Grove Crane TM 750 E Superstructure Operator’s Manual – PDF DOWNLOAD
$26.95
Grove Crane TM 750 E Superstructure Operator’s Manual – PDF DOWNLOAD
Description
Grove Crane TM 750 E Superstructure Operator’s Manual – PDF DOWNLOAD
FILE DETAILS:
Grove Crane TM 750 E Superstructure Operator’s Manual – PDF DOWNLOAD
Language : English
Pages : 172
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:
Grove Crane TM 750 E Superstructure Operator’s Manual – PDF DOWNLOAD
GENERAL
INTRODUCTION 1 1
LISΠ’ OF SPECIFICAilONS 1″3
SECΠ’JON 11
SAFEΠ’Y PRECAUTIONS
OENERAL ” 2-1
CRANJNG OPERATION Β· 2-9
Jl8S 2 ’34
WIRe ROPE AND $Hi;AVES 2-35
CONTROtLeD FREE FALI HOIST 2-40
ELl:CTRICAI HAZARDS 241
PERSONNEL PLATFORMS 2-56
COLDWEATHER OPERATJON ~ 2 67
DON”Π’’ FORGET f 111 – -2Β·58
SECTJON 111
DESCR IPΠ’ION
GENERAL Β· Π 1
MAJQR COMPONENTS AND SVSTEMS 3-1
Π‘Π°Π¬ AssemΠ«y 11111 11111 4 Π-1
Hydraulic System and Camponents Π-2
Reservoir – Π -2
DirectlonΠ²J Controt VoJves 3-2
Hydnaullc Boost Circuit Π 2
iurnttΠ«e AssemΠ«y and Swing Mechanism Π-2
Swlng BrakΠ² 11111 – 4 Β· – 3–3
Sw-ing Motor Π 3
Swing GearΠ¬ox 3-Π
Boom AssemΠ«y ~ ~ 3–3
Matn Holst “” + Π- Π
01t-trigger System ~ 3–Π
Counterweight – 3-4
ix
SwiVtlt ~ 3-4
OPΠ’10NAL EQUIPMENT 3-4
Revotving Light _ ~ 3-4
AuxiJia ry Hoi:st Π -5
Outrigger Stabllizer Spin-Π’ΡΡΠ΅ tocks 3-5
Swingaway Exten!icn Π· 5
Bo otn Fioodligh’tl ” Π S
Spodight Π° 3-5
1:lectrical Skylight Wiper ~ Π-9
Boom Elevation I ndicator Π-9
ENGINE C0NTR0LS AND tN0ICAT0RS Π-9
High Water Temperature/Lw Oil Preuure lndicator
(C Um111in1 Π ngine) “‘ 3-9
Water Temperature Gauge (Cummins l: nginc) Π-9
Engine Oit P~sure Gauge 3-9
Engine Distress lndicator {Deu1Z Engine) Π-1 Π
Tachometet Β· ” 3Β·1 Π
Voltmeter ‘ ~ Π -1 Π
f uel Qu antity Gauge ~ 3 1 D
lgnltlon Switch 3-11
IQnitionOn lndic:ator : j Π·”11
Throttle Lock Control Π 1 l
Foot Throttle Pedal 3-1 1
Erigine Ouick Start System (OptionaH Π-12
ACCESSORV CONTROLS AND INDICATORS ‘ ” Π-12
lnstrument Lights Switth Π-12
Wind$hleld Wiper/Washer Switch Π 12
Π‘Π°Π¬ Circu:la’don Fan 1 ΠΒ· 12
DomeligQt Β· Π· 12
Panel LigЬtand Switc:h Д12
Fi – Extinguisher Β· 3 13
Defrorter Controf (Cummins Engine) Π-13
Heate – Ternperature Control {Cummins Engine) Π-13
Heater Fan Switch tCummjns Enginet Π-13
Beacon light Sw itch (OptiontilJ 3 13
Boom LlghtSwitch {Optional) Π-13
Spotlight and Switch (Optional) Π-13
Manual Skyli ght Wipe-r Π-1 :1
Electric Skylight Wiper (Optionali Π 14
CRANING CONTROLS AND INDICATORS _ 3-14
Swing H~rn Button 11’ ΠΎ11 Π-14
Swing Control lever and PedaL Π-14
Ρ
Fron~ StaΠ¬ilizer Overlo-‘ lndicator Π-14
ΠuΠ¬Π«Π΅ Lever lndicmtor ~3-14
Outrigger Control Pancl 3-14
Swing Braka Pedal Π-15
Sw1ng Brake Control Valve Π-15
Main Hoist Control Lever Π-15
Auxiliary Hoi s’t Control Lewer (Optional) 3Β·15
Boom Elevation Control Lever and Ptdal Π-15
lnner-Mid ΡΠ΅ Π΅sΡΠΎΡΠ° Contral Lever 3-16
Outer-Mid Teleseape Control Lever Π-16
ΠΠΎΠΎm Latch Π iΠΏ Control Switch 3-18
Boom Latch Pin Engag d lndlcator Π-16
Hoi st Rotation lndicators (Optlonul) Π-16
Lock Pin Control Hal’ldle ~ 4 3Β· 16
Main Hoist Speed Selector Switch Π -17
SECTION IV
OPERATING PROCEDURES
PRESTARTfNG ΡΠ½Π΅ΡΠΊs + ;
Fuef Supply Engln1 Oil ”
Engine Coolant {Cummir’ts Only) 8atteries
Hydraulic Oil Reservoir and Filter
Daily Lubricetion : ” 1111
Wire ~Π°ΡΠ΅ 1111ΠΎ
Hook Π tack
Air Cfeaner
Β· ENGINE OPERATION 111
Startit19 Π rocedu re 4
Cold Weather StattinΒ§ *
ldllng t h e EngiΠΏe~ 1
Raclng the Π ngine f 8 ilf β β β t ” β β 1111
Shutdown Procedure
GeNERAL CRANE OPERATION +
H11ndling the load – 8 4′
Control Lever Operation 4-7
Preloacl Check ” ~ 4-7
USING YOUR LOAD CHART ΠΎ1 4-8
CRΠNE FUNC1’10NS ! ” +’10
xi
Page
Setting the Outrfggel’$’ 4′ 11
Stowing the Outriggers 4-12
Setting the Center FrontStaЬilizer 4 14
StowitΠ© the Center Fron’t StaΠ«ll_zer 4-15
Swinglng the Booirn – 4-18
Elevating and Lawering the Boom 4-17
Elevating ‘tne Boom fJ ~ 17
Lowering the Boom 4-17
\
Faot Coratrol ” – 4-18
EΠΏtergency Boom Operating Procedures 4-18
Telescoping the Boom ~ ” 4-19
Extendin9 tht Boom ~ 4-19
RetraGtfng the Boom 4-19
POWER-PINNED FL Π£ SECΠ’ION 4-20
Extending the Power Pinned Fly 4-20
Retracting the Power Plnned Fly 4 21
Lowering and Rai:s-ing ‘the Π‘Π°Π¬lΠ΅ 4-~
Lowerina the Π‘Π°Π«~Π΅ ~2Π
Aaising the Π‘Π°Π«Π΅ 4-2Π
OPΠ’IONAL EOUtPΠENT OPERATION 4-23
ΠΠΠ’ WATER HEATER (CUMMINS ENGINE) 4-23
Opernting 4-2Π
DIESEL FUEJ ΠΠΠ Π’Π R (DEUTZ ENGINE) ~ 4-23
Startf ng 11 ” ir 4 23
Stopp mg 4-2Π
seCΠ’ION V
OPERATIONAL AIDS
GENERAL + 5-1
KRUEGΒ·ER LOAO ΠΠΠΠNΠ’ INDICATING ‘LMI) SVSΠ’EM ~ 6–1
KRUEGER ANTIΠ’WO-BLOCK (Π) SVSTEM Ρ 5-1
KRUEGER ΠΠΠ AND HLAP SY$TEMS 5-1
CONTROL LEVER LOCKOUT SYSΠ’EM 5-2
SECΠ’ION VI
LUBR!CA TION
GEN&RAL llj ~ ~ 6-1
LUBRICANTS “‘ 6–1
xii
Page
Hydraulic Oil Recommendations + 6-4
Visc osit\ I 8-6
Arct1a Conditions (Below Π Degraes F 1-18 Degrees Π‘] t Π² Π²
Antiwear Additives – Π
LUBRICATJON POINTS 6-6
WJRe ROP! LUBRICATION : 6-22
SECTION VII
SET UP AND INSTALLATION PROCEDURES
GENERAL 11: 7 1
INSΠ’ALLING CABLE ON Π’ΠΠ HOIST DRUM 7″1
CABLE REEVING ” 7 2
ERECTING AND STOWING Π’Π’Π 35 Π :ΠΠΠ’ (10 7 Π)
SWINGAWAY EXTENSION : 7-3
Π recti ng 7 3
Stowing 1 7 11
Settlng ths TΠΈlescoping Ex1ension Length 7-1Π
Extending f ” 7 13
Stowing ~ 7 14
Settlng the Oβet _ 7–16
15 or ΠΠ degrees f 7-15
Mi11imun Offset (Π degrees) 7Β·16
S.V 06/24Β Β
What Our Customers Say
π Related Products
Discover more professional manuals for your equipment

Grove GMK4100 4100-L 5095 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

Grove GMK5100 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

Grove GMK 4080-1 Operating Instructions Manual Part 1 (Driving) - PDF DOWNLOAD
