★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Hitachi UH063 Hydraulic Excavator Operator’s Manual – PDF DOWNLOAD

$27.95

Hitachi UH063 Hydraulic Excavator Operator’s Manual – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Hitachi UH063 Hydraulic Excavator Operator’s Manual – PDF DOWNLOAD

FILE DETAILS:

Hitachi UH063 Hydraulic Excavator Operator’s Manual – PDF DOWNLOAD

Part Number (P/N): EM12944
Language: English
Division: Hitachi
Product Lines: Excavators
Publication Type: Operator’s Manuals
Associated Models: UH063
Series: UH-SERIES
Serial Range: 8900-

IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:

Hitachi UH063 Hydraulic Excavator Operator’s Manual – PDF DOWNLOAD

COVER 0
TO THE OPERATOR AND DEALER’S SERVICE PERSONNEL 5
SAFETY 7
UNDERSTAND MACHINE OPERATION 7
WEAR PROTECTIVE CLOTHING 7
USE SAFETY EQUIPMENT 7
INSPECT EXCAVATOR 7
PRECAUTIONS FOR INSPECTION AND MAINTENANCE 8
MOVE EXCAVATOR SAFETY 8
PARK SAFETY 8
CONTROLS AND INSTRUMENTS 9
CONTROLS 9
INSTRUMENT PANEL 11
FUEL (THROTTLE) LEVER F 12
STARTER SWITCH G 13
GAUGES AND INDICATORS 13
FUNCTION OF EACH GAUGE AND INDICATOR 14
WARNING LAMPS 15
PILOT LAMPS 16
LAMP BULB CHECK 16
AUTO IDLING DEVICE (OPTION) 17
PROPEL LEVERS (OR PEDALS) 18
SWING AND ARM CONTROL LEVER 19
BOOM AND BUCKET CONTROL LEVER 19
SWING LOCK LEVER 20
APPLY THE LEVER TO LOCK 20
OPERATOR SEAT ADJUSTMENT 21
OPENING AND STORING FRONT WINDOW 22
CAB HEATER 23
BREAKING-IN THE NEW MACHINE 23
BREAK-IN THE EXCAVATOR CORRECTLY 23
PRESTART INSPECTION 25
INSPECT EXDCAVATOR DAILY BEFORE STARTING 25
OPERATION 27
GETTING ON AND OFF THE MACHINE 27
STARTING THE ENGINE 28
STARTING PROCEDURE FOR COLD CONDITIONS 29
CHECKING INSTRUMENT AFTER STARTING 30
STOPPING THE ENGINE 30
WARMING-UP 31
WARMING EXCAVATOR DURING COLD WEATHER 31
BASIC MACHINE OPERATION 33
MOVE EXCAVATOR SAFELY 33
CARRY BUCKET LOW 33
AVOID TIPPING 33
OPERATE WITH CAUTION 33
AVOID POWER LINES 34
CHECK WORK SITE 34
OPERATING IN WATER OR MUD 34
AVOID HARD DIGGING 35
JACK UP OPERATION 35
AVOID HAMMER WORK 35
AVOID HARD SWING OPERATION 36
SPECIAL ATTENTION FOR CRANE USE 36
BACKHOE OPERATION 36
INSTRUTIONS FOR LONG ARM 37
FACE SHOVEL OPERATION (WITH REVERSED HOE BUCKET) 38
FACE SHOVEL OPERATION 39
PRECAUTIONS IN TOWING 39
CAUTIONS AFTER OPERATION 40
TRANSPORTING 41
LOADING THE EXCAVATOR 41
DIMENSIONS FOR TRANSPORTION 43
TRANSPORTATION OF LONG ARM FRONT ATTACHMENT 43
TO THE MECHANIC AND DEALER’S SERVICE PERSONNEL 45
SAFETY 47
UNDERSTAND CORRECT SERVICE 47
BE SURE TO STOP THE ENGINE 47
CAUTIONS FOR INSPECTION AND MAINTENANCE 47
SERVICE HYDRAULIC SYSTEM SAFELY 48
LOCK THE ENGINE HOOD 48
SUPPORT RAISED EQUIPMENT 48
HANDLE FUEL SAFELY 48
AVOID HIGH PRESSURE FLUIDS 49
MAKE REPAIRS SAFELY 49
AVOID DANGEROUS WORK 49
COMPONENTS LOCATIONS AND CIRCUITS 51
INSPECT EXCAVATOR DAILY BEFORE STARTING 51
HYDRAULIC SYSTEM 53
ELECTRICAL CIRCUIT 55
MAINTENANCE 57
CORRECT MAINTENANCE AND CHECKING PROCEDURES 57
SERVICE YOUR EXCAVATOR AT SPECIFIED INTERVALS 57
MAINTENANCE GUIDE 58
A GREASING 60
FRONT JOINT PINS -EVERY 100 HRS 61
SWING BEARING-EVERY 500 HRS 62
SWING INTERNAL GEAR-EVERY 500 HRS 62
CENTER JOINT-EVERY 1000 HRS 62
CONTROL LEVER SHAFT – EVERY 1500 HRS 63
B ENGINE OIL 64
ENGINE OIL PAN – LEVEL CHECK EVERY DAY 64
ENGINE OIL PAN – REPLACEMENT EVERY 500 HRS (INITIAL 50 HRS ) 65
ENGINE OIL FILTER ELEMENT -REPLACEMENT EVERY 500 HOURS(INITIAL 50 HOURS ) 65
C GEAR OIL 66
SWING REDUCTION UNIT- LEVEL CHECK(EVERY 250 HOURS)-REPLACEMENT (EVERY 1000 HOURS) 67
PROPEL REDUCTION UNIT OIL -LEVEL CHECK(EVERY 250 HOURS)- REPLACEMENT (EVERY 1000 HOURS) 67
D HYDRAULIC SYSTEM 68
OIL LEVEL CHECK -EVERY DAY 69
HYDRAULIC OIL TANK DRAIN -EVERY 50 HOURS 69
HYDRAULIC OIL REPLACEMENT – EVERY 1500 HOURS 70
SUCTION FILTER ELEMENT CLEANING -WHEN REPLACING HYDRAULIC OIL 71
FULL-FLOW FILTER ELEMENT REPLACEMENT – EVERY 250 HOURS (INITIAL 50 HOURS) 72
FOLLOW THE CORRECT PROCEDURE FOR HYDRAULICS 73
E FUEL SYSTEM 74
FUEL TANK DRAINING – EVERY DAY 74
FIEL FILTER – REPLACEMENT EVERY 500 HOURS 75
FEED PUMP INTER FILTER CLEANING – EVERY 1000 HOURS 75
FUEL TANK STRAINER CLEANING -1000 HOURS 76
F AIR INTAKE 77
AIR CLEANER ELEMENT – CLEANING EVERY 250 HOURS- REPLACEMENT EVERY 1500 HOURS 77
G COOLING SYSTEM 78
COOLANT LEVEL CHECK – EVERY DAY 79
FAN BELT TENSION – EVERY DAY 79
COOLANT REPLACEMENT – EVERY 250 HOURS 80
RADIATOR CORE CLEANING 80
H ELECTRICAL SYSTEM 81
BATTERY 81
I OTHERS 83
BUCKET TEETH 84
TRACK TENSION CHECK – EVERY DAY 85
CHECK THE BUCKET LINKAGE CLEARANCE – WHEN REQUIRED 86
RETORQUE CHECK – EVERY 250 HOURS (INITIAL 50 HOURS) 87
MAINTENANCE SERVICES UNDER VARIOUS CONDITIONS 91
STORAGE 93
STORING THE EXCAVATOR 93
REMOVE THE MACHINE FROM STORAGE 93
ASSEMBLY OF FRONT-END ATTACHMENT 95
OPEN PACKAGE CAREFULLY 95
CHECK ITEMS AND QUANTITY 95
PREPARE THE FOLLOWING EQUIPMENT AND MATERIALS 96
STUDY HOW TO OPERATE THE BASE MACHINE 97
REMOVE EXTRA GREASE FROM CONTROL VALVE SPOOLS 97
CLEAN ALL CONNECTING PORTIONS 97
MOUNT THE HOSES TO THE BASE MACHINE 98
MOUNT THE BOOM 98
CONNECT THE ROD-END SIDE BOOM CYLINDER 99
MOUNT THE ARM TO THE BOOM 100
INSTALL BUCKET CYLINDER HOSES 101
MOUNT THE BUCKET 102
ATTACH MISCELLANEOUS PARTS 103
TEST THE MACHINE 103
TROUBLESHOOTING 105
ENGINE 105
ELECTRICAL SYSTEM 108
CONTROL SYSTEM 109
HYDRAULIC SYSTEM 110
SPECIFICATION 115
SPECIFICATION 115
WORKING RANGES 116
SHOE TYPES AND APPLICATIONS 117
BUCKET TYPES AND APPLICATIONS 118

S.V 03/24 

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order