Operator & Safety Handbook for Grove RT 700E Series Crane PDF
$19.95
Grove Crane RT 700E Series Operator’s & Safety Handbook Manual – PDF DOWNLOAD
Description
Grove Crane RT 700E Series Operator’s & Safety Handbook Manual – PDF DOWNLOAD
FILE DETAILS:
Grove Crane RT 700E Series Operator’s & Safety Handbook Manual – PDF DOWNLOAD
Language : English
Pages : 92
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:
Grove Crane RT 700E Series Operator’s & Safety Handbook Manual – PDF DOWNLOAD
Section 1 β’ INTRODUCTION
GENERAL 1-1
NOISE VIBRATION TEST RESULTS 1-1
Section 2: SAFETY PRECAUTIONS
GENERAL 2-1
OPERATOR’S INFORMATION 2-1
OPERATOR’S QUALIFICATIONS 2-2
CRANE STABILITY/STRUCTURAL STRENGTH 2-3
Load Charts 2-3
Work Site 2-4
Lifting Operations 2-4
Counterweight 2-6
Multiple Crane Lifts 2-6
LOAD MOMENT INDICATING SYSTEMS 2-6
Two-Blocking 2-6
Work Area Definition System 2-7
ELECTROCUTION HAZARD 2-7
Set Up and Operation 2-8
Electrocution Hazard Devices 2-8
Electrical Contact 2-9
Special Operating Conditions and Equipment 2-9
CRUSHING HAZARDS 2-1 Π
PERSONNEL HANDLING 2-11
TRAVEL OPERATION 2-11
MAINTENANCE 2-12
Service and Repairs 2-12
Lubrication 2-13
Tires 2-13
Wire Rope 2-13
BAΠ’Π’ERIES 2-14
ENGINE 2-15
WORK PRACTICES 2-15
Crane Access 2-15
Job Preparation 2-15
Working 2-15
Lifting 2-16
Hand Signals 2-17
TRANSPORTING Π’ΠΠ CRANE 2-17
SHUTDOWN 2-17
ΠΠΠΠ EXTENSION/JIB 2-18
COLD WEATHER OPERATION 2-19
Section 3 β’ Π‘ΠΠ CONTROLS AND INDICATORS
ENGINE CONTROLS AND INDICATORS 3-1
Hand Throttle Lock Control 3-1
Engine Oil Pressure Gauge 3-1
Transmission Oil Temperature Gauge 3-1
Fuel Gauge 3-1
Voltmeter 3-1
lgnition Switch 3-1
Tachometer β’ 3-4
V
TABLE OF CONTENTS (CONTINUED)
Page
Engine Coolant Temperature Gauge Π-4
Foot Throttle Pedal 3-4
Drivetrain Distress lndicator 3-4
Hourmeter (Not Shown) Π-4
CRANE CONTROLS AND INDICATORS 3-4
Crane Function Power Switch 3-4
Transmission Shift Lever 3-4
Telescope or Auxiliary Hoist Control Lever 3-4
Swing Control Lever 3-4
Rear Steer Control Switch 3-4
Rear Wheels Not Centered lndicator 3-5
Main Hoist Speed Selector Switch 3-5
Auxiliary Hoist Speed Selector Switch (Optional) Π-5
Auxiliary Hoist Switch (Optional) 3-5
Boom Lift Control Lever 3-5
Main Hoist Control Lever 3-5
Telescope Control Pedal (Optional) 3-5
Hydraulic Boost Switch 3-5
Hoist 3rd Wrap lndicator (Optional w/CE) 3-5
Hoist Rotation lndicators 3-5
Transmission Range Selector Switch Π-5
Differential Lock Control Switch {Optional) 3-6
Outrigger Selector Panel 3-6
Outrigger Extend/Retract Switch 3-6
Swing Brake Control Switch 3-6
Swing Brake Pedal 3-6
Brake Foot Pedal 3-6
Main Brake Fail lndicator 3-6
Park Brake Control Switch 3-6
Pin Swing Lock Control (Pin Π’ΡΡΠ΅) 3-7
360 Degree Swing Lock Control (Positive Lock Π’ΡΡΠ΅) (Optional) 3-7
Load Moment lndicating (LMI) and Work Area Definition System Control Panel 3-7
ACCESSORY CONTROLS AND INDICATORS 3-7
Headlights Switch 3-7
Boom Light Switch (Optional) 3-7
Work Light Switch 3-7
Π‘Π°Π¬ Circulating Fan 3-7
Horn 3-7
Backup Alarm (Not Shown) 3-7
Turn Signal Lever and Windshield Wiper/Washer Controls 3-7
Hazard Lights Switch 3-7
Right Turn Signal lndicator 3-8
Left Turn Signal lndicator 3-8
Π‘Π°Π¬ Dome Light 3-8
Skylight Wiper (Not Shown) 3-8
ΠuΠ¬Π«Π΅ Level lndicator 3-8
Heat Control Knob 3-8
Fan Switch 3-8
Defroster Switch 3-8
Air Conditioning Control Switch (Optional) 3-8
vi
TABLE OF CONTENTS (CONTINUED)
Page
Spotlight (Optional) β’ Π-8
Beacon Light (Optional) (Not Shown) β’ β’ β’ Π-8
Fire Extinguisher β’ β’ β’ β’ β’ β’ β’ β’ 3-8
Defroster Fan β’ Π-8
Windshield Wiper β’ β’ Π-8
12 VDC Accessory Outlet β’ β’ β’β’ Π-9
Circuit Breaker Panel β’ Π-9
Section 4 – OPERATING PROCEDURES
PRE-STARTING CHECKS β’ β’ 4-1
Fuel Supply β’ 4-1
Engine Oil 4-1
Engine Coolant β’ 4-1
Batteries β’ 4-1
Signal and Running Lights 4-1
Foot and Parking Brakes β’ 4-1
Daily Lubrication β’ 4-1
Hydraulic Reservoir and Filter 4-1
Tires 4-1
Wire Rope β’ β’ β’ β’ 4-1
Hook Block β’ β’ β’β’ 4-1
Air Cleaner β’ β’ 4-1
COLD WEATHER OPERATION β’ 4-1
Operation Below -40Β°Π‘ β’ β’ β’ β’ β’ 4-2
Operation Be\ow -40Β°F β’ β’ β’ β’ β’ β’ β’ β’ 4-2
ENGINE OPERATION β’ 4-2
Starting Procedure β’β’ β’ 4-2
Cold Weather Starting β’ 4-2
ldling the Engine 4-Π
Racing the Engine β’ β’ β’ 4-3
Shutdown Procedure β’ 4-Π
CRANE TRAVEL OPERATION β’ β’ 4-Π
Traveling – General β’ β’ β’ β’ β’ 4-Π
Traveling With Boom Extension Erected 4-4
Extended Travel 4-4
Moving the Crane β’ β’ 4-4
Steering β’β’ β’ β’ 4-4
Front Wheel Steering β’ β’ β’β’ 4-5
Rear Wheel Steering β’ 4-5
Four Wheel Steering β’ β’ β’ β’ 4-5
Crabblng β’ β’β’ β’ β’ β’β’ β’ 4-5
Traveling – Forward β’β’ β’ β’ β’ β’ β’ β’β’ 4-5
Traveling – Reverse β’ β’ β’ 4-5
Four-Wheel Drive Operation 4-6
Proper Operation Of Differential Lock 4-6
General β’ β’ β’ 4-6
Operation 4-6
Proper Operation Of Axle Oscillation Lockouts β’ β’ 4-7
GENERAL CRANE OPERATION β’ β’ 4-7
Pump Drive β’ β’ β’ β’ 4-7
Setting the Park Brake When Crane is ΠΎΠΏ Outriggers β’β’ β’β’ 4-7
vii
TABLE OF CONTENTS {CONTINUED)
Page
Control Lever Operation 4-7
Preload Check 4-8
USING YOUR LOAD CHART 4-8
CRANE FUNCTIONS 4-9
Setting the Outriggers 4-9
Engaging the Mid-Extend Lock Pin 4-1 Π
Stowing the Outriggers 4-1 Π
Stowing the Mid-Extend Lock Pin 4-1 Π
Swinging the Boom 4-11
Elevating and Lowering the Boom 4-11
Elevating the Boom 4-11
Lowering the Boom 4-11
Telescoping the Boom 4-11
Extending the Boom 4-11
Retracting the Boom 4-12
Telescope Control Pedal 4-12
Lowering and Raising the Π‘Π°Π«Π΅ 4-12
Lowering the Π‘Π°Π«Π΅ 4-12
Raising the Π‘Π°Π«Π΅ 4-12
Hoist Speed Range Selection 4-12
Operational Aids 4-12
Load Moment lndicator (LMI) System 4-12
Control Lever Lockout System 4-1 Π
Stowing Π°ΠΏd Parking 4-1 Π
Section 5 β’ LUBRICATION
GENERAL 5-1
LURICANTS 5-1
LUBRICATION POINTS 5-Π
WIRE ROPE LUBRICATION 5-9
Section 6 β’ SET-UP AND INSTALLATION PROCEDURES
GENERAL 6-1
INSTALLING CABLE ON Π’ΠΠ HOIST 6-1
CABLE REEVING 6-1
DEAD-END RIGGING/WEDGE SOCKETS 6-6
lnstalling Wedge Π°ΠΏd Socket 6-6
ERECTING AND STOWING Π’ΠΠ SWINGAWAY ΠΠΠΠ EXΠ’ENSION 6-8
Erecting 6-8
Stowing 6-1 5
Setting The Folding Swingaway Offset 6-16
ERECTING AND STOW/NG Π’ΠΠ SWINGAWAY ΠΠΠΠ EXTENSION USING Π’ΠΠ 6 1 Π (20 FOOT) INSERT 6-17
Erecting 6-17
Stowing 6-19
S.V 06/24Β Β
What Our Customers Say
π Related Products
Discover more professional manuals for your equipment

Grove GMK5100 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

Grove GMK4075-1 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

Grove GMK4075 Operating Instructions Manual Part 1 (Carrier) - PDF DOWNLOAD
