JLG 80HX 80HX+6 80HXER Service & Maintenance Manual (3120271) -PDF Download Eng
$80.00 Original price was: $80.00.$19.95Current price is: $19.95.
JLG 80HX 80HX+6 80HXER Service & Maintenance Manual (3120271) -PDF Download Eng
Description
JLG 80HX 80HX+6 80HXER Service & Maintenance Manual (3120271) -PDF Download Eng
TABLE OF CONTENTS:
JLG 80HX 80HX+6 80HXER Service & Maintenance Manual (3120271) PDF Download Eng
SUBJECT – SECTION, PARAGRAPH PAGE NO
SECTION A – INTRODUCTION – MAINTENANCE SAFETY PRECAUTIONS
A General A-1
B Hydraulic System Safety A-1
C Maintenance A-1
SECTION 1 – SPECIFICATIONS
1 1 Capacities 1-1
1 2 Component Data 1-1
Engine – Ford LSG423 1-1
Engine – Deutz F4L912 1-1
Engine – Wisconsin V465D 1-1
Engine – Cummins 4B 3 9C 1-1
Engine – Ford LRG-423 1-2
Engine – Ford LRG-425 1-2
Drive System 1-2
Drive Motor Displacement Machines Built Prior to Jan 1992 1-2
Drive Motor Displacement Machines Built from Jan 1992 to Present 1-2
Drive Hub Ratios 1-2
Steer System 1-2
Swing System 1-2
Hydraulic Pump 1-2
Auxiliary Power Pump 1-3
Hydraulic Filter – Tank 1-3
Hydraulic Filter – Inline (Racine Valve Only) 1-3
1 3 Performance Data 1-3
Travel Speed 1-3
Gradeability 1-3
Turning Radius (Outside) 1-3
Boom Speed (Telescope) 1-3
Boom Speed (Lift) 1-3
Swing Speed 360° 1-3
Boom Elevation 1-3
Machine Weight 1-3
Machine Stowed Height 1-3
Machine Stowed Length 1-3
Machine Width 1-3
Maximum Tire Load 1-3
Wheelbase 1-3
1 4 Torque Requirements 1-4
1 5 Lubrication 1-4
Ford Engines 1-9
Deutz F4L912 Engine 1-9
Wisconsin V465D Engine 1-9
Cummins 4B 3 9C 1-9
Lubrication Specifications 1-10
1 6 Pressure Settings 1-10
Prior to Mid 1987 1-10
80 HX 1-11
80HX w/Hydraulic Controls 1-11
80HX w/Oscillating Axle 1-11
1 7 Major Components Weights 1-12
1 8 Cylinder Specifications 1-12
ii – JLG Lift – 3120271
TABLE OF CONTENTS (Continued)
TABLE OF CONTENTS (continued)
SUBJECT – SECTION, PARAGRAPH PAGE NO
1 9 Boom Tape 1-12
American Standard 1-12
Canadian Standard 1-12
1 10 Critical Stability Weights 1-13
1 11 Serial Number Location 1-13
SECTION 2 – GENERAL
2 1 Machine Preparation, Inspection, and Maintenance 2-1
General 2-1
Preparation, Inspection, and Maintenance 2-1
Pre-Start Inspection 2-1
Pre-Delivery Inspection and Frequent Inspection 2-1
Annual Machine Inspection 2-1
Preventative Maintenance 2-1
2 2 Service and Guidelines 2-2
General 2-2
Safety and Workmanship 2-2
Cleanliness 2-2
Components Removal and Installation 2-2
Component Disassembly and Reassembly 2-3
Pressure-Fit Parts 2-3
Bearings 2-3
Gaskets 2-3
Bolt Usage and Torque Application 2-3
Hydraulic Lines and Electrical Wiring 2-3
Hydraulic System 2-3
Lubrication 2-3
Battery 2-3
Lubrication and Servicing 2-3
2 3 Lubrication and Information 2-4
Hydraulic System 2-4
Hydraulic Oil 2-4
Changing Hydraulic Oil 2-4
Lubrication Specifications 2-4
2 4 Cylinder Drift Test 2-5
Platform Drift 2-5
Cylinder Drift 2-5
2 5 Pins and Composite Bearing Repair Guidelines 2-5
2 6 Welding on JLG Equipment 2-6
Do the Following When Welding on JLG Equipment 2-6
Do NOT Do the Following When Welding on JLG Equipment 2-6
2 7 Applying Silicone Dielectric Compound to Electrical Connections 2-6
2 8 Preventive Maintenance and Inspection Schedule 2-7
SECTION 3 – CHASSIS & TURNTABLE
3 1 Torque Hub 3-1
Disassembly 3-1
Cleaning and Inspection 3-1
Repair 3-3
Input Shaft Assembly 3-4
Assembly 3-4
3120271 – JLG Lift – iii
TABLE OF CONTENTS
TABLE OF CONTENTS (continued)
SUBJECT – SECTION, PARAGRAPH PAGE NO
3 2 Drive Brake, Ausco – Machines Built Prior to October 1987 3-8
Disassembly 3-8
Cleaning and Inspection 3-9
Assembly 3-9
3 3 Drive Brake, Mico – Machines Built Prior to October 1987 3-10
Disassembly 3-10
Inspection 3-10
Assembly 3-10
Bleeding 3-11
3 4 Drive Brake, Ausco – Machines Built Prior to 1992 3-12
Disassembly 3-12
Cleaning and Inspection 3-12
Assembly 3-12
3 5 Drive Brake, Mico – Machines Built From 1992 to Present 3-14
Disassembly 3-14
Inspection 3-14
Assembly 3-14
3 6 Governor Checks and Adeco Adjustment, LRG423 & LRG425 3-17
Checks 3-17
Adjustments 3-17
3 7 Throttle Checks and Precision Governor Adjustments, LSG-423 & LRG-425 3-22
Checks 3-22
Carburetor and Governor Adjustment 3-22
3 8 E331 Precision Governor And Adjustments – Ford Engines 3-23
General 3-23
Quick-start Installations 3-23
Mounting-Actuator 3-24
Linkage 3-24
Mounting-Controller 3-25
Wiring 3-25
Power Distribution 3-25
Check-Out and Initial Start-Up Procedures 3-26
Troubleshooting 3-29
Automatic Choke Adjustment Procedure 3-31
3 9 Automatic Choke Adjustment – Ford Engine 3-31
3 10 Cold Weather Starting Difficulty 3-32
Checking the Carburetor 3-32
Checking the Ignition 3-33
Checking the Fuel 3-33
3 11 Throttle Checks and Adjustments – Deutz Engine 3-34
3 12 Swing Bearing 3-34
Turntable Bearing Mounting Bolt Condition Check 3-34
Wear Tolerance 3-35
Replacement and Devcon Application Procedures on Machines Built Prior to Mid 1991 3-35
Swing Bearing Torque Values 3-39
3 13 Oscillating Axle Bleeding Procedure 3-40
Lockout Cylinder Bleeding (Without Holding Valves) 3-40
Lockout Cylinder Bleeding (With Holding Valves) 3-40
3 14 Oscillating Axle Lockout Test 3-41
3 15 Free Wheeling Option 3-41
To Disengage Drive Motors and Brakes (Free Wheel) for Towing, etc 3-41
To Engage Drive Motors and Brakes (Normal Operation) 3-41
3 16 Spark Arrestor Mufflers 3-42
3 17 Footswitch Adjustment 3-42
iv – JLG Lift – 3120271
TABLE OF CONTENTS (Continued)
TABLE OF CONTENTS (continued)
SUBJECT – SECTION, PARAGRAPH PAGE NO
3 18 Hydraulic Pump W/Hayes Pump Drive Coupling Lubrication 3-42
3 19 Dual Fuel System 3-42
Changing from gasoline to LP-Gas 3-42
Changing from LP Gas to Gasoline 3-42
SECTION 4 – BOOM & PLATFORM
4 1 Boom Maintenance 4-1
Removal 4-1
Disassembly 4-1
Inspection 4-4
Assembly 4-5
Installation 4-6
4 2 Boom Chains 4-7
Adjusting Procedures 4-7
Inspection Procedures 4-8
4 3 Wear Pads 4-10
4 4 Telescope Cylinder Eccentric Bushing 4-10
4 5 Horizontal High Speed Cutout Switch Adjustment Procedure 4-10
4 6 Controllers 4-10
PQ 4-10
OEM 4-10
VICKERS (All Hydraulic) 4-10
4 7 Capacity Indicator 4-10
Capacity Indicator Cable Adjustment 4-10
Capacity Indicator Boom Tape Replacement 4-11
Installation Procedure 4-11
Capacity Indicator Dial Decal Replacement 4-11
Indicator Decal Installation 4-11
4 8 Basket Rotator Brake 4-11
SECTION 5 – HYDRAULICS
5 1 Cylinders – Theory Of Operation 5-1
Double Acting Cylinders 5-1
5 2 Valves – Theory Of Operation 5-1
Holding Valves 5-1
Solenoid Control Valves (Bang-Bang) 5-1
Proportional Control Valve – Vickers 5-1
Main Relief Valves 5-1
Relief Valves 5-1
5 3 Cylinder Checking Procedure 5-3
Cylinders Without Counterbalance Valves 5-3
Cylinders With Single Counterbalance Valve 5-3
Cylinders With Dual Counterbalance Valves 5-4
5 4 Cylinder Repair 5-4
Disassembly 5-4
Cleaning and Inspection 5-11
Assembly 5-12
5 5 Cylinder Removal and Installation 5-14
Telescope Cylinder Removal 5-14
Telescope Cylinder Installation 5-14
Boom Lift Cylinder Removal 5-15
Boom Lift Cylinder Installation 5-15
3120271 – JLG Lift – v
TABLE OF CONTENTS
TABLE OF CONTENTS (continued)
SUBJECT – SECTION, PARAGRAPH PAGE NO
5 6 Telescope Cylinder Eccentric Bushing 5-15
5 7 Hydraulic Pump W/Hayes Pump Drive Coupling Lubrication 5-15
5 8 Racine Proportional Air Gap Adjustment 5-16
5 9 Pressure Setting Procedures 5-16
SECTION 6 – TROUBLESHOOTING & SCHEMATICS
6 1 General 6-1
6 2 Troubleshooting Information 6-1
6 3 Hydraulic Circuit Checks 6-1
LIST OF FIGURES
FIGURE NO TITLE PAGE NO
1-1 Lubrication Diagram 1-5
1-2 Serial Number Locations 1-13
1-3 Torque Chart – (In/Lb – Ft/Lb) (For ASTM Fasteners) 1-14
1-4 Torque Chart (Metric Conversion) – (For ASTM Fasteners) 1-15
1-5 Torque Chart – (N, m) – (For Metric Class Fasteners) 1-16
3-1 Torque Hub Assembly 3-2
3-2 Drive Brake, Ausco – Machines Built Prior to October 1987 3-9
3-3 Drive Brake, Mico – Machines Built Prior to October 1987 3-11
3-4 Drive Brake, Ausco – Machines Built Prior to 1992 3-13
3-5 Drive Brake, Mico – Machines Built from 1992 to Present 3-15
3-6 Spring Loading 3-16
3-7 Governor Adjustment, LRG-423 & LRG-425 with Adeco 3-17
3-8 Adeco Adjustment, LRG-423 & LRG-425 3-18
3-9 Precision Governor Adjustment – LRG-423 & LRG-425 (Sheet 1 of 2) 3-19
3-10 Precision Governor Adjustment – LRG-423 & LRG-425 (Sheet 2 of 2) 3-20
3-11 Adeco Actuator Adjustments – F4L912 3-21
3-12 Swing Bearing Bolt Feeler Gauge Check 3-34
3-13 Swing Bearing Tolerance Measuring Point 3-35
3-14 Swing Bearing Tolerance Boom Placement 3-37
3-15 Swing Bearing Torquing Sequence 3-38
4-1 Boom Assembly (Sheet 1 of 2) 4-2
4-2 Boom Assembly (Sheet 2 of 2) 4-3
4-3 Typical Boom Assembly 4-7
4-4 Telescope Cylinder Eccentric Bushing 4-10
4-5 Boom Tape Replacement 4-11
4-6 Capacity Indicator Dial 4-11
4-7 Belleville Washers 4-11
5-1 Proportional Control Valve 5-2
5-2 Boom Positioning and Support – Cylinder Repair 5-5
5-3 Typical Hydraulic Cylinders (Sheet 1 of 4) 5-6
5-4 Typical Hydraulic Cylinders (Sheet 2 of 4) 5-7
5-5 Typical Hydraulic Cylinders (Sheet 3 of 4) 5-8
5-6 Typical Hydraulic Cylinders (Sheet 4 of 4) 5-9
5-7 Cylinder Barrel Support 5-10
5-8 Cylinder Rod Support 5-10
5-9 Poly-Pak Seal Installation 5-12
5-10 Telescope Cylinder Eccentric Bushing 5-15
5-11 Racine Proportional Air Gap Adjustment, Machines Built Prior to Mid 1987 5-16
5-12 Racine Proportional Valve Pressure Setting – Prior to Mid 1987 (Sheet 1 of 2) 5-17
5-13 Racine Proportional Valve Pressure Setting – Prior to Mid 1987 (Sheet 2 of 2) 5-18
vi – JLG Lift – 3120271
TABLE OF CONTENTS (Continued)
LIST OF FIGURES (continued)
FIGURE NO TITLE PAGE NO
5-14 Vickers Proportional Valve Pressure Setting – Prior to 1989 with Accessory Valve (Sheet 1 of 4) 5-19
5-15 Vickers Proportional Valve Pressure Setting – Prior to 1989 with Accessory Valve (Sheet 2 of 4) 5-20
5-16 Vickers Proportional Valve Pressure Setting – Prior to 1989 with Accessory Valve (Sheet 3 of 4) 5-21
5-17 Vickers Proportional Valve Pressure Setting – Prior to 1989 with Accessory Valve (Sheet 4 of 4) 5-22
5-18 Solenoid Valve Pressure Settings – Prior to Mid 1992 with Steering Wheel 5-23
5-19 Pressure and Flow Settings – Machines Prior to Mid 1992 with Steering Wheel 5-24
5-20 Vickers Proportional Valve Pressure Setting – Mid 1992 to Present (Sheet 1 of 4) 5-25
5-21 Vickers Proportional Valve Pressure Setting – Mid 1992 to Present (Sheet 2 of 4) 5-26
5-22 Vickers Proportional Valve Pressure Setting – Mid 1992 to Present (Sheet 3 of 4) 5-27
5-23 Vickers Proportional Valve Pressure Setting – Mid 1992 to Present (Sheet 4 of 4) 5-28
5-24 Pressure Setting – All Hydraulic Machines (Sheet 1 of 4) 5-29
5-25 Pressure Setting – All Hydraulic Machines (Sheet 2 of 4) 5-30
5-26 Pressure Setting – All Hydraulic Machines (Sheet 3 of 4) 5-31
5-27 Pressure Setting – All Hydraulic Machines (Sheet 4 of 4) 5-32
5-28 Solenoid Valve Pressure Settings – Machines Built to Present 5-33
5-29 Solenoid Valve Pressure Settings – 4 Wheel Steer 5-34
5-30 Extend-A-Reach Valve Pressure and Speed Settings 5-35
6-1 Wiring Schematic Dual Fuel 6-21
6-2 Wiring Diagram – Generator (Deutz Engines) 6-22
6-3 Wiring Diagram – Generator (Ford Engine) 6-23
6-4 Wiring Diagram – Platform Console Standard Controls (Sheet 1 of 2) 6-24
6-5 Wiring Diagram – Platform Console Standard Controls (Sheet 2 of 2) 6-25
6-6 Wiring Diagram – Platform Console Hydraulic Controls 6-27
6-7 Wiring Diagram – Standard (Deutz Engine/Fixed Axle/Standard Controls) (Sheet 1 of 2) 6-28
6-8 Wiring Diagram – Standard (Deutz Engine/Fixed Axle/Standard Controls)(Sheet 2 of 2) 6-29
6-9 Wiring Diagram – Standard (Deutz Engine/Oscillating Axle/Standard Controls)(Sheet 1 of 2) 6-30
6-10 Wiring Diagram – Standard (Deutz Engine/Oscillating Axle/Standard Controls)(Sheet 2 of 2) 6-31
6-11 Wiring Diagram – Standard (Deutz Engine/Hydraulic Controls)(Sheet 1 of 2) 6-32
6-12 Wiring Diagram – Standard (Deutz Engine/Hydraulic Controls)(Sheet 2 of 2) 6-33
6-13 Wiring Diagram – Standard (Ford Engine/Fixed Axle/Standard Controls)(Sheet 1 of 2) 6-34
6-14 Wiring Diagram – Standard (Ford Engine/Fixed Axle/Standard Controls)(Sheet 2 of 2) 6-35
6-15 Wiring Diagram – Standard (Ford Engine/Oscillating Axle/Standard Controls)(Sheet 1 of 2) 6-36
6-16 Wiring Diagram – Standard (Ford Engine/Oscillating Axle/Standard Controls)(Sheet 2 of 2) 6-37
6-17 Wiring Diagram – Standard (Ford Engine/Hydraulic Controls)(Sheet 1 of 2) 6-38
6-18 Wiring Diagram – Standard (Ford Engine/Hydraulic Controls)(Sheet 2 of 2) 6-39
6-19 Hydraulic Schematic (Sheet 1 of 6) 6-40
6-20 Hydraulic Schematic (Sheet 2 of 6) 6-41
6-21 Hydraulic Schematic (Sheet 3 of 6) 6-42
6-22 Hydraulic Schematic (Sheet 4 of 6) 6-43
6-23 Hydraulic Schematic (Sheet 5 of 6) 6-44
6-24 Hydraulic Schematic (Sheet 6 of 6) 6-45
3120271 – JLG Lift – vii
TABLE OF CONTENTS
LIST OF TABLES
TABLE NO TITLE PAGE NO
1-1 Torque Requirements 1-4
1-2 Lubrication Chart 1-6
1-4 Mobil EAL 224 H Specs 1-10
1-5 Mobil DTE 13M Specs 1-10
1-3 Hydraulic Oil 1-10
1-6 Lubrication Specifications 1-10
1-7 Major Component Weights 1-12
1-8 Cylinder Specifications 1-12
1-9 Critical Stability Weights 1-13
2-1 Inspection and Maintenance 2-2
2-2 Cylinder Drift 2-5
2-3 Preventive Maintenance and Inspection Schedule 2-8
4-1 Chain Stretch Tolerance 4-9
5-1 Cylinder Piston Nut Torque Specifications 5-13
5-2 Holding Valve Torque Specification 5-14
6-1 Platform Assembly – Troubleshooting 6-2
6-2 Boom Assembly – Troubleshooting 6-3
6-3 Turntable Assembly – Troubleshooting 6-8
6-4 Chassis Assembly – Troubleshooting 6-9
6-5 Hydraulic System – Troubleshooting 6-15
6-6 Electrical System – Troubleshooting 6-18
viii –
IMAGES PREVIEW OF THE MANUAL:
PLEASE NOTE:
- This is the SAME exact manual used by your dealers to fix your vehicle.
- The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
- Any queries / doubts regarding your purchase, please feel free to contact [email protected]
S.M
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Deutz BFM 1012, 1013 Engines Workshop Service Repair Manual (German, English, French, Spanish PDF)

DERBI BOULEVARD 125 150 200 WORKSHOP SERVICE REPAIR MANUAL PDF DOWNLOAD


