★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
๐Ÿข
Trusted Business
Verified & Licensed
๐Ÿ›ก๏ธ
Virus Free Files
100% Safe Downloads
๐Ÿ”’
Secure Payment
SSL Protected
โšก
Instant Delivery
Available Immediately
Sale!

Grove GMK7450 Operating Instructions Lattice Extension Manual – PDF DOWNLOAD

Original price was: $69.95.Current price is: $24.95.

Grove GMK7450 Operating Instructions Lattice Extension Manual – PDF DOWNLOAD

โšก
Instant PDF Download
Available immediately
๐Ÿ’พ
Save to Your Device
Download & keep forever
๐Ÿ›ก๏ธ
Antivirus Scanned
100% virus-free
๐ŸŒ
Trusted Worldwide
175,000+ customers

Description

Grove GMK7450 Operating Instructions Lattice Extension Manual – PDF DOWNLOAD

DESCRIPTION:

Grove GMK7450 Operating Instructions Lattice Extension Manual – PDF DOWNLOAD

Intended use:

  • The truck crane GMK 7450 is constructed in accordance with the latest technology and the recognized safety regulations. Nevertheless, personal injury to the operator or a third party as well as damage to the crane and other property may occur during use.
  • The truck crane may only be modified with the consent of the manufacturer.
  • The truck crane GMK 7450 may only be used when in excellent working condition and for its intended purpose, and with due attention to safe operation and any possible hazards. Malfunctions that may affect the safe operation of the unit are to be corrected immediately.
  • The GMK 7450 truck crane may only be operated at temperatures of between โ€“25 and +40 ยฐC if it is not equipped with the relevant special equipment.
  • The GMK 7450 truck crane may only be used to vertically lift loads in the authorized rigging modes using a hook block that is reeved to the hoist rope. The weight and centre of distribution of the loads must be known. Any other use of the crane is not considered to represent intended use.
  • The manufacturer is not liable for damage resulting from the improper or unauthorized use of the truck crane GMK 7450. The user shall take full responsibility for any such use.

Intended use also entails :

โ€“ Observing the complete crane documentation consisting of the operating
instructions, the lifting capacity table, the outrigger pressure table and the
safety manual
โ€“ Observing the inspection and maintenance requirements specified in the
Maintenance manual.

Improper use includes:
โ€“ Transporting loads on the carrier
โ€“ Pushing, pulling or lifting loads with the level adjustment system, the
beams or the outrigger cylinders
โ€“ Pushing, pulling or lifting loads off the ground using the slewing gear, the
derricking gear or the telescoping gear
โ€“ Pulling off fixed objects using the crane
โ€“ Two-hook operation with the boom extension and two-hook operation on
the main boom head without additional equipment
โ€“ Operation when crane is not on outriggers (free on wheels)
โ€“ Defining SLI codes that do not correspond to the actual rigging mode
โ€“ Working with an overridden SLI or overridden lifting limit switch
โ€“ After SLI deactivation, increasing the radius by pulling the raised load at
an angle (e.g. with a chain hoist)
โ€“ Misuse of the outrigger pressure display as a safety function to prevent
overturning after an SLI shutdown (outrigger pressure greater than 0 t)
โ€“ Road driving in an unauthorized driving mode (axle load, dimension)
โ€“ Moving the rigged crane in an unauthorized driving mode
โ€“ The transportation of raised loads by moving the truck crane
โ€“ Use of equipment that is not authorized for use with the crane

TABLE OF CONTENTS:

Grove GMK7450 Operating Instructions Lattice Extension Manual – PDF DOWNLOAD

Operating instructions lattice extension................................................................................  1
1 Important information.................................................................................................  7
	1.1 About these operating instructions..............................................................................  7
		Validity of these Operating Instructions........................................................................  7
		Prerequisites for assembly and operation........................................................................  7
		Safety instructions.............................................................................................  7
		Reference to other operating instructions.......................................................................  7
	1.2 Basic safety instructions.......................................................................................  8
		1.2.1 Warnings and symbols......................................................................................  8
	1.3 Intended use....................................................................................................  9
	1.4 Organisational measures......................................................................................... 11
	1.5 Personnel qualifications........................................................................................ 13
	1.6 Safety instructions for truck crane work........................................................................ 14
	1.7 Specifications in US units of measurement....................................................................... 16
		1.7.1 Boom extension........................................................................................... 16
		1.7.2 Luffing jib.............................................................................................. 17
		1.7.3 Heavy load lattice extension.............................................................................. 17
2 Transport measurements, weights and allocation of the lattice extension sections...................................... 21
	2.1 Transport dimensions and weights................................................................................ 21
		2.1.1 Boom extension............................................................................................ 21
		2.1.2 Luffing jib............................................................................................... 22
		2.1.3 Heavy load lattice extension.............................................................................. 23
	2.2 Assignment of the parts to luffing jibs......................................................................... 25
		2.2.1 Parts for the different boom extensions................................................................... 25
		2.2.2 Parts for the different luffing jibs...................................................................... 27
		2.2.3 Parts for the different heavy load lattice extensions..................................................... 29
3 Boom extension........................................................................................................ 33
	3.1 Components and identification................................................................................... 33
		Components...................................................................................................... 33
		Identification.................................................................................................. 34
		Foot section.................................................................................................... 34
		Intermediate sections.......................................................................................... 35
		Reducing piece.................................................................................................. 35
		Head section.................................................................................................... 36
		Angle piece..................................................................................................... 36
	3.2 Possible combinations........................................................................................... 37
		Without angle offset.......................................................................................... 37
		With angle offset............................................................................................... 40
	3.3 Slinging points................................................................................................. 43
	3.4 Checklists for rigging work..................................................................................... 47
		3.4.1 CHECKLIST: Installing boom extension...................................................................... 47
		3.4.2 CHECKLIST: Removing the boom extension.................................................................... 51
	3.5 Description of rigging work..................................................................................... 55
		3.5.1 Pulling apart/pushing together intermediate sections...................................................... 55
			Folding up/folding out holders.............................................................................. 55
			Pulling apart intermediate sections......................................................................... 56
			Pushing in boom sections.................................................................................... 57
		3.5.2 Truck crane rigging mode during installation of the boom extension....................................... 59
		3.5.3 Establishing/disconnecting the connections for the hydraulic lock......................................... 60
			Establish connections...................................................................................... 60
			Disconnecting connections................................................................................... 60
		3.5.4 Secure/release hydraulic lock............................................................................. 61
			Execution withlevers....................................................................................... 62
			Version with locking bar.................................................................................... 63
				โ€ข Push the locking bar (1) on the handle (2) down....................................................... 63
				โ€ข Push the locking bar (1) on the handle (2) up......................................................... 63
		3.5.5 Locking the foot section/releasing the lock............................................................... 64
			Locking the foot section.................................................................................... 64
				โ€ข Bring the lever (2) on the changeover valve to horizontal position, for the top pin................... 64
			Releasing the lock.......................................................................................... 65
				โ€ข Bring the lever (2) on the changeover valve to horizontal position, for the top pin................... 65
		3.5.6 Handling the pins......................................................................................... 66
		3.5.7 Installing/removing the boom extension sections........................................................... 67
			Checks before installation/ removal......................................................................... 67
			Connecting pins............................................................................................ 67
			Installation................................................................................................ 68
			Removal..................................................................................................... 69
		3.5.8 Blocking the joint on the foot section.................................................................... 71
		3.5.9 Removing/installing deflection sheave on the angle piece.................................................. 72
		3.5.10 Replacing deflection sheaves on the angle piece.......................................................... 73
			โ€ข Sling the deflection sheave to the safety roller (1)..................................................... 73
			โ€ข Release the retaining pins and remove both pins (2) from the lower brackets (4)........................... 73
			โ€ข Lock the deflection sheave in this position with both pins (2)............................................ 73
		3.5.11 Fold deflection sheaves up/down.......................................................................... 74
			Folding down the deflection sheave......................................................................... 74
			Folding up the deflection sheave........................................................................... 74
			Folding support roller on the foot section.................................................................. 75
				โ€ข Release the retaining pin and remove the pins (1) from the connection points (4)...................... 75
				โ€ข Release the retaining pin and remove the pin (1) from the bore hole (3)............................... 75
				โ€ข Fold the support roller (2) upwards................................................................... 75
				โ€ข Insert the pin (1) into the connecting points (4) and secure it with the retaining pin................ 75
		3.5.12 Setting the angle position of the boom extension......................................................... 76
			Set angle position of 25................................................................................... 77
			Set angle position of 3.................................................................................... 77
		3.5.13 Changing the lifting limit switch and anemometer......................................................... 78
			Changing the lifting limit switch........................................................................... 78
			Changing anemometer........................................................................................ 79
		3.5.14 Electric connection to the foot section/main boom........................................................ 80
			Establishing a connection................................................................................... 80
			Detaching the connection.................................................................................... 81
		3.5.15 Electric connection to the head section/foot section..................................................... 81
			Connecting cable............................................................................................ 81
			Establishing a connection................................................................................... 82
			Detaching the connection.................................................................................... 83
		3.5.16 Placing and reeving hoist rope........................................................................... 84
			Possible reeving methods................................................................................... 86
	3.6 Working with the boom extension................................................................................. 89
		3.6.1 Telescoping with rigged boom extension.................................................................... 90
		3.6.2 Crane movements........................................................................................... 91
		3.6.3 SLI Overriding............................................................................................ 91
			+........................................................................................................... 91
		3.6.4 Influence of the wind during operating with boom extension................................................ 92
	3.7 Driving with rigged crane and boom extension................................................................... 95
		3.7.1 Driving route............................................................................................. 95
		3.7.2 Position of the boom and the axle load.................................................................... 96
			12 m (39 ft) boom extension................................................................................. 98
			18 m (59ft) boom extension................................................................................. 99
			24 m (79ft) boom extension.................................................................................100
			30 m (98ft) boom extension.................................................................................101
			36 m (118ft) boom extension................................................................................102
			42 m (138ft) boom extension................................................................................103
			46 m (151ft) boom extension................................................................................104
			52 m (170ft) boom extension................................................................................105
			58 m (190ft) boom extension................................................................................106
			64 m (210ft) boom extension................................................................................107
			70 m (230ft) boom extension................................................................................108
			46 m (151ft) boom extension................................................................................109
			52 m (170ft) boom extension................................................................................110
			58 m (190ft) boom extension................................................................................111
			64 m (210ft) boom extension................................................................................112
			70 m (230ft) boom extension................................................................................113
		3.7.3 Driving the rigged crane..................................................................................114
			Checking the superstructure lock............................................................................114
				4.......................................................................................................114
			Retracting the outrigger...................................................................................114
			Switching over the suspension locking system................................................................114
			Driving.....................................................................................................115
			Supporting the truck crane.................................................................................116
			If necessary, rig the counterweight sections................................................................116
	3.8 Boom extension maintenance......................................................................................117
		3.8.1 Maintenance plans.........................................................................................117
			M 1 maintenance plan:.......................................................................................117
		3.8.2 Lubricant table...........................................................................................118
		3.8.3 Maintenance work..........................................................................................118
			Notes on cleaning work......................................................................................118
			Lubricating connecting pins.................................................................................118
4 Luffing jib...........................................................................................................121
	4.1 Additional operating and display elements in the cranecab.....................................................121
		4.1.1 Additional symbol in main menu............................................................................121
		4.1.2 Luffing jib submenu.......................................................................................122
		4.1.3 Function of the operating and display elements in the luffing jib submenu.................................124
			%...........................................................................................................124
			&...........................................................................................................124
			(...........................................................................................................125
			!...........................................................................................................126
			$...........................................................................................................126
			"...........................................................................................................126
			#...........................................................................................................127
			*...........................................................................................................129
			,...........................................................................................................129
			-...........................................................................................................130
	4.2 Components and identification...................................................................................131
		Components......................................................................................................131
		Identification..................................................................................................132
		Foot section....................................................................................................132
		Long intermediate sections......................................................................................133
		Reducing piece..................................................................................................133
		Head section....................................................................................................134
		Luffing control arm.............................................................................................134
		Angle piece.....................................................................................................135
	4.3 Possible combinations...........................................................................................137
		Without angle offset...........................................................................................137
		With angle offset...............................................................................................139
	4.4 Slinging points.................................................................................................141
	4.5 Checklists for rigging work.....................................................................................145
		4.5.1 CHECKLIST: Rigging luffing jib............................................................................145
			(...........................................................................................................148
			&...........................................................................................................151
			%...........................................................................................................151
		4.5.2 CHECKLIST: Luffing jib removal............................................................................152
			%...........................................................................................................152
			&...........................................................................................................152
			(...........................................................................................................153
	4.6 Description of rigging work.....................................................................................159
		4.6.1 Pulling apart/pushing together intermediate sections......................................................159
			Folding up/folding out holders..............................................................................159
			Pulling apart intermediate sections.........................................................................160
			Pushing in boom sections....................................................................................161
		4.6.2 Rigging mode of the truck crane when mounting the luffing jib............................................163
		4.6.3 Installing/disassembling luffing control arm..............................................................164
			Installation................................................................................................164
			Disassembly.................................................................................................167
		4.6.4 Establishing/disconnecting the connections for the hydraulic lock.........................................170
			Establish connections......................................................................................170
			Disconnecting connections...................................................................................170
		4.6.5 Secure/release hydraulic lock.............................................................................171
			Execution withlevers.......................................................................................172
			Version with locking bar....................................................................................173
				โ€ข Push the locking bar (1) on the handle (2) down.......................................................173
				โ€ข Push the locking bar (1) on the handle (2) up.........................................................173
		4.6.6 Locking the foot section/releasing the lock...............................................................174
			Locking the foot section....................................................................................174
				โ€ข Align the foot section (1) in such a way that the top connection points (5) are flush.................174
				โ€ข Bring the lever (2) on the changeover valve to horizontal position, for the top pin...................174
				โ€ข Press button (3) on the operating panel and extend top pins completely................................174
				โ€ข Lower the foot section (1) with the auxiliary crane to a position where the lower locking point.......174
				โ€ข Bring the lever (2) on the changeover valve to vertical position, for the lower pins..................174
				โ€ข Press button (3) on the operating panel and extend lower pins completely..............................174
				โ€ข Secure the hydraulic lock; ร p.451................................................................174
			Releasing the lock..........................................................................................175
				โ€ข Bring the lever (2) on the changeover valve to horizontal position, for the top pin...................175
		4.6.7 Raising/placing the luffing jib...........................................................................176
			Raising the luffingjib....................................................................................176
			Setting down the luffing control arm.......................................................................177
			Raising/folding in railing..................................................................................177
		4.6.8 Manual control............................................................................................178
			Connecting the hand-held control............................................................................178
			Starting the crane engine with the hand-held control........................................................179
				p.......................................................................................................179
			Moving the hoisting gear....................................................................................179
				A B.....................................................................................................179
			Turning off crane engine with the hand-held control.........................................................180
				Q.......................................................................................................180
			Removing the hand-held control..............................................................................180
		4.6.9 Separating/joining catcher 2 and raising cylinder.........................................................181
			Separating catcher 2 and the raising cylinder...............................................................181
			Connecting catcher 2 and raising cylinder...................................................................182
		4.6.10 Reeving the auxiliary hoist rope to the upper hookblock.................................................183
		4.6.11 Preparing for rigging the upper hook block...............................................................185
			Before mounting the foot section............................................................................185
			After mounting the foot section.............................................................................186
		4.6.12 Securing the upper hook block on the luffing control arm.................................................186
			Release the securing device on the upper hook block.........................................................186
			Pull the upper hook block towards the luffing control arm...................................................187
			Locking the upper hook block...............................................................................188
		4.6.13 Removing the upper hook block from the luffing control arm...............................................190
			Releasing the locking pin...................................................................................190
			Pull the upper hook block towards the catcher...............................................................192
			Secure the upper hook block in the catcher..................................................................192
		4.6.14 Connecting pins โ€“ holders and handling...................................................................193
			Holders.....................................................................................................193
				Handling the pins.......................................................................................193
		4.6.15 Replacing the intermediate sections on the foot section..................................................194
			Prerequisites...............................................................................................194
			When rigging................................................................................................195
			When unrigging..............................................................................................196
		4.6.16 Installing/disassembling boom sections and rear pendant links............................................197
			Mounting....................................................................................................197
				โ€ข Sling the previously mounted boom section (1) using an auxiliary crane................................198
				โ€ข Raise the luffing jib until the bearing points (2) in the lower chord align...........................198
			Removal.....................................................................................................199
				โ€ข Release the connections (2) on both sides in the lower chord..........................................200
				โ€ข Lower the luffing jib using the auxiliary crane until the released boom section (1) is touching.......200
				โ€ข Repeat the procedure until only one boom section (1) is left on the intermediate section(2)..........200
				โ€ข Lift the luffing jib and lock the hinge (2) on the foot section.......................................200
				โ€ข Dismantle the last boom section (1)...................................................................200
			Transport protection rear pendant link....................................................................201
		4.6.17 Hinge lock in the foot section...........................................................................202
			Releasing the hinge lock...................................................................................202
			Locking the hinge...........................................................................................203
		4.6.18 Replacing deflection sheaves on the angle piece..........................................................205
			โ€ข Sling the deflection sheave to the safety roller (1).....................................................205
			โ€ข Release the retaining pins and remove both pins (2) from the lower brackets (4)...........................205
			โ€ข Lock the deflection sheave in this position with both pins (2)............................................205
		4.6.19 Fold deflection sheaves up/down..........................................................................206
			Folding down the deflection sheave.........................................................................206
			Folding up the deflection sheave...........................................................................206
			Folding support roller on the foot section..................................................................207
				โ€ข Release the retaining pin and remove the pins (1) from the connection points (4)......................207
				โ€ข Release the retaining pin and remove the pin (1) from the bore hole (3)...............................207
				โ€ข Fold the support roller (2) upwards...................................................................207
				โ€ข Insert the pin (1) into the connecting points (4) and secure it with the retaining pin................207
		4.6.20 Setting the angle position of the luffing jib............................................................208
			Set angle position of 22...................................................................................209
			Set angle position of 0....................................................................................209
		4.6.21 Changing the lifting limit switch and anemometer.........................................................210
			Changing the lifting limit switch...........................................................................210
			Changing anemometer........................................................................................211
		4.6.22 Electric connection to the foot section/main boom........................................................212
			Establishing a connection...................................................................................212
			Detaching the connection....................................................................................213
		4.6.23 Electric connection to the head section/foot section.....................................................213
			Connecting cable............................................................................................213
			Establishing a connection...................................................................................214
			Detaching the connection....................................................................................215
		4.6.24 Placing and reeving hoist rope...........................................................................216
			Possible reeving methods...................................................................................217
		4.6.25 Opening the luffing jib submenu..........................................................................219
			0...........................................................................................................219
		4.6.26 Telescoping with the luffing jib.........................................................................220
			Prerequisites...............................................................................................220
			รจ...........................................................................................................220
			0...........................................................................................................220
			โ€ข Press the button beside the symbol Telescopic extension operating mode (2) once. The indicator ...........220
			Telescopic extension with teleautomation....................................................................221
			Telescoping with semi-automatic.............................................................................223
				%.......................................................................................................223
				0.......................................................................................................223
				$.......................................................................................................223
				$.......................................................................................................224
		4.6.27 Derricking luffing jib when rigging......................................................................225
			Prerequisites...............................................................................................225
				0.......................................................................................................225
				โ€ข Press the button beside the symbol Rigging operating mode (4) once. The indicator lamp in the s.......225
					$...................................................................................................225
					$...................................................................................................226
					$...................................................................................................226
		4.6.28 Derricking main boom with installed luffing jib..........................................................227
			Derricking between โ€“1.2 to 82.............................................................................227
			(...........................................................................................................227
			Derricking between 82 and 60..............................................................................228
				%.......................................................................................................228
		4.6.29 Bringing the luffing jib into working position...........................................................229
			Raising luffing jib.........................................................................................229
				(.......................................................................................................229
				โ€ข Slowly carry out the Lift auxiliary hoist movement, in order to raise the luffing control arm.........229
			Telescoping to fixed length................................................................................230
				&.......................................................................................................230
			Lowering to working position................................................................................230
		4.6.30 Preparing the luffing jib for unrigging..................................................................231
	4.7 Operation with the luffing jib..................................................................................235
		%...............................................................................................................235
		4.7.1 Crane movements...........................................................................................236
			9...........................................................................................................236
		4.7.2 Working range and shutdowns..............................................................................237
			$...........................................................................................................237
			$...........................................................................................................238
		4.7.3 SLI shutdown..............................................................................................238
			* +.........................................................................................................238
		4.7.4 The effect of wind when operating with the luffing jib....................................................239
		4.7.5 Troubleshooting and remedy................................................................................241
	4.8 Driving with rigged crane and rigged luffing jib...............................................................243
		4.8.1 Driving route.............................................................................................243
		4.8.2 Rigging modes for moving and axle loads...................................................................244
			&...........................................................................................................246
			%...........................................................................................................246
			Notes on the tables.........................................................................................247
			25 m (82 ft) luffing jib....................................................................................247
			31 m (102 ft) luffing jib...................................................................................248
			37 m (121 ft) luffing jib...................................................................................248
			43 m (141 ft) luffing jib...................................................................................249
			49 m (161 ft) luffing jib...................................................................................249
			55 m (180 ft) luffing jib...................................................................................250
			61 m (200 ft) luffing jib...................................................................................250
			67 m (220 ft) luffing jib...................................................................................251
			73 m (240 ft) luffing jib...................................................................................251
		4.8.3 Driving the rigged crane..................................................................................253
			Checking the superstructure lock............................................................................253
				4.......................................................................................................253
			Retracting the outrigger...................................................................................253
			Switching over the suspension locking system................................................................253
			Driving.....................................................................................................254
			Supporting the truck crane.................................................................................255
			If necessary, rig the counterweight sections................................................................255
	4.9 Luffing jib maintenance.........................................................................................257
		4.9.1 Maintenance plans.........................................................................................257
			M 1 maintenance plan........................................................................................257
			M 3 maintenance plan........................................................................................257
			Maintenance schedule Y 2....................................................................................258
			Maintenance schedule Y 5....................................................................................258
			Maintenance schedule Y 10...................................................................................258
		4.9.2 Lubricant table...........................................................................................259
		4.9.3 Maintenance work..........................................................................................260
			Notes on cleaning work......................................................................................260
				Lubricating connecting pins.............................................................................260
		4.9.4 Fall-back guard strut maintenance work....................................................................261
			Equipment required.........................................................................................261
			Test connections............................................................................................262
			Nitrogen pressure...........................................................................................262
				โ€ข Connect the filling hose (3) to the nitrogen bottle...................................................264
				โ€ข Bleed the filling hose. To do this, open the relief valve (2) and the valve at the nitrogen bot.......264
			Oil pressure................................................................................................266
		4.9.5 Required inspections for the fall-back guard strut........................................................268
5 Heavy load lattice extension..........................................................................................271
	5.1 Components and identification...................................................................................271
		Components......................................................................................................271
		Identification..................................................................................................272
	5.2 Possible combinations...........................................................................................275
	5.3 Slinging points.................................................................................................277
	5.4 Rigging the heavy load lattice extension........................................................................279
		5.4.1 CHECKLIST: Rigging the heavy load lattice extension.......................................................279
		5.4.2 CHECKLIST: Unrigging the heavy load lattice extension.....................................................282
	5.5 Description of rigging work.....................................................................................285
		5.5.1 Truck crane rigging mode during installation of the heavy load lattice extension.........................285
		5.5.2 Establishing/disconnecting the connections for the hydraulic lock.........................................286
			Establish connections......................................................................................286
			Disconnecting connections...................................................................................286
		5.5.3 Secure/release hydraulic lock.............................................................................287
			Secure lock................................................................................................287
				โ€ข Push the locking bar (1) on the handle (2) down.......................................................287
			Release pins...............................................................................................287
				โ€ข Push the locking bar (1) on the handle (2) up.........................................................287
		5.5.4 Locking the adapter/releasing the lock....................................................................288
			Locking the adapter.........................................................................................288
				โ€ข Bring the lever (2) on the changeover valve to horizontal position, for the top pin...................288
			Releasing the lock..........................................................................................289
				โ€ข Bring the lever (2) on the changeover valve to horizontal position, for the top pin...................289
		5.5.5 Connecting pins โ€“ holders and handling....................................................................290
			Holders.....................................................................................................290
			Handling the pins...........................................................................................290
		5.5.6 Installing/removing head section and angle piece..........................................................291
			Installing..................................................................................................291
			Removal.....................................................................................................292
		5.5.7 Replacing deflection sheaves on the angle piece...........................................................293
			โ€ข Sling the deflection sheave to the safety roller (1).....................................................293
			โ€ข Release the retaining pins and remove both pins (2) from the upper brackets (4)...........................293
		5.5.8 Fold deflection sheaves up/down...........................................................................294
			Folding down the deflection sheave.........................................................................294
			Folding up the deflection sheave...........................................................................294
		5.5.9 Setting the angle position of the heavy load lattice extension............................................295
			Set angle position of 42...................................................................................296
			Set angle position of 20...................................................................................296
		5.5.10 Changing the lifting limit switch and anemometer.........................................................297
			Changing the lifting limit switch...........................................................................297
			Changing anemometer........................................................................................298
		5.5.11 Establishing/disconnecting the electrical connection.....................................................299
			Locking/unlocking the cable drum............................................................................299
			Establish/terminate connection..............................................................................300
		5.5.12 Placing and reeving hoist rope...........................................................................301
			Possible reeving methods...................................................................................302
	5.6 Operation with the heavy load lattice extension.................................................................305
		5.6.1 Enter components for heavy load lattice extension on the SLI..............................................305
		5.6.2 Telescoping with rigged heavy load lattice extension......................................................306
		5.6.3 Crane movements...........................................................................................307
		5.6.4 SLI shutdown..............................................................................................307
			+...........................................................................................................307
		5.6.5 Wind effect when operating the heavy load lattice extension...............................................308
	5.7 Turning loads with the heavy load lattice extension.............................................................309
		5.7.1 Prerequisites.............................................................................................309
		5.7.2 Set SLI for turning the load..............................................................................310
			Entering a reeving..........................................................................................310
			Set the SLI to the auxiliary hoist..........................................................................311
		5.7.3 Turning a load............................................................................................312
	5.8 Driving with rigged crane and rigged heavy load lattice extension..............................................315
		5.8.1 Driving route.............................................................................................315
		5.8.2 Position of the boom and the axle load....................................................................316
			4 m (13 ft)-heavy load lattice extension....................................................................318
			7.5 m (25 ft) heavy load lattice extension..................................................................319
		5.8.3 Driving the rigged crane..................................................................................320
			Checking the superstructure lock............................................................................320
				4.......................................................................................................320
			Retracting the outrigger...................................................................................320
			Switching over the suspension locking system................................................................320
			Driving.....................................................................................................321
			Supporting the truck crane.................................................................................322
			If necessary, rig the counterweight sections................................................................322
6 Index.................................................................................................................325
	B...................................................................................................................327
	C...................................................................................................................328
	D...................................................................................................................328
	H...................................................................................................................328
	I...................................................................................................................328
	L...................................................................................................................329
	M...................................................................................................................330
	P...................................................................................................................330
	R...................................................................................................................330
	S...................................................................................................................330
	T...................................................................................................................330

GROVE GMK7450 OPERATING INSTRUCTIONS LATTICE EXTENSION MANUAL – PDF DOWNLOAD:

IMAGES PREVIEW OF THE MANUAL:

Grove GMK7450 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD
Grove GMK7450 Operating Instructions Lattice Extension Manual – PDF DOWNLOAD
Grove GMK7450 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD
Grove GMK7450 Operating Instructions Lattice Extension Manual – PDF DOWNLOAD

PLEASE NOTE:

  • This is the same manual used by the DEALERSHIPS to SERVICE your vehicle.
  • The manual can be all yours – Once payment is complete, you will be taken to the download page from where you can download the manual. All in 2-5 minutes time!!
  • Need any other service / repair / parts manual, please feel free to contact us atย heydownloadss @gmail.comย . We may surprise you with a nice offer

S.V

What Our Customers Say

โ˜…โ˜…โ˜…โ˜…โ˜… Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    ๐Ÿ›’
    Recently Purchased
    ๐Ÿ•’ verified order