★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Grove GMK 2035E Lattice Extension Operating Manual 3112294 PDF

$26.95

Grove GMK 2035E Lattice Extension Operating Manual (3112294) is a downloadable PDF guide offering detailed instructions for the proper operation of the lattice extension on the GMK 2035E crane, ensuring safe and efficient usage.

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Grove GMK 2035E Lattice Extension Operating Manual 3112294 – PDF DOWNLOAD

FILE DETAILS:

Grove GMK 2035E Lattice Extension Operating Manual 3112294 – PDF DOWNLOAD

Language : English
Pages : 136
Downloadable : Yes
File Type : PDF

IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:

Grove GMK 2035E Lattice Extension Operating Manual 3112294 – PDF DOWNLOAD

1 Information 7
1.1 About these operating instructions 7
Validity of these operating instructions 7
Prerequisites forassembly and operation 7
1.2 Basic safety instructions 7
Safety instructions 7
Warnings and symbols 7
1.3 Intended use 8
1.4 Organisational measures 8
1.5 Qualifications of the personnel 9
Requirements 9
Training courses 9
1.6 Safety instructions for working with the latticeextension 9
1.7 Definition of positional references 10
Basic rule 10
Switches and buttons 11
General information on the operating elements 11
1.8 How are the operating instructions structured? 12
1.9 Conversion table for US measurements 13
2 For operations planning 17
2.1 Swing-away lattice 17
2.1.2 Identification 18
2.1.3 Transport dimensions and weights 19
2.1.4 Slinging points 20
2.1.5 Transport 21
3 Swing-away lattice 25
3.1 Validity 25
3.2 Short description of the operating elements 26
On the safe load indicator 27
3.2.2 Operating elements on the swing-away lattice 28
3.2.3 Operating elements on the hand-held control 29
3.3 Checklists for rigging work 31
3.3.1 Overview of the required rigging work 31
3.3.2 CHECKLIST: Installing the 8.5/15 m swing-away lattice 32
3.3.3 CHECKLIST: Removing the 8.5/15 m swing-away lattice 34
For rigged swing- away lattice 34
For folded swing- away lattice 36
3.3.4 CHECKLIST: Rigging the 8.5/15 m swing-away lattice 39
3.3.5 CHECKLIST: Unrigging the 8.5/15 m swing-away lattice 45
3.4 Description of rigging work 51
3.4.1 Securing the swing-away lattice with rope 51
3.4.2 Checking the transport condition 52
Transport condition with removed swing- away lattice 53
3.4.3 Checking the locking device on the hose drum 58
3.4.4 Holders and connections of the hydraulic hoses 59
When unrigging 60
3.4.5 Connections with folded swing-away lattice 62
Connections in the Front 1 area 62
Connections in theFront 2 area 64
Connections in the middle area 66
Connections in the rear area 68
3.4.6 Securing/releasing section 2 70
Swing-away lattice, derricking 70
Swing-away lattice, inclinable 70
3.4.7 Connecting/disconnecting the slewing connection 72
Creating a slewing connection 72
Releasing a slewing connection 73
3.4.8 Connections on the left and right of the main boom head 74
Establishing connections 74
Releasing connections 75
Relieving the connecting points 76
3.4.9 Swivelling the swing-away lattice when rigging 77
When rigging – section1 77
When unrigging – section1 78
When rigging – section2 78
When unrigging – section2 79
3.4.10 Establishing/disconnecting connections to the swing-away lattice 81
Section1 and section2 installed 81
Only section1 installed 82
3.4.11 Electrical connections to the swing-away lattice 83
For 8.5 m swing- away lattice 83
For 15 m swing- away lattice 84
3.4.12 Unfolding/folding the deflection sheave 86
Folding out the deflection sheave 86
Folding in the deflection sheave 87
3.4.13 Positioning/removing the hoist rope 88
Positioning thehoist rope 88
Removing thehoist rope 88
Possible reeving methods on the swing-away lattice 89
3.4.14 Installing/removing the lifting limit switch 90
Connection to the main boom 90
On the 8.5m swing-away lattice 91
On the 15 m swing-away lattice 92
3.4.15 Installing/removing the anemometer 93
On the 8.5m swing-away lattice 93
On the 15 m swing-away lattice 94
3.4.16 Installing/removing the air traffic control light 95
3.4.17 Derrick swing-away lattice 96
When rigging 96
During operation 98
3.4.18 Setting the angle – with the auxiliary crane 100
3.4.19 Setting the angle – without the auxiliary crane 101
Entering the SLIcode 101
Setting an angle of 20 – or 40 102
Setting 0 angle 104
Inclining the truck crane 106
3.5 Operation with the lattice extension 107
3.5.1 Setting the SLI 108
3.5.2 Raising and setting down the main boom 109
Raising 109
Setting down 109
3.5.3 Telescoping with rigged lattice extension 110
3.5.4 Information about the SLI shutdown 111
3.5.5 Procedure if the permissible wind speed is exceeded 112
3.5.6 Information about the main boom operation when the swing- away lattice is folded/rigged 113
Folded 113
Rigged 113
3.6 Driving with rigged crane with a rigged latticeextension 115
Warnings 115
3.6.1 Route 115
3.6.2 Rigging mode and axle loads 116
Driving without aload 116
Drive with load 116
Table with axle loads 116
3.6.3 Before driving the rigged crane 118
3.6.4 Driving the rigged truck crane 118
Driving from the driver’s cab 118
Driving from the crane cab 118
While driving 119
3.7 Finding and eliminating malfunctions 121
3.8 Maintenance work 123
3.8.1 For modules in need of protection during cleaning work 123
3.8.2 Maintenance work M1 124
Lubricate pin 124
3.8.3 Maintenance work M12 125
Lubricate joints 125
4 Index 129
A 131
D 131
E 131
H 131
I 131
L 131
M 131
O 132
P 132
S 132
T 133

Questions? Email us: [email protected]

S.V

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order