★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
๐Ÿข
Trusted Business
Verified & Licensed
๐Ÿ›ก๏ธ
Virus Free Files
100% Safe Downloads
๐Ÿ”’
Secure Payment
SSL Protected
โšก
Instant Delivery
Available Immediately
Sale!

Grove GMK7450 Operating Instructions Mega Wing Lift (MWL) Manual – PDF DOWNLOAD

Original price was: $69.95.Current price is: $23.95.

Grove GMK7450 Operating Instructions Mega Wing Lift (MWL) Manual – PDF DOWNLOAD

Serial Number 2084909

โšก
Instant PDF Download
Available immediately
๐Ÿ’พ
Save to Your Device
Download & keep forever
๐Ÿ›ก๏ธ
Antivirus Scanned
100% virus-free
๐ŸŒ
Trusted Worldwide
175,000+ customers

Description

Grove GMK7450 Operating Instructions Mega Wing Lift (MWL) Manual – PDF DOWNLOAD

DESCRIPTION:

Grove GMK7450 Operating Instructions Mega Wing Lift (MWL) Manual – PDF DOWNLOAD

Serial Number 2084909

Intended use:

  • The truck crane GMK 7450 is constructed in accordance with the latest technology and the recognized safety regulations. Nevertheless, personal injury to the operator or a third party as well as damage to the crane and other property may occur during use.
  • The truck crane may only be modified with the consent of the manufacturer.
  • The truck crane GMK 7450 may only be used when in excellent working condition and for its intended purpose, and with due attention to safe operation and any possible hazards. Malfunctions that may affect the safe operation of the unit are to be corrected immediately.
  • The GMK 7450 truck crane may only be operated at temperatures of between โ€“25 to +40 ยฐC (โ€“13 to +104 ยฐF) unless fitted with the appropriate special equipment.
  • The GMK 7450 truck crane may only be used to vertically lift loads in the authorized rigging modes using a hook block that is reeved to the hoist rope. The weight and centre of gravity of the loads must be known. Any other use of the crane is not considered to represent intended use.
  • The manufacturer is not liable for damage resulting from the improper or unauthorized use of the truck crane GMK 7450. The user shall take full responsibility for any such use.

Intended use also entails
โ€“ Following the complete crane documentation consisting of the operating
instructions, the lifting capacity table, the outrigger pressure table and the
safety manual
โ€“ Adhering to the inspection and maintenance requirements specified in
the maintenance manual.

Improper use includes:
โ€“ Transporting loads on the carrier
โ€“ Pushing, pulling or lifting loads with the level adjustment system, the
beams or the outrigger cylinders
โ€“ Pushing, pulling or lifting loads off the ground using the slewing gear, the
derricking gear or the telescoping mechanism
โ€“ Pulling off fixed objects using the crane
โ€“ Two-hook operation with the boom extension and two-hook operation on
the main boom head without additional equipment
โ€“ Operation when crane is not on outriggers (free on wheels)
โ€“ Defining SLI codes that do not correspond to the actual rigging mode
โ€“ Working with an overridden SLI or overridden lifting limit switch
โ€“ After SLI deactivation, increasing the radius by pulling the raised load at
an angle (e.g. with a chain hoist)
โ€“ Misuse of the outrigger pressure indicator as a safety function to prevent
overturning after an SLI shutdown (outrigger pressure greater than 0 t)
โ€“ Road driving in an unauthorized driving mode (axle load, dimension)
โ€“ Moving the rigged crane in an unauthorized driving mode
โ€“ Use of equipment that is not authorized for use with the crane
โ€“ Transporting people in any way with the lifting tackle, upon the load, or in
the crane cab while driving
โ€“ Carrying passengers outside the driver’s cab
โ€“ Loading and unloading work, i.e. continuous operation without a sufficiently
long break
โ€“ Usage for any kind of sport or recreation event, especially for bungee
jumping
โ€“ Operation of the truck crane with erected and non-braced MWL with
rigged lattice extension.

TABLE OF CONTENTS:

Grove GMK7450 Operating Instructions Mega Wing Lift (MWL) Manual – PDF DOWNLOAD

Operating instructions Mega Wing Lift (MWL)...................................................................  1
	1 Important information...................................................................................  7
		1.1 About these operating instructions................................................................  7
			Abbreviations used...............................................................................  7
			Validity of theseoperating instructions..........................................................  7
			Prerequisites forassembly and operation..........................................................  7
			Safety instructions..............................................................................  7
			References toother operating instructions........................................................  7
		1.2 Supplementary instructions to the operating instructions for the GMK7450.........................  8
			1.2.1 Addition to the driving mode table..........................................................  8
			1.2.2 Addition to the Telescoping emergency program submenu.......................................  8
			1.2.3 Addition to applications engineering........................................................  9
				Thresholds fortheuse of the main hoist......................................................  9
				Three-part rope holding rod................................................................... 10
				Sheaves for operation with lattice extension................................................. 10
		1.3 Basic safety instructions......................................................................... 11
			1.3.1 Warnings and symbols........................................................................ 11
		1.4 Intended use...................................................................................... 13
		1.5 Organisational measures........................................................................... 15
		1.6 Personnel qualifications.......................................................................... 17
		1.7 Safety instructions for truck crane work.......................................................... 19
	2 Transport dimensions and weights........................................................................ 23
		2.1 Mega Wing Lift (MWL).............................................................................. 23
		2.2 Add-on parts for the truck crane.................................................................. 23
		2.3 Add-on parts for lattice extension................................................................ 24
	3 Scope of delivery and function.......................................................................... 27
		3.1 Scope of delivery................................................................................. 27
			3.1.1 Add-on parts on the main boom............................................................... 28
			3.1.2 MWL and components.......................................................................... 29
		3.2 Function of the MWL............................................................................... 30
	4 Additional operating and display elements............................................................... 35
		4.1 Location of the additional operating and display elements......................................... 35
			4.1.1 Crane control display....................................................................... 35
				In the main menu.............................................................................. 35
				Submenu for Operation โ€“ MWL................................................................... 36
				Submenu for Rigging โ€“ MWL..................................................................... 38
				In the luffing jib submenu.................................................................... 40
			4.1.2 On the SLI display.......................................................................... 41
			4.1.3 On the hand-held control.................................................................... 42
				Hand-held control............................................................................. 42
				Hand-held control for the MWL................................................................. 43
		4.2 Function of the additional operating and display elements........................................ 45
			4.2.1 In the main menu and in the luffing jib submenu............................................. 45
			4.2.2 In the submenu Operation MWL................................................................ 45
			4.2.3 In the submenu Rigging MWL.................................................................. 54
			4.2.4 On the SLI display โ€“ Enter rigging mode submenu............................................. 59
			4.2.5 On the hand-held control.................................................................... 61
				Connections for hand-held control............................................................. 61
				Pre-selection button for rigging............................................................ 62
				Two-hand operating panel...................................................................... 65
	5 MWL โ€“ Rigging and unrigging............................................................................. 69
		5.1 Identification and slinging points................................................................ 69
			5.1.1 Identification.............................................................................. 69
			5.1.2 Slinging points............................................................................. 71
				On the MWL.................................................................................... 71
				On the other components....................................................................... 72
		5.2 Checklists for rigging work....................................................................... 73
			5.2.1 CHECKLIST: Rigging the MWL.................................................................. 73
			5.2.2 CHECKLIST: MWL โ€“ unrigging.................................................................. 78
		5.3 Rigging work...................................................................................... 83
			5.3.1 Preparing the truck crane................................................................... 83
				For rigging................................................................................... 83
				For unrigging................................................................................. 84
			5.3.2 Installing/removing the rests for the rear pendant links.................................... 85
				Installing the rests......................................................................... 85
				Removing the rests............................................................................ 86
			5.3.3 Moving the rope grab........................................................................ 88
				Moving to the rear bracket.................................................................... 88
				Moving to the front bracket................................................................... 89
			5.3.4 Installing/removing the lateral head sheaves................................................ 90
				Installing the head sheave................................................................... 90
				Removing the head sheave..................................................................... 92
			5.3.5 Using the rigging tool...................................................................... 94
			5.3.6 MWL โ€“ Slinging and fastening the guide ropes................................................ 95
				MWL โ€“ slinging................................................................................ 95
				Fastening the guide ropes..................................................................... 96
			5.3.7 Push the supports in/out.................................................................... 97
				Pushing in the supports....................................................................... 97
				Pushing out the supports...................................................................... 97
			5.3.8 Establishing/breaking the hydraulic connection between the MWL and the main boom........... 99
				Establishing a connection.................................................................... 99
				Releasing the connection......................................................................100
			5.3.9 MWL โ€“ lowering/raising on the main boom.....................................................101
				MWL โ€“ lowering................................................................................101
				MWL โ€“ raising.................................................................................102
			5.3.10 Connecting/disconnecting the holding frame and main boom...................................103
				Locking the sliding connecting link...........................................................103
				Unlocking the sliding connecting link.........................................................104
			5.3.11 Establishing/disconnecting the hydraulic connection........................................104
				Establishing a connection....................................................................104
				Disconnecting................................................................................106
			5.3.12 Establishing/disconnecting the electrical connection.......................................107
				Establishing connection.......................................................................107
				Breaking connections..........................................................................108
			5.3.13 Connecting/removing the hand-held control.................................................109
				Hand-held control (for serial no. 9020 and above).............................................109
				Hand-held control (up to serial no.9019).....................................................111
			5.3.14 Connecting/disconnecting the raising cylinder and main boom................................113
				Operating the tension ratchets...............................................................113
				Moving the raising cylinder...................................................................114
				Establishing a connection....................................................................116
				Disconnecting ...............................................................................117
			5.3.15 Moving the turnbuckles for the rear pendant links into the position Operation/Transport....118
			5.3.16 Establishing/releasing the connection between the gantry masts and the holding frame.......119
			5.3.17 Moving the deflection sheaves into the position Operation/ Transport.......................120
				Moving into the position Operation............................................................120
				Moving into the Transport position............................................................121
			5.3.18 Running the hoist rope to the main boom head...............................................122
			5.3.19 Positioning/removing the hoist ropes on/from the deflection sheaves........................123
			5.3.20 MWL โ€“ raising/setting down.................................................................124
				Preparations..................................................................................124
				MWL โ€“ raising.................................................................................124
				Setting down the MWL.........................................................................125
			5.3.21 Positioning/removing the guy ropes.........................................................128
				Positioning the guy ropes....................................................................128
				Removing the guy rope........................................................................130
				Locking/unlocking the winch...................................................................132
				Winding/unwinding the winches.................................................................133
			5.3.22 Securing/releasing the lateral head sheaves................................................134
				Securing......................................................................................134
				Releasing.....................................................................................135
			5.3.23 Transporting the MWL.......................................................................136
		5.4 Operation from the crane cabin during rigging.....................................................137
			5.4.1 In the submenu Rigging โ€“ MWL................................................................137
				MWL โ€“ raising.................................................................................138
				MWL โ€“ setting down...........................................................................139
				Locking the winches...........................................................................141
				Unlocking the winches.........................................................................142
				Winding/unwinding the winches.................................................................143
			5.4.2 In the submenu Operation โ€“ MWL..............................................................145
				Folding in the gantry masts...................................................................146
	6 Operation with the main boom and the MWL................................................................149
		6.1 Further rigging work..............................................................................150
			6.1.1 CHECKLIST: Rigging for operation with main boom.............................................150
			6.1.2 CHECKLIST: Unrigging after operation with the main boom.....................................151
			6.1.3 Installing/removing the three-part rope holding rod.........................................152
				Installing....................................................................................152
				Removal.......................................................................................153
			6.1.4 Reeving the hoist rope......................................................................154
				Positioning hoist rope........................................................................154
		6.2 Operation with braced boom system.................................................................157
			6.2.1 CHECKLIST: Bringing the boom system into the operating condition............................157
			6.2.2 CHECKLIST: Bringing the boom system into the rigging mode...................................158
			6.2.3 Setting the SLI.............................................................................159
			6.2.4 Opening the submenu Operation โ€“ MWL.........................................................161
			6.2.5 Telescoping with rigged MWL.................................................................162
				Prerequisites.................................................................................162
				Telescoping...................................................................................162
			6.2.6 Folding the gantry masts out/in.............................................................163
				Prerequisites.................................................................................163
				Folding in/folding out.......................................................................163
			6.2.7 Brace the boom system.......................................................................165
				Prerequisites.................................................................................165
				Derricking to the bracing angle..............................................................165
				Bracing.......................................................................................166
			6.2.8 Locking/unlocking the winches...............................................................167
				Lock winches..................................................................................167
				Unlock winches................................................................................168
		6.3 Operation with MWL set down.......................................................................169
			6.3.1 Bringing the boom system into the operating condition.......................................169
				Setting the SLI...............................................................................170
				Telescoping...................................................................................171
				Derricking....................................................................................171
				Operation with the main boom.................................................................171
			6.3.2 Bringing the boom system into the rigging mode..............................................171
		6.4 Operation with unbraced boom system and raised MWL................................................173
			6.4.1 Bringing the boom system into the operating condition.......................................173
				Setting the SLI...............................................................................173
				Telescoping...................................................................................174
				Derricking....................................................................................174
				Operation with the main boom.................................................................174
			6.4.2 Bringing the boom system into the rigging mode..............................................175
		6.5 Driving with rigged truck crane and rigged MWL....................................................177
			6.5.1 Driving route...............................................................................177
			6.5.2 Rigging modes for moving and axle loads.....................................................178
				Bringing the truck crane into the rigging mode................................................178
				Axle load tables.............................................................................179
			6.5.3 Driving the rigged truck crane..............................................................180
				Checking the superstructure lock..............................................................180
				Retracting the outriggers....................................................................180
				Switching over the suspension locking system..................................................180
				Driving.......................................................................................181
				Supporting the truck crane...................................................................182
				If necessary, rig the counterweight sections.................................................182
	7 Operation with boom extension and MWL...................................................................185
		7.1 Further rigging work..............................................................................187
			7.1.1 CHECKLIST: Rigging for operation with boom extension........................................187
			7.1.2 CHECKLIST: Unrigging after operation with the boom extension................................188
			7.1.3 Installing the deflection sheave with support roller........................................189
				Installing the deflection sheave.............................................................189
			7.1.4 Positioning the supporting roller on the foot section.......................................190
			7.1.5 Extra information on positioning the hoist rope with rigged MWL.............................191
		7.2 Operation with braced boom system.................................................................193
			7.2.1 CHECKLIST: Bringing the boom system into the operating condition............................193
			7.2.2 CHECKLIST: Bringing the boom system into the rigging mode...................................194
			7.2.3 Setting the SLI.............................................................................195
		7.3 Operation with MWL set down.......................................................................197
			7.3.1 Bringing the boom system into the operating condition.......................................197
				Setting the SLI...............................................................................198
				Telescoping...................................................................................199
				Working with the boom extension...............................................................199
			7.3.2 Bringing the boom system into the rigging mode..............................................199
		7.4 Rigging mode with unbraced boom system and raised MWL.............................................201
		7.5 Driving with rigged crane and rigged boom extension with rigged MWL...............................203
			7.5.1 Driving route...............................................................................204
			7.5.2 Rigging modes for moving and axle loads.....................................................204
				Bringing the truck crane into the rigging mode................................................204
				12 m (39 ft)-boom extension...................................................................206
				18 m (59 ft)-boom extension...................................................................207
				24 m (79 ft)-boom extension...................................................................208
			7.5.3 Driving the rigged crane....................................................................209
				Checking the superstructure lock..............................................................209
				Retracting the outriggers....................................................................209
				Switching over the suspension locking system..................................................209
				Driving.......................................................................................210
				Supporting the truck crane...................................................................211
				If necessary, rig the counterweight sections..................................................211
	8 Operation with the luffing jib and the MWL..............................................................215
		8.1 Additional display in the submenu Operation โ€“ MWL.................................................216
		8.2 Further rigging work..............................................................................217
			8.2.1 CHECKLIST: Rigging for operation with luffing jib...........................................217
			8.2.2 CHECKLIST: Unrigging after operation with the luffing jib...................................219
			8.2.3 Installing the deflection sheave with support roller........................................220
				Installing the deflection sheave.............................................................220
			8.2.4 Positioning the supporting roller on the foot section.......................................221
			8.2.5 Extra information on positioning the hoist rope with rigged MWL.............................222
		8.3 Operation with braced boom system.................................................................223
			8.3.1 CHECKLIST: Bringing the boom system into operating condition................................223
			8.3.2 CHECKLIST: Bringing the boom system into rigging mode.......................................227
			8.3.3 Setting the SLI.............................................................................231
			8.3.4 Derricking main boom with rigged luffing jib and rigged MWL.................................233
			8.3.5 Telescoping main boom with rigged luffing jib and rigged MWL................................234
			8.3.6 Bracing boom system with rigged luffing jib.................................................236
		8.4 Operation with MWL set down.......................................................................237
			8.4.1 Bringing the boom system into the operating condition.......................................237
				Setting the SLI...............................................................................238
				Telescoping...................................................................................239
				Operation with the luffing jib................................................................239
			8.4.2 Bringing the boom system into the rigging mode..............................................239
		8.5 Rigging mode with unbraced boom system and raised MWL.............................................241
		8.6 Driving with rigged crane, rigged luffing jib and rigged MWL.....................................243
			8.6.1 Driving route...............................................................................243
			8.6.2 Rigging modes for moving and axle loads.....................................................244
				Notes on the tables...........................................................................247
				25 m (82 ft)-Luffing jib......................................................................247
				31 m (102 ft)-Luffing jib....................................................................248
				37 m (121 ft)-Luffing jib....................................................................248
				43 m (141 ft)-Luffing jib....................................................................249
				49 m (161 ft)-Luffing jib....................................................................249
				55 m (180 ft)-Luffing jib....................................................................250
				61 m (200 ft)-Luffing jib....................................................................250
				67 m (220 ft)-Luffing jib....................................................................251
				73 m (240 ft)-Luffing jib....................................................................251
			8.6.3 Driving the rigged crane....................................................................253
				Checking the superstructure lock..............................................................253
				Retracting the outriggers....................................................................253
				Switching over the suspension locking system..................................................253
				Driving.......................................................................................254
				Supporting the truck crane...................................................................255
				If necessary, rig the counterweight sections..................................................255
	9 Operation with heavy load lattice extension and MWL.....................................................259
		9.1 Further rigging work..............................................................................261
			9.1.1 Rigging for operation with heavy load lattice extension.....................................261
			9.1.2 Unrigging after operation with the heavy load lattice extension.............................261
			9.1.3 Extra information on positioning the hoist rope with rigged MWL.............................262
		9.2 Operation with braced boom system.................................................................263
			9.2.1 CHECKLIST: Bringing the boom system into operating condition................................263
			9.2.2 CHECKLIST: Bringing the boom system into the rigging mode...................................264
			9.2.3 Setting the SLI.............................................................................265
		9.3 Operation with MWL set down.......................................................................267
			9.3.1 Bringing the boom system into the operating condition.......................................267
				Setting the SLI...............................................................................268
				Telescoping...................................................................................269
				Operation with the heavy load lattice extension...............................................269
			9.3.2 Bringing the boom system into the rigging mode..............................................269
		9.4 Rigging mode with unbraced boom system and raised MWL.............................................271
		9.5 Turning loads with the heavy load lattice extension...............................................273
			9.5.1 Prerequisites...............................................................................274
			9.5.2 Set SLI for turning the load................................................................275
				Entering a reeving............................................................................275
				Set the SLI to the auxiliary hoist............................................................276
			9.5.3 Turning a load..............................................................................277
		9.6 Driving with rigged crane and rigged heavy load lattice extension with rigged MWL................279
			9.6.1 Driving route...............................................................................280
			9.6.2 Rigging modes for moving and axle loads.....................................................280
				Bringing the truck crane into the rigging mode................................................280
				4 m (13 ft)-heavy load lattice extension......................................................282
				7,5 m (25 ft)-heavy load lattice extension....................................................283
			9.6.3 Driving the rigged crane....................................................................284
				Checking the superstructure lock..............................................................284
				Retracting the outriggers....................................................................284
				Switching over the suspension locking system..................................................284
				Driving.......................................................................................285
				Supporting the truck crane...................................................................286
				If necessary, rig the counterweight sections..................................................286
	10 Malfunctions during operation with the MWL.............................................................289
		10.1 Electrical system................................................................................290
			10.1.1 Fuses......................................................................................290
		10.2 Troubleshooting..................................................................................291
			10.2.1 Malfunctions during operation with the MWL.................................................291
			10.2.2 Malfunctions when operating with the hand-held control.....................................294
			10.2.3 Malfunctions on the SLI....................................................................295
				Check the supply line.........................................................................296
			10.2.4 Error messages on the crane control display................................................297
				Symbols for additional devices...............................................................298
				Allocation of the additional index displays..................................................299
				Error messages via the Can bus................................................................305
				System monitoring group error messages.......................................................306
		10.3 Operation with emergency program switched on.....................................................307
			10.3.1 Operating the MWL in the emergency program.................................................307
				Switching on the emergency program...........................................................307
				Operating the MWL.............................................................................309
			10.3.2 Telescoping in the emergency program with a rigged MWL.....................................310
				When retracting...............................................................................310
				Extending.....................................................................................310
	11 Maintenance work on the MWL............................................................................313
		11.1 Modules in need of protection during cleaning work...............................................313
		11.2 Maintenance plans................................................................................315
			11.2.1 Maintenance plan D: daily..................................................................315
			11.2.2 Maintenance plan W: weekly.................................................................316
			11.2.3 M 3 maintenance plan: Every 3 months / after 300 oper. hrs.................................316
			11.2.4 M 6 maintenance plan: every 6 months / after 500 oper. hrs.................................317
			11.2.5 M 12 maintenance plan: every 12 months / after 1000 oper. hrs..............................317
		11.3 Lubricant table..................................................................................319
		11.4 Maintenance work.................................................................................321
			11.4.1 Checking the position of the guy ropes on the winchdrum...................................321
			11.4.2 Checking the lateral head sheaves.........................................................322
			11.4.3 Checking the winch gears for leaks.........................................................323
			11.4.4 Checking the oil level in the winch gears..................................................323
			11.4.5 Lubricating the joints on the holding frame................................................324
			11.4.6 Checking the end fastenings of the guy ropes...............................................325
				Check at the gantry masts....................................................................325
				Check at the winch drums......................................................................326
			11.4.7 Lubricating the winch gears................................................................327
			11.4.8 Checking the condition of the guy ropes....................................................327
			11.4.9 Lubricating the gear rim...................................................................329
			11.4.10 Lubricating the locking units.............................................................330
			11.4.11 Changing the oil at the winch gears.......................................................331
			11.4.12 Changing the guy ropes....................................................................332
				Prerequisites.................................................................................332
				Rope end fittings on the gantry mast.........................................................333
				Rope end fittings on the winch drums..........................................................334
	12 Index..................................................................................................339
		A.....................................................................................................341
		B.....................................................................................................341
		C.....................................................................................................341
		D.....................................................................................................342
		F.....................................................................................................342
		H.....................................................................................................342
		I.....................................................................................................342
		L.....................................................................................................342
		M.....................................................................................................342
		O.....................................................................................................343
		R.....................................................................................................345
		S.....................................................................................................346
		T.....................................................................................................346

GROVE GMK7450 OPERATING INSTRUCTIONS MEGA WING LIFT (MWL) MANUAL – PDF DOWNLOAD:

IMAGES PREVIEW OF THE MANUAL:

Grove GMK7450 Operating Instructions Mega Wing Lift (MWL) Manual - PDF DOWNLOAD
Grove GMK7450 Operating Instructions Mega Wing Lift (MWL) Manual – PDF DOWNLOAD
Grove GMK7450 Operating Instructions Mega Wing Lift (MWL) Manual - PDF DOWNLOAD
Grove GMK7450 Operating Instructions Mega Wing Lift (MWL) Manual – PDF DOWNLOAD
Grove GMK7450 Operating Instructions Mega Wing Lift (MWL) Manual - PDF DOWNLOAD
Grove GMK7450 Operating Instructions Mega Wing Lift (MWL) Manual – PDF DOWNLOAD

PLEASE NOTE:

  • This is the same manual used by the dealers to diagnose and troubleshoot your vehicle
  • You will be directed to the download page as soon as the purchase is completed. The whole payment and downloading process will take anywhere between 2-5 minutes
  • Need any other service / repair / parts manual, please feel free to contactย [email protected]ย . We still have 50,000 manuals unlisted

S.V

What Our Customers Say

โ˜…โ˜…โ˜…โ˜…โ˜… Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    ๐Ÿ›’
    Recently Purchased
    ๐Ÿ•’ verified order