Grove Crane GMK 7450 Mega Wing Lift (MWL) Operating instructions Manual 2084908 – PDF DOWNLOAD
$28.95
Grove Crane GMK 7450 Mega Wing Lift (MWL) Operating instructions Manual 2084908 – PDF DOWNLOAD
Description
Grove Crane GMK 7450 Mega Wing Lift (MWL) Operating instructions Manual 2084908 – PDF DOWNLOAD
FILE DETAILS:
Grove Crane GMK 7450 Mega Wing Lift (MWL) Operating instructions Manual 2084908 – PDF DOWNLOAD
Language : English
Pages : 350
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:
Grove Crane GMK 7450 Mega Wing Lift (MWL) Operating instructions Manual 2084908 – PDF DOWNLOAD
About these operating instructions:
Abbreviations used:
These operating instructions describe a load increasing system, which is available as additional
equipment. The system is called Mega Wing Lift and is abbreviated in these operating instructions
to MWL (Mega Wing Lift).
Validity of these operating instructions:
- These operating instructions only apply to original parts supplied by Deutsche GROVE GmbH and
describe the operation of the MWL. - In addition, operation of the truck crane is also subject to all the specifica- tions in the
Operating instructions accompanying the GMK 7450 for which the MWL was manufactured.
For the operation of the truck crane with the lattice extensions described in these operating
instructions, but without the MWL, the GMK 7450 Lattice extension operating instructions apply.
Prerequisites for assembly and operation:
The MWL described in these operating instructions may only be operated together with a GROVE GMK
7450 truck crane whose serial number is iden- tical with the serial number that is marked on the
MWL.
Safety instructions:
The operation of GMK 7450 with the MWL described in these operating instructions is subject to:
– the basic safety instructions to be found in the subsequent section Basic safety instructions
and
– the safety instructions contained in the operating instructions supplied for the GMK 7450.
References:
Cross references to other operating or maintenance instructions are shown
in the following forms:
à GMK 7450 operating instructions, Part 1 Superstructure – Rigging work
The number for the chapter on Rigging work is found at the front, on the second page of the
operating instructions specified.
or
à GMK 7450 operating instructions – Safe load indicator
The corresponding page number can be found in the index, under the entry
for Safe load indicator.
TABLE OF CONTENTS:
Grove Crane GMK 7450 Mega Wing Lift (MWL) Operating instructions Manual 2084908 – PDF DOWNLOAD
Operating instructions Mega Wing Lift (MWL)................................................................... 1 Correction sheet: Mega Wing Lift – maintenance............................................................ 3 1 Important information................................................................................... 9 1.1 About these operating instructions................................................................ 9 Abbreviations used............................................................................... 9 Validity of theseoperating instructions.......................................................... 9 Prerequisites forassembly and operation.......................................................... 9 Safety instructions.............................................................................. 9 References toother operating instructions........................................................ 9 1.2 Supplementary instructions to the operating instructions for the GMK7450......................... 10 1.2.1 Addition to the driving mode table.......................................................... 10 1.2.2 Addition to the Telescoping emergency program submenu....................................... 10 1.2.3 Addition to applications engineering........................................................ 11 Thresholds fortheuse of the main hoist...................................................... 11 Three-part rope holding rod................................................................... 12 Sheaves for operation with lattice extension................................................. 12 1.3 Basic safety instructions......................................................................... 13 1.3.1 Warnings and symbols........................................................................ 13 1.4 Intended use...................................................................................... 15 1.5 Organisational measures........................................................................... 17 1.6 Personnel qualifications.......................................................................... 19 1.7 Safety instructions for truck crane work.......................................................... 21 2 Transport dimensions and weights........................................................................ 25 2.1 Mega Wing Lift (MWL).............................................................................. 25 2.2 Add-on parts for the truck crane.................................................................. 25 2.3 Add-on parts for lattice extension................................................................ 26 3 Scope of delivery and function.......................................................................... 29 3.1 Scope of delivery................................................................................. 29 3.1.1 Add-on parts on the main boom............................................................... 30 3.1.2 MWL and components.......................................................................... 31 3.2 Function of the MWL............................................................................... 32 4 Additional operating and display elements............................................................... 37 4.1 Location of the additional operating and display elements......................................... 37 4.1.1 Crane control display....................................................................... 37 In the main menu.............................................................................. 37 Submenu for Operation – MWL................................................................... 38 Submenu for Rigging – MWL..................................................................... 40 In the luffing jib submenu.................................................................... 42 4.1.2 On the SLI display.......................................................................... 43 4.1.3 On the hand-held control.................................................................... 44 Hand-held control............................................................................. 44 Hand-held control for the MWL................................................................. 45 4.2 Function of the additional operating and display elements........................................ 47 4.2.1 In the main menu and in the luffing jib submenu............................................. 47 4.2.2 In the submenu Operation MWL................................................................ 47 4.2.3 In the submenu Rigging MWL.................................................................. 56 4.2.4 On the SLI display – Enter rigging mode submenu............................................. 61 4.2.5 On the hand-held control.................................................................... 63 Connections for hand-held control............................................................. 63 Pre-selection button for rigging............................................................ 64 Two-hand operating panel...................................................................... 67 5 MWL – Rigging and unrigging............................................................................. 71 5.1 Identification and slinging points................................................................ 71 5.1.1 Identification.............................................................................. 71 5.1.2 Slinging points............................................................................. 73 On the MWL.................................................................................... 73 On the other components....................................................................... 74 5.2 Checklists for rigging work....................................................................... 75 5.2.1 CHECKLIST: Rigging the MWL.................................................................. 75 5.2.2 CHECKLIST: MWL – unrigging.................................................................. 80 5.3 Rigging work...................................................................................... 85 5.3.1 Preparing the truck crane................................................................... 85 For rigging................................................................................... 85 For unrigging................................................................................. 86 5.3.2 Installing/removing the rests for the rear pendant links.................................... 87 Installing the rests......................................................................... 87 Removing the rests............................................................................ 88 5.3.3 Moving the rope grab........................................................................ 90 Moving to the rear bracket.................................................................... 90 Moving to the front bracket................................................................... 91 5.3.4 Installing/removing the lateral head sheaves................................................ 92 Installing the head sheave................................................................... 92 Removing the head sheave..................................................................... 94 5.3.5 Using the rigging tool...................................................................... 96 5.3.6 MWL – Slinging and fastening the guide ropes................................................ 97 MWL – slinging................................................................................ 97 Fastening the guide ropes..................................................................... 98 5.3.7 Push the supports in/out.................................................................... 99 Pushing in the supports....................................................................... 99 Pushing out the supports...................................................................... 99 5.3.8 Establishing/breaking the hydraulic connection between the MWL and the main boom...........101 Establishing a connection....................................................................101 Releasing the connection......................................................................102 5.3.9 MWL – lowering/raising on the main boom.....................................................103 MWL – lowering................................................................................103 MWL – raising.................................................................................104 5.3.10 Connecting/disconnecting the holding frame and main boom...................................105 Locking the sliding connecting link...........................................................105 Unlocking the sliding connecting link.........................................................106 5.3.11 Establishing/disconnecting the hydraulic connection........................................106 Establishing a connection....................................................................106 Disconnecting................................................................................108 5.3.12 Establishing/disconnecting the electrical connection.......................................109 Establishing connection.......................................................................109 Breaking connections..........................................................................110 5.3.13 Connecting/removing the hand-held control.................................................111 Hand-held control (for serial no. 9020 and above).............................................111 Hand-held control (up to serial no.9019).....................................................113 5.3.14 Connecting/disconnecting the raising cylinder and main boom................................115 Operating the tension ratchets...............................................................115 Moving the raising cylinder...................................................................116 Establishing a connection....................................................................118 Disconnecting ...............................................................................119 5.3.15 Moving the turnbuckles for the rear pendant links into the position Operation/Transport....120 5.3.16 Establishing/releasing the connection between the gantry masts and the holding frame.......121 5.3.17 Moving the deflection sheaves into the position Operation/ Transport.......................122 Moving into the position Operation............................................................122 Moving into the Transport position............................................................123 5.3.18 Running the hoist rope to the main boom head...............................................124 5.3.19 Positioning/removing the hoist ropes on/from the deflection sheaves........................125 5.3.20 MWL – raising/setting down.................................................................126 Preparations..................................................................................126 MWL – raising.................................................................................126 Setting down the MWL.........................................................................127 5.3.21 Positioning/removing the guy ropes.........................................................130 Positioning the guy ropes....................................................................130 Removing the guy rope........................................................................132 Locking/unlocking the winch...................................................................134 Winding/unwinding the winches.................................................................135 5.3.22 Securing/releasing the lateral head sheaves................................................136 Securing......................................................................................136 Releasing.....................................................................................137 5.3.23 Transporting the MWL.......................................................................138 5.4 Operation from the crane cabin during rigging.....................................................139 5.4.1 In the submenu Rigging – MWL................................................................139 MWL – raising.................................................................................140 MWL – setting down...........................................................................141 Locking the winches...........................................................................143 Unlocking the winches.........................................................................144 Winding/unwinding the winches.................................................................145 5.4.2 In the submenu Operation – MWL..............................................................147 Folding in the gantry masts...................................................................148 6 Operation with the main boom and the MWL................................................................151 6.1 Further rigging work..............................................................................152 6.1.1 CHECKLIST: Rigging for operation with main boom.............................................152 6.1.2 CHECKLIST: Unrigging after operation with the main boom.....................................153 6.1.3 Installing/removing the three-part rope holding rod.........................................154 Installing....................................................................................154 Removal.......................................................................................155 6.1.4 Reeving the hoist rope......................................................................156 Positioning hoist rope........................................................................156 6.2 Operation with braced boom system.................................................................159 6.2.1 CHECKLIST: Bringing the boom system into the operating condition............................159 6.2.2 CHECKLIST: Bringing the boom system into the rigging mode...................................160 6.2.3 Setting the SLI.............................................................................161 6.2.4 Opening the submenu Operation – MWL.........................................................163 6.2.5 Telescoping with rigged MWL.................................................................164 Prerequisites.................................................................................164 Telescoping...................................................................................164 6.2.6 Folding the gantry masts out/in.............................................................165 Prerequisites.................................................................................165 Folding in/folding out.......................................................................165 6.2.7 Brace the boom system.......................................................................167 Prerequisites.................................................................................167 Derricking to the bracing angle..............................................................167 Bracing.......................................................................................168 6.2.8 Locking/unlocking the winches...............................................................169 Lock winches..................................................................................169 Unlock winches................................................................................170 6.3 Operation with MWL set down.......................................................................171 6.3.1 Bringing the boom system into the operating condition.......................................171 Setting the SLI...............................................................................172 Telescoping...................................................................................173 Derricking....................................................................................173 Operation with the main boom.................................................................173 6.3.2 Bringing the boom system into the rigging mode..............................................173 6.4 Operation with unbraced boom system and raised MWL................................................175 6.4.1 Bringing the boom system into the operating condition.......................................175 Setting the SLI...............................................................................175 Telescoping...................................................................................176 Derricking....................................................................................176 Operation with the main boom.................................................................176 6.4.2 Bringing the boom system into the rigging mode..............................................177 6.5 Driving with rigged truck crane and rigged MWL....................................................179 6.5.1 Driving route...............................................................................179 6.5.2 Rigging modes for moving and axle loads.....................................................180 Bringing the truck crane into the rigging mode................................................180 Axle load tables.............................................................................181 6.5.3 Driving the rigged truck crane..............................................................182 Checking the superstructure lock..............................................................182 Retracting the outriggers....................................................................182 Switching over the suspension locking system..................................................182 Driving.......................................................................................183 Supporting the truck crane...................................................................184 If necessary, rig the counterweight sections.................................................184 7 Operation with boom extension and MWL...................................................................187 7.1 Further rigging work..............................................................................189 7.1.1 CHECKLIST: Rigging for operation with boom extension........................................189 7.1.2 CHECKLIST: Unrigging after operation with the boom extension................................190 7.1.3 Installing the deflection sheave with support roller........................................191 Installing the deflection sheave.............................................................191 7.1.4 Positioning the supporting roller on the foot section.......................................192 7.1.5 Extra information on positioning the hoist rope with rigged MWL.............................193 7.2 Operation with braced boom system.................................................................195 7.2.1 CHECKLIST: Bringing the boom system into the operating condition............................195 7.2.2 CHECKLIST: Bringing the boom system into the rigging mode...................................196 7.2.3 Setting the SLI.............................................................................197 7.3 Operation with MWL set down.......................................................................199 7.3.1 Bringing the boom system into the operating condition.......................................199 Setting the SLI...............................................................................200 Telescoping...................................................................................201 Working with the boom extension...............................................................201 7.3.2 Bringing the boom system into the rigging mode..............................................201 7.4 Rigging mode with unbraced boom system and raised MWL.............................................203 7.5 Driving with rigged crane and rigged boom extension with rigged MWL...............................205 7.5.1 Driving route...............................................................................206 7.5.2 Rigging modes for moving and axle loads.....................................................206 Bringing the truck crane into the rigging mode................................................206 12 m-boom extension...........................................................................208 18 m-boom extension...........................................................................209 24 m-boom extension...........................................................................210 7.5.3 Driving the rigged crane....................................................................211 Checking the superstructure lock..............................................................211 Retracting the outriggers....................................................................211 Switching over the suspension locking system..................................................211 Driving.......................................................................................212 Supporting the truck crane...................................................................213 If necessary, rig the counterweight sections..................................................213 8 Operation with the luffing jib and the MWL..............................................................217 8.1 Additional display in the submenu Operation – MWL.................................................218 8.2 Further rigging work..............................................................................219 8.2.1 CHECKLIST: Rigging for operation with luffing jib...........................................219 8.2.2 CHECKLIST: Unrigging after operation with the luffing jib...................................221 8.2.3 Installing the deflection sheave with support roller........................................222 Installing the deflection sheave.............................................................222 8.2.4 Positioning the supporting roller on the foot section.......................................223 8.2.5 Extra information on positioning the hoist rope with rigged MWL.............................224 8.3 Operation with braced boom system.................................................................225 8.3.1 CHECKLIST: Bringing the boom system into operating condition................................225 8.3.2 CHECKLIST: Bringing the boom system into rigging mode.......................................229 8.3.3 Setting the SLI.............................................................................233 8.3.4 Derricking main boom with rigged luffing jib and rigged MWL.................................235 8.3.5 Telescoping main boom with rigged luffing jib and rigged MWL................................236 8.3.6 Bracing boom system with rigged luffing jib.................................................238 8.4 Operation with MWL set down.......................................................................239 8.4.1 Bringing the boom system into the operating condition.......................................239 Setting the SLI...............................................................................240 Telescoping...................................................................................241 Operation with the luffing jib................................................................241 8.4.2 Bringing the boom system into the rigging mode..............................................241 8.5 Rigging mode with unbraced boom system and raised MWL.............................................243 8.6 Driving with rigged crane, rigged luffing jib and rigged MWL.....................................245 8.6.1 Driving route...............................................................................245 8.6.2 Rigging modes for moving and axle loads.....................................................246 Notes on the tables...........................................................................249 25 m-Luffing jib..............................................................................249 31 m-Luffing jib.............................................................................250 37 m-Luffing jib.............................................................................250 43 m-Luffing jib.............................................................................251 49 m-Luffing jib.............................................................................251 55 m-Luffing jib.............................................................................252 61 m-Luffing jib.............................................................................252 67 m-Luffing jib.............................................................................253 73 m-Luffing jib.............................................................................253 8.6.3 Driving the rigged crane....................................................................255 Checking the superstructure lock..............................................................255 Retracting the outriggers....................................................................255 Switching over the suspension locking system..................................................255 Driving.......................................................................................256 Supporting the truck crane...................................................................257 If necessary, rig the counterweight sections..................................................257 9 Operation with heavy load lattice extension and MWL.....................................................261 9.1 Further rigging work..............................................................................263 9.1.1 Rigging for operation with heavy load lattice extension.....................................263 9.1.2 Unrigging after operation with the heavy load lattice extension.............................263 9.1.3 Extra information on positioning the hoist rope with rigged MWL.............................264 9.2 Operation with braced boom system.................................................................265 9.2.1 CHECKLIST: Bringing the boom system into operating condition................................265 9.2.2 CHECKLIST: Bringing the boom system into the rigging mode...................................266 9.2.3 Setting the SLI.............................................................................267 9.3 Operation with MWL set down.......................................................................269 9.3.1 Bringing the boom system into the operating condition.......................................269 Setting the SLI...............................................................................270 Telescoping...................................................................................271 Operation with the heavy load lattice extension...............................................271 9.3.2 Bringing the boom system into the rigging mode..............................................271 9.4 Rigging mode with unbraced boom system and raised MWL.............................................273 9.5 Turning loads with the heavy load lattice extension...............................................275 9.5.1 Prerequisites...............................................................................276 9.5.2 Set SLI for turning the load................................................................277 Entering a reeving............................................................................277 Set the SLI to the auxiliary hoist............................................................278 9.5.3 Turning a load..............................................................................279 9.6 Driving with rigged crane and rigged heavy load lattice extension with rigged MWL................281 9.6.1 Driving route...............................................................................282 9.6.2 Rigging modes for moving and axle loads.....................................................282 Bringing the truck crane into the rigging mode................................................282 4 m-heavy load lattice extension..............................................................284 7,5 m-heavy load lattice extension............................................................285 9.6.3 Driving the rigged crane....................................................................286 Checking the superstructure lock..............................................................286 Retracting the outriggers....................................................................286 Switching over the suspension locking system..................................................286 Driving.......................................................................................287 Supporting the truck crane...................................................................288 If necessary, rig the counterweight sections..................................................288 10 Malfunctions during operation with the MWL.............................................................291 10.1 Electrical system................................................................................292 10.1.1 Fuses......................................................................................292 10.2 Troubleshooting..................................................................................293 10.2.1 Malfunctions during operation with the MWL.................................................293 10.2.2 Malfunctions when operating with the hand-held control.....................................296 10.2.3 Malfunctions on the SLI....................................................................297 Check the supply line.........................................................................298 10.2.4 Error messages on the crane control display................................................299 Symbols for additional devices...............................................................300 Allocation of the additional index displays..................................................301 Error messages via the Can bus................................................................307 System monitoring group error messages.......................................................308 10.3 Operation with emergency program switched on.....................................................309 10.3.1 Operating the MWL in the emergency program.................................................309 Switching on the emergency program...........................................................309 Operating the MWL.............................................................................311 10.3.2 Telescoping in the emergency program with a rigged MWL.....................................312 When retracting...............................................................................312 Extending.....................................................................................312 11 Maintenance work on the MWL............................................................................315 11.1 Modules in need of protection during cleaning work...............................................315 11.2 Maintenance plans................................................................................317 11.2.1 Maintenance plan D: daily..................................................................317 11.2.2 Maintenance plan W: weekly.................................................................318 11.2.3 M 3 maintenance plan: Every 3 months / after 300 oper. hrs.................................318 11.2.4 M 6 maintenance plan: every 6 months / after 500 oper. hrs.................................319 11.2.5 M 12 maintenance plan: every 12 months / after 1000 oper. hrs..............................319 11.3 Lubricant table..................................................................................321 11.4 Maintenance work.................................................................................323 11.4.1 Checking the position of the guy ropes on the winchdrum...................................323 11.4.2 Checking the lateral head sheaves.........................................................324 11.4.3 Checking the winch gears for leaks.........................................................325 11.4.4 Checking the oil level in the winch gears..................................................325 11.4.5 Lubricating the joints on the holding frame................................................326 11.4.6 Checking the end fastenings of the guy ropes...............................................327 Check at the gantry masts....................................................................327 Check at the winch drums......................................................................328 11.4.7 Lubricating the winch gears................................................................329 11.4.8 Checking the condition of the guy ropes....................................................329 11.4.9 Lubricating the gear rim...................................................................331 11.4.10 Lubricating the locking units.............................................................332 11.4.11 Changing the oil at the winch gears.......................................................333 11.4.12 Changing the guy ropes....................................................................334 Prerequisites.................................................................................334 Rope end fittings on the gantry mast.........................................................335 Rope end fittings on the winch drums..........................................................336 12 Index..................................................................................................341 A.....................................................................................................343 B.....................................................................................................343 C.....................................................................................................343 D.....................................................................................................344 F.....................................................................................................344 H.....................................................................................................344 I.....................................................................................................344 L.....................................................................................................344 M.....................................................................................................344 O.....................................................................................................345 R.....................................................................................................347 S.....................................................................................................348 T.....................................................................................................348
Questions? Email us: [email protected]
PLEASE NOTE:
- This is not a physical manual but a digital manual – meaning no physical copy will be couriered to you. The manual can be yours in the next 2 mins as once you make the payment, you will be directed to the download page IMMEDIATELY.
- This is the same manual used by the dealers inorder to diagnose your vehicle of its faults.
- Require some other service manual or have any queries: please WRITE to us at [email protected]
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Grove Crane GMK 5100 Operating Instructions Manual Part 1 (Carrier) - PDF DOWNLOAD

Grove GMK5100 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

Grove GMK 5220 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD
