450 with the MWL described in these operating instructions is subject to:
– the basic safety instructions to be found in the subsequent section Basic safety instructions
and
– the safety instructions contained in the operating instructions supplied for the GMK 7450.
References:
Cross references to other operating or maintenance instructions are shown
in the following forms:
à GMK 7450 operating instructions, Part 1 Superstructure – Rigging work
The number for the chapter on Rigging work is found at the front, on the second page of the
operating instructions specified.
or
à GMK 7450 operating instructions – Safe load indicator
The corresponding page number can be found in the index, under the entry
for Safe load indicator.

TABLE OF CONTENTS:

Grove Crane GMK 7450 Mega Wing Lift (MWL) Operating instructions Manual 2084908 – PDF DOWNLOAD

Operating instructions Mega Wing Lift (MWL)...................................................................  1
	Correction sheet: Mega Wing Lift – maintenance............................................................  3
	1 Important information...................................................................................  9
		1.1 About these operating instructions................................................................  9
			Abbreviations used...............................................................................  9
			Validity of theseoperating instructions..........................................................  9
			Prerequisites forassembly and operation..........................................................  9
			Safety instructions..............................................................................  9
			References toother operating instructions........................................................  9
		1.2 Supplementary instructions to the operating instructions for the GMK7450......................... 10
			1.2.1 Addition to the driving mode table.......................................................... 10
			1.2.2 Addition to the Telescoping emergency program submenu....................................... 10
			1.2.3 Addition to applications engineering........................................................ 11
				Thresholds fortheuse of the main hoist...................................................... 11
				Three-part rope holding rod................................................................... 12
				Sheaves for operation with lattice extension................................................. 12
		1.3 Basic safety instructions......................................................................... 13
			1.3.1 Warnings and symbols........................................................................ 13
		1.4 Intended use...................................................................................... 15
		1.5 Organisational measures........................................................................... 17
		1.6 Personnel qualifications.......................................................................... 19
		1.7 Safety instructions for truck crane work.......................................................... 21
	2 Transport dimensions and weights........................................................................ 25
		2.1 Mega Wing Lift (MWL).............................................................................. 25
		2.2 Add-on parts for the truck crane.................................................................. 25
		2.3 Add-on parts for lattice extension................................................................ 26
	3 Scope of delivery and function.......................................................................... 29
		3.1 Scope of delivery................................................................................. 29
			3.1.1 Add-on parts on the main boom............................................................... 30
			3.1.2 MWL and components.......................................................................... 31
		3.2 Function of the MWL............................................................................... 32
	4 Additional operating and display elements............................................................... 37
		4.1 Location of the additional operating and display elements......................................... 37
			4.1.1 Crane control display....................................................................... 37
				In the main menu.............................................................................. 37
				Submenu for Operation – MWL................................................................... 38
				Submenu for Rigging – MWL..................................................................... 40
				In the luffing jib submenu.................................................................... 42
			4.1.2 On the SLI display.......................................................................... 43
			4.1.3 On the hand-held control.................................................................... 44
				Hand-held control............................................................................. 44
				Hand-held control for the MWL................................................................. 45
		4.2 Function of the additional operating and display elements........................................ 47
			4.2.1 In the main menu and in the luffing jib submenu............................................. 47
			4.2.2 In the submenu Operation MWL................................................................ 47
			4.2.3 In the submenu Rigging MWL.................................................................. 56
			4.2.4 On the SLI display – Enter rigging mode submenu............................................. 61
			4.2.5 On the hand-held control.................................................................... 63
				Connections for hand-held control............................................................. 63
				Pre-selection button for rigging............................................................ 64
				Two-hand operating panel...................................................................... 67
	5 MWL – Rigging and unrigging............................................................................. 71
		5.1 Identification and slinging points................................................................ 71
			5.1.1 Identification.............................................................................. 71
			5.1.2 Slinging points............................................................................. 73
				On the MWL.................................................................................... 73
				On the other components....................................................................... 74
		5.2 Checklists for rigging work....................................................................... 75
			5.2.1 CHECKLIST: Rigging the MWL.................................................................. 75
			5.2.2 CHECKLIST: MWL – unrigging.................................................................. 80
		5.3 Rigging work...................................................................................... 85
			5.3.1 Preparing the truck crane................................................................... 85
				For rigging................................................................................... 85
				For unrigging................................................................................. 86
			5.3.2 Installing/removing the rests for the rear pendant links.................................... 87
				Installing the rests......................................................................... 87
				Removing the rests............................................................................ 88
			5.3.3 Moving the rope grab........................................................................ 90
				Moving to the rear bracket.................................................................... 90
				Moving to the front bracket................................................................... 91
			5.3.4 Installing/removing the lateral head sheaves................................................ 92
				Installing the head sheave................................................................... 92
				Removing the head sheave..................................................................... 94
			5.3.5 Using the rigging tool...................................................................... 96
			5.3.6 MWL – Slinging and fastening the guide ropes................................................ 97
				MWL – slinging................................................................................ 97
				Fastening the guide ropes..................................................................... 98
			5.3.7 Push the supports in/out.................................................................... 99
				Pushing in the supports....................................................................... 99
				Pushing out the supports...................................................................... 99
			5.3.8 Establishing/breaking the hydraulic connection between the MWL and the main boom...........101
				Establishing a connection....................................................................101
				Releasing the connection......................................................................102
			5.3.9 MWL – lowering/raising on the main boom.....................................................103
				MWL – lowering................................................................................103
				MWL – raising.................................................................................104
			5.3.10 Connecting/disconnecting the holding frame and main boom...................................105
				Locking the sliding connecting link...........................................................105
				Unlocking the sliding connecting link.........................................................106
			5.3.11 Establishing/disconnecting the hydraulic connection........................................106
				Establishing a connection....................................................................106
				Disconnecting................................................................................108
			5.3.12 Establishing/disconnecting the electrical connection.......................................109
				Establishing connection.......................................................................109
				Breaking connections..........................................................................110
			5.3.13 Connecting/removing the hand-held control.................................................111
				Hand-held control (for serial no. 9020 and above).............................................111
				Hand-held control (up to serial no.9019).....................................................113
			5.3.14 Connecting/disconnecting the raising cylinder and main boom................................115
				Operating the tension ratchets...............................................................115
				Moving the raising cylinder...................................................................116
				Establishing a connection....................................................................118
				Disconnecting ...............................................................................119
			5.3.15 Moving the turnbuckles for the rear pendant links into the position Operation/Transport....120
			5.3.16 Establishing/releasing the connection between the gantry masts and the holding frame.......121
			5.3.17 Moving the deflection sheaves into the position Operation/ Transport.......................122
				Moving into the position Operation............................................................122
				Moving into the Transport position............................................................123
			5.3.18 Running the hoist rope to the main boom head...............................................124
			5.3.19 Positioning/removing the hoist ropes on/from the deflection sheaves........................125
			5.3.20 MWL – raising/setting down.................................................................126
				Preparations..................................................................................126
				MWL – raising.................................................................................126
				Setting down the MWL.........................................................................127
			5.3.21 Positioning/removing the guy ropes.........................................................130
				Positioning the guy ropes....................................................................130
				Removing the guy rope........................................................................132
				Locking/unlocking the winch...................................................................134
				Winding/unwinding the winches.................................................................135
			5.3.22 Securing/releasing the lateral head sheaves................................................136
				Securing......................................................................................136
				Releasing.....................................................................................137
			5.3.23 Transporting the MWL.......................................................................138
		5.4 Operation from the crane cabin during rigging.....................................................139
			5.4.1 In the submenu Rigging – MWL................................................................139
				MWL – raising.................................................................................140
				MWL – setting down...........................................................................141
				Locking the winches...........................................................................143
				Unlocking the winches.........................................................................144
				Winding/unwinding the winches.................................................................145
			5.4.2 In the submenu Operation – MWL..............................................................147
				Folding in the gantry masts...................................................................148
	6 Operation with the main boom and the MWL................................................................151
		6.1 Further rigging work..............................................................................152
			6.1.1 CHECKLIST: Rigging for operation with main boom.............................................152
			6.1.2 CHECKLIST: Unrigging after operation with the main boom.....................................153
			6.1.3 Installing/removing the three-part rope holding rod.........................................154
				Installing....................................................................................154
				Removal.......................................................................................155
			6.1.4 Reeving the hoist rope......................................................................156
				Positioning hoist rope........................................................................156
		6.2 Operation with braced boom system.................................................................159
			6.2.1 CHECKLIST: Bringing the boom system into the operating condition............................159
			6.2.2 CHECKLIST: Bringing the boom system into the rigging mode...................................160
			6.2.3 Setting the SLI.............................................................................161
			6.2.4 Opening the submenu Operation – MWL.........................................................163
			6.2.5 Telescoping with rigged MWL.................................................................164
				Prerequisites.................................................................................164
				Telescoping...................................................................................164
			6.2.6 Folding the gantry masts out/in.............................................................165
				Prerequisites.................................................................................165
				Folding in/folding out.......................................................................165
			6.2.7 Brace the boom system.......................................................................167
				Prerequisites.................................................................................167
				Derricking to the bracing angle..............................................................167
				Bracing.......................................................................................168
			6.2.8 Locking/unlocking the winches...............................................................169
				Lock winches..................................................................................169
				Unlock winches................................................................................170
		6.3 Operation with MWL set down.......................................................................171
			6.3.1 Bringing the boom system into the operating condition.......................................171
				Setting the SLI...............................................................................172
				Telescoping...................................................................................173
				Derricking....................................................................................173
				Operation with the main boom.................................................................173
			6.3.2 Bringing the boom system into the rigging mode..............................................173
		6.4 Operation with unbraced boom system and raised MWL................................................175
			6.4.1 Bringing the boom system into the operating condition.......................................175
				Setting the SLI...............................................................................175
				Telescoping...................................................................................176
				Derricking....................................................................................176
				Operation with the main boom.................................................................176
			6.4.2 Bringing the boom system into the rigging mode..............................................177
		6.5 Driving with rigged truck crane and rigged MWL....................................................179
			6.5.1 Driving route...............................................................................179
			6.5.2 Rigging modes for moving and axle loads.....................................................180
				Bringing the truck crane into the rigging mode................................................180
				Axle load tables.............................................................................181
			6.5.3 Driving the rigged truck crane..............................................................182
				Checking the superstructure lock..............................................................182
				Retracting the outriggers....................................................................182
				Switching over the suspension locking system..................................................182
				Driving.......................................................................................183
				Supporting the truck crane...................................................................184
				If necessary, rig the counterweight sections.................................................184
	7 Operation with boom extension and MWL...................................................................187
		7.1 Further rigging work..............................................................................189
			7.1.1 CHECKLIST: Rigging for operation with boom extension........................................189
			7.1.2 CHECKLIST: Unrigging after operation with the boom extension................................190
			7.1.3 Installing the deflection sheave with support roller........................................191
				Installing the deflection sheave.............................................................191
			7.1.4 Positioning the supporting roller on the foot section.......................................192
			7.1.5 Extra information on positioning the hoist rope with rigged MWL.............................193
		7.2 Operation with braced boom system.................................................................195
			7.2.1 CHECKLIST: Bringing the boom system into the operating condition............................195
			7.2.2 CHECKLIST: Bringing the boom system into the rigging mode...................................196
			7.2.3 Setting the SLI.............................................................................197
		7.3 Operation with MWL set down.......................................................................199
			7.3.1 Bringing the boom system into the operating condition.......................................199
				Setting the SLI...............................................................................200
				Telescoping...................................................................................201
				Working with the boom extension...............................................................201
			7.3.2 Bringing the boom system into the rigging mode..............................................201
		7.4 Rigging mode with unbraced boom system and raised MWL.............................................203
		7.5 Driving with rigged crane and rigged boom extension with rigged MWL...............................205
			7.5.1 Driving route...............................................................................206
			7.5.2 Rigging modes for moving and axle loads.....................................................206
				Bringing the truck crane into the rigging mode................................................206
				12 m-boom extension...........................................................................208
				18 m-boom extension...........................................................................209
				24 m-boom extension...........................................................................210
			7.5.3 Driving the rigged crane....................................................................211
				Checking the superstructure lock..............................................................211
				Retracting the outriggers....................................................................211
				Switching over the suspension locking system..................................................211
				Driving.......................................................................................212
				Supporting the truck crane...................................................................213
				If necessary, rig the counterweight sections..................................................213
	8 Operation with the luffing jib and the MWL..............................................................217
		8.1 Additional display in the submenu Operation – MWL.................................................218
		8.2 Further rigging work..............................................................................219
			8.2.1 CHECKLIST: Rigging for operation with luffing jib...........................................219
			8.2.2 CHECKLIST: Unrigging after operation with the luffing jib...................................221
			8.2.3 Installing the deflection sheave with support roller........................................222
				Installing the deflection sheave.............................................................222
			8.2.4 Positioning the supporting roller on the foot section.......................................223
			8.2.5 Extra information on positioning the hoist rope with rigged MWL.............................224
		8.3 Operation with braced boom system.................................................................225
			8.3.1 CHECKLIST: Bringing the boom system into operating condition................................225
			8.3.2 CHECKLIST: Bringing the boom system into rigging mode.......................................229
			8.3.3 Setting the SLI.............................................................................233
			8.3.4 Derricking main boom with rigged luffing jib and rigged MWL.................................235
			8.3.5 Telescoping main boom with rigged luffing jib and rigged MWL................................236
			8.3.6 Bracing boom system with rigged luffing jib.................................................238
		8.4 Operation with MWL set down.......................................................................239
			8.4.1 Bringing the boom system into the operating condition.......................................239
				Setting the SLI...............................................................................240
				Telescoping...................................................................................241
				Operation with the luffing jib................................................................241
			8.4.2 Bringing the boom system into the rigging mode..............................................241
		8.5 Rigging mode with unbraced boom system and raised MWL.............................................243
		8.6 Driving with rigged crane, rigged luffing jib and rigged MWL.....................................245
			8.6.1 Driving route...............................................................................245
			8.6.2 Rigging modes for moving and axle loads.....................................................246
				Notes on the tables...........................................................................249
				25 m-Luffing jib..............................................................................249
				31 m-Luffing jib.............................................................................250
				37 m-Luffing jib.............................................................................250
				43 m-Luffing jib.............................................................................251
				49 m-Luffing jib.............................................................................251
				55 m-Luffing jib.............................................................................252
				61 m-Luffing jib.............................................................................252
				67 m-Luffing jib.............................................................................253
				73 m-Luffing jib.............................................................................253
			8.6.3 Driving the rigged crane....................................................................255
				Checking the superstructure lock..............................................................255
				Retracting the outriggers....................................................................255
				Switching over the suspension locking system..................................................255
				Driving.......................................................................................256
				Supporting the truck crane...................................................................257
				If necessary, rig the counterweight sections..................................................257
	9 Operation with heavy load lattice extension and MWL.....................................................261
		9.1 Further rigging work..............................................................................263
			9.1.1 Rigging for operation with heavy load lattice extension.....................................263
			9.1.2 Unrigging after operation with the heavy load lattice extension.............................263
			9.1.3 Extra information on positioning the hoist rope with rigged MWL.............................264
		9.2 Operation with braced boom system.................................................................265
			9.2.1 CHECKLIST: Bringing the boom system into operating condition................................265
			9.2.2 CHECKLIST: Bringing the boom system into the rigging mode...................................266
			9.2.3 Setting the SLI.............................................................................267
		9.3 Operation with MWL set down.......................................................................269
			9.3.1 Bringing the boom system into the operating condition.......................................269
				Setting the SLI...............................................................................270
				Telescoping...................................................................................271
				Operation with the heavy load lattice extension...............................................271
			9.3.2 Bringing the boom system into the rigging mode..............................................271
		9.4 Rigging mode with unbraced boom system and raised MWL.............................................273
		9.5 Turning loads with the heavy load lattice extension...............................................275
			9.5.1 Prerequisites...............................................................................276
			9.5.2 Set SLI for turning the load................................................................277
				Entering a reeving............................................................................277
				Set the SLI to the auxiliary hoist............................................................278
			9.5.3 Turning a load..............................................................................279
		9.6 Driving with rigged crane and rigged heavy load lattice extension with rigged MWL................281
			9.6.1 Driving route...............................................................................282
			9.6.2 Rigging modes for moving and axle loads.....................................................282
				Bringing the truck crane into the rigging mode................................................282
				4 m-heavy load lattice extension..............................................................284
				7,5 m-heavy load lattice extension............................................................285
			9.6.3 Driving the rigged crane....................................................................286
				Checking the superstructure lock..............................................................286
				Retracting the outriggers....................................................................286
				Switching over the suspension locking system..................................................286
				Driving.......................................................................................287
				Supporting the truck crane...................................................................288
				If necessary, rig the counterweight sections..................................................288
	10 Malfunctions during operation with the MWL.............................................................291
		10.1 Electrical system................................................................................292
			10.1.1 Fuses......................................................................................292
		10.2 Troubleshooting..................................................................................293
			10.2.1 Malfunctions during operation with the MWL.................................................293
			10.2.2 Malfunctions when operating with the hand-held control.....................................296
			10.2.3 Malfunctions on the SLI....................................................................297
				Check the supply line.........................................................................298
			10.2.4 Error messages on the crane control display................................................299
				Symbols for additional devices...............................................................300
				Allocation of the additional index displays..................................................301
				Error messages via the Can bus................................................................307
				System monitoring group error messages.......................................................308
		10.3 Operation with emergency program switched on.....................................................309
			10.3.1 Operating the MWL in the emergency program.................................................309
				Switching on the emergency program...........................................................309
				Operating the MWL.............................................................................311
			10.3.2 Telescoping in the emergency program with a rigged MWL.....................................312
				When retracting...............................................................................312
				Extending.....................................................................................312
	11 Maintenance work on the MWL............................................................................315
		11.1 Modules in need of protection during cleaning work...............................................315
		11.2 Maintenance plans................................................................................317
			11.2.1 Maintenance plan D: daily..................................................................317
			11.2.2 Maintenance plan W: weekly.................................................................318
			11.2.3 M 3 maintenance plan: Every 3 months / after 300 oper. hrs.................................318
			11.2.4 M 6 maintenance plan: every 6 months / after 500 oper. hrs.................................319
			11.2.5 M 12 maintenance plan: every 12 months / after 1000 oper. hrs..............................319
		11.3 Lubricant table..................................................................................321
		11.4 Maintenance work.................................................................................323
			11.4.1 Checking the position of the guy ropes on the winchdrum...................................323
			11.4.2 Checking the lateral head sheaves.........................................................324
			11.4.3 Checking the winch gears for leaks.........................................................325
			11.4.4 Checking the oil level in the winch gears..................................................325
			11.4.5 Lubricating the joints on the holding frame................................................326
			11.4.6 Checking the end fastenings of the guy ropes...............................................327
				Check at the gantry masts....................................................................327
				Check at the winch drums......................................................................328
			11.4.7 Lubricating the winch gears................................................................329
			11.4.8 Checking the condition of the guy ropes....................................................329
			11.4.9 Lubricating the gear rim...................................................................331
			11.4.10 Lubricating the locking units.............................................................332
			11.4.11 Changing the oil at the winch gears.......................................................333
			11.4.12 Changing the guy ropes....................................................................334
				Prerequisites.................................................................................334
				Rope end fittings on the gantry mast.........................................................335
				Rope end fittings on the winch drums..........................................................336
	12 Index..................................................................................................341
		A.....................................................................................................343
		B.....................................................................................................343
		C.....................................................................................................343
		D.....................................................................................................344
		F.....................................................................................................344
		H.....................................................................................................344
		I.....................................................................................................344
		L.....................................................................................................344
		M.....................................................................................................344
		O.....................................................................................................345
		R.....................................................................................................347
		S.....................................................................................................348
		T.....................................................................................................348

Questions? Email us: [email protected]

PLEASE NOTE:

  • This is not a physical manual but a digital manual – meaning no physical copy will be couriered to you. The manual can be yours in the next 2 mins as once you make the payment, you will be directed to the download page IMMEDIATELY.
  • This is the same manual used by the dealers inorder to diagnose your vehicle of its faults.
  • Require some other service manual or have any queries: please WRITE to us at [email protected]

S.V

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order