Kobelco CRANE CKE600 Operation & Maintenance Manual S2GB30003ZE06 – PDF DOWNLOAD
$30.95
Kobelco CRANE CKE600 Operation & Maintenance Manual S2GB30003ZE06 – PDF DOWNLOAD
Description
Kobelco CRANE CKE600 Operation & Maintenance Manual S2GB30003ZE06 – PDF DOWNLOAD
FILE DETAILS:
Kobelco CRANE CKE600 Operation & Maintenance Manual S2GB30003ZE06 – PDF DOWNLOAD
Language : English
Pages : 359
Downloadable : Yes
File Type : PDF
DESCRIPTION:
Kobelco CRANE CKE600 Operation & Maintenance Manual S2GB30003ZE06 – PDF DOWNLOAD
IMPORTANT INFORMATION
Thank you for your purchasing KOBELCO crawler crane. Our CKI;: series full-hydraulically operated crawler crane, is manufactured based on our many years of experience and expertise. This manual describes important information about Model CKE600. Before operating the machine, be sure to thoroughly read this manual in order to use the machine safely and efficiently.
SAFETY INFORMATION
- Most accidents, that occur during operation are due to neglect of precautionary measures and safety rules. Sufficient care should be taken to avoid these accidents. Erroneous operation, lubrication or maintenance services are very dangerous and may cause injury to, or death of, personnel.
- Precautionary measures or notes provided in this manual should be read and understood by personnel before starting each task. Operation, inspection, and maintenance should be carefully carried out, and safety must be given first priority. Safety labels are indicated with A marks.
- The safety information contained in this manual is intended only general safety information. Safety labels appear both in this manual and on the machine. All safety labels are identified by the words “DANGER”, “WARNING” and “CAUTION”. These words mean the following:
IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:
Kobelco CRANE CKE600 Operation & Maintenance Manual S2GB30003ZE06 – PDF DOWNLOAD
COVER..................................................................... 1 TABLE OF CONTENTS......................................................... 3 IMPORTANT INFORMATION..................................................... 9 1. SAFE OPERATING PRACTICES FOR MOBILE CRANES............................. 19 2. OPERATION.............................................................. 39 2.1 TERMINOLOGY OF MACHINE EACH PART.................................. 39 2.2 LOCATIONS AND TERMS OF OPERATING CONTROLS......................... 40 2.2.1 HANDLING OF EACH SWITCH..................................... 46 2.2.3 HANDLING THE AIR CONDITIONER................................ 67 2.2.4 AM/FM RADIO (OPTION)........................................ 69 2.3 CRANE OPERATION................................................... 71 2.3.1 ADJUSTING THE OPERATOR'S SEAT............................... 71 2.3.2 1WAY CALL (TRANSMITTER) (OPTION)............................ 72 2.3.3 ADJUSTING THE CONTROL LEVER DIRECTION....................... 72 2.3.4 STARTING AND STOPPING THE ENGINE............................ 73 2.3.5 FUNCTION LOCK LEVER......................................... 77 2.3.6 PROPELLING OPERATION........................................ 77 2.3.7 SWINGING OPERATION.......................................... 80 2.3.8 BOOM RAISING/LOWERING OPERATION............................. 81 2.3.9 HOOK RAISING/LOWERING OPERATION............................. 83 2.4 FREE FALL OPERATION............................................... 86 2.5 CLAMSHELL OPERATION............................................... 89 2.6 HANDLING OF HYDRAULIC TAGLINE (OPTION)............................ 91 2.7 HANDLING OF VIBROHAMMER........................................... 93 3. LOAD SAFETY DEVICE..................................................... 95 3.1 ARRANGEMENT OF EQUIPMENTS......................................... 95 3.2 TYPE AND FUNCTIONS OF EQUIPMENTS.................................. 98 3.3 CONNECTING PROCEDURE OF WIRING....................................104 3.3.1 CRANE ATTACHMENT............................................104 3.4 FUNCTION OF CONTROLLER/MONITOR....................................109 3.5 OPERATING PROCEDURE OF CONTROLLER.................................113 3.5.1 SETTING OF THE CRANE CONFIGURATION..........................117 3.5.2 SELECTION OF MAIN/AUX. LIFTING..............................122 3.5.3 SETTING OF WORKING AREA LIMIT VALUE.........................123 3.5.4 SETTING OF THE TIME.........................................127 3.5.5 LOAD RECORD.................................................129 3.6 WARNING ALARM AND AUTOMATIC STOP..................................131 3.6.1 ITEMS OF WARNING ALARM AND AUTOMATIC STOP...................131 3.6.2 CONTENTS OF AUTOMATIC STOP..................................132 3.6.3 RELEASE OF AUTOMATIC STOP...................................134 3.7 INSPECTION........................................................140 3.7.1 INSPECTION BEFORE RAISING THE BOOM AFTER ASSEMBLY OF........140 3.7.2 INSPECTION AFTER ERECTING THE ATTACHMENT....................143 3.8 CAUTION FOR HANDLING THE LOAD SAFETY DEVICE.......................144 3.9 INDICATION OF ERRORS AND REMEDY...................................145 3.10 INDICATION OF MESSAGE AND ALARM..................................146 3.11 CONFIRMATION OF FUNCTION FOR LOAD SAFETY DEVICE..................147 4. UNLOADING/LOADING THE BASIC MACHINE....................................149 4.1 UNLOADING THE BASIC MACHINE FROM THE TRAILER......................150 4.2 LOADING THE MACHINE ON A TRAILER..................................150 5. ASSEMBLY/DISASSEMBLY OF BASIC MACHINE..................................151 5.1 EXTENDING/RETRACTING THE CRAWLERS.................................152 5.1.1 EXTENDING THE CRAWLERS......................................152 5.1.2 RETRACTING THE CRAWLER......................................155 5.2 ERECTING/LOWERING THE GANTRY......................................158 5.2.1 ERECTING THE GANTRY.........................................158 5.2.2 LOWERING THE GANTRY.........................................160 5.3 INSTALLATION, REMOVAL OF THE COUNTERWEIGHT........................161 5.3.1 INSTALLATION OF THE COUNTERWEIGHT...........................162 5.3.2 REMOVAL OF THE COUNTERWEIGHT................................165 5.4 INSTALLATION, REMOVAL OF THE COUNTERWEIGHT........................166 5.4.1 SETTING OF LMI..............................................166 5.4.2 PREPARATIONS FOR OPERATION..................................170 5.4.3 INSTALLATION PROCEDURES.....................................175 5.4.4 DISASSEMBLY PROCEDURES......................................179 5.4.5 OPERATION OF CYLINDER WHEN SETTING LOW GANTRY POSITION......183 6. ASSEMBLY/DISASSEMBLY OF CRANE ATTACHMENT...............................185 6.1 ASSEMBLING THE ATTACHMENT.........................................187 6.1.1 ARRANGEMENT OF BOOM/JIB/GUY LINE............................187 6.1.2 INSTALLING THE BACKSTOPS....................................196 6.1.3 INSTALLING THE BOOM BASE....................................197 6.1.4 INSTALLING THE BACKSTOPS TO THE REVOLVING FRAME.............199 6.1.5 INSTALLING THE UPPER SPREADER...............................199 6.1.6 REEVING THE WIRE ROPE INTO THE UPPER AND LOWER SPREADER.....200 6.1.7 INSTALLING THE BOOM TIP.....................................202 6.1.8 INSTALLATION OF THE BASIC GUY LINE..........................203 6.1.9 MAIN HOIST WIRE ROPE REEVING................................204 6.1.10 CONNECTING THE INSERT BOOMS................................207 6.1.11 INSTALLING THE CABLE ROLLERS...............................215 6.1.12 CONNECTING THE BOOM GUY LINES..............................216 6.1.13 CAUTION FOR CANTILEVER.....................................218 6.1.14 ASSEMBLING THE JIB.........................................220 6.1.15 REEVING OF REAR DRUM WIRE ROPE.............................224 6.1.16 INSTALLING THE AUXILIARY SHEAVE............................226 6.1.17 REEVING THE REAR DRUM WIRE ROPE TO THE AUXILIARY SHEAVE....227 6.2 ERECTING THE ATTACHMENT...........................................228 6.2.1 CONFIRMATION BEFORE ERECTING THE ATTACHMENT.................228 6.2.2 ERECTING THE ATTACHMENT.....................................229 6.3 LOWERING THE ATTACHMENT...........................................231 6.3.1 LOWERING THE ATTACHMENT.....................................232 6.4 DISASSEMBLING THE ATTACHMENT......................................233 6.4.1 TREATMENT OF OVERHOIST LIMIT SWITCH WIRING..................233 6.4.2 WINDING UP THE FRONT DRUM/REAR DRUM WIRE ROPES..............233 6.4.3 DISASSEMBLING THE JIB.......................................234 6.4.4 REMOVING THE BOOM GUY LINE..................................236 6.4.5 DISASSEMBLING THE BOOM......................................238 6.4.6 REMOVING THE BASE BOOM......................................239 6.4.7 REMOVAL OF THE COUNTERWEIGHT................................240 6.4.8 LOWERING THE GANTRY.........................................240 6.5 CAUTION WHEN TRANSPORTING BOOM....................................241 7. WIRE ROPE..............................................................243 7.1 HANDLING OF WIRE ROPE.............................................243 7.1.1 UNREELING METHOD OF WIRE ROPE...............................243 7.1.2 WINDING WIRE ROPE ONTO THE DRUM.............................244 7.1.3 INSTALLING THE ROPE SOCKET..................................246 7.1.4 SPECIFICATION OF WIRE ROPE..................................246 7.1.5 WIRE ROPE LENGTH............................................247 8. MAINTENANCE............................................................249 8.1 CHECKS............................................................254 8.1.1 CHECKS OF THE UPPER.........................................254 8.1.1.1 CHECK OF UPPER DAILY OR EVERY 8 HOURS.................256 8.1.1.2 CHECK OF UPPER MONTHLY OR EVERY 100 HOURS.............261 8.1.1.3 CHECK OF UPPER SEMI-ANNUALLY OR EVERY 600 HOURS.......265 8.1.1.4 CHECK OF UPPER WEEKLY OR EVERY 50 HOURS...............266 8.1.2 CHECK OF LOWER..............................................268 8.1.2.1 CHECK OF LOWER DAILY OR EVERY 8 HOURS.................270 8.1.2.2 CHECK OF LOWER MONTHLY OR EVERY 100 HOURS.............271 8.1.2.3 CHECK OF LOWER QUARTERLY OR EVERY 250 HOURS...........273 8.1.2.4 CHECK OF LOWER SEMI-ANNUALLY OR EVERY 600 HOURS.......273 8.1.3 CHECK OF ATTACHMENT.........................................274 8.1.3.1 CHECK OF ATTACHMENT DAILY OR EVERY 8 HOURS............276 8.2 OIL/GREASE SUPPLY AND WATER SERVICE...............................282 8.2.1 UPPER LUBRICATION (INCL. WATER SUPPLY)......................286 8.2.2 LOWER LUBRICATION...........................................288 8.2.3 ATTACHMENT LUBRICATION......................................290 8.2.4 GREASE......................................................292 8.2.5 ENGINE OIL..................................................295 8.2.6 FUEL........................................................296 8.2.7 COOLANT.....................................................297 8.2.8 HYDRAULIC OIL...............................................299 8.2.9 GEAR OIL....................................................301 8.3 CLEANING/WASHING/CHANGE OF FILTER ELEMENT AND STRAINER............306 8.4 CHECK OF BATTERY..................................................316 8.5 ARRANGEMENT AND USE OF FUSE.......................................319 8.6 OPERATION UNDER UNUSUAL CONDITIONS................................321 8.7 MACHINE STORAGE...................................................323 8.8 TIGHTENING TORQUE VALUES..........................................324 8.9 SECURITY PARTS TO BE REPLACED PERIODICALLY........................326 8.10 ADJUSTMENT.......................................................327 8.10.1 ADJUSTMENT OF FRONT AND REAR DRUM LOCKS....................327 8.10.2 ADJUSTMENT OF BOOM DRUM LOCK...............................328 8.10.3 ADJUSTMENT OF THIRD DRUM LOCK..............................329 8.10.4 HANDLING OF WIRE ROPE OVER-UNWINDING PREVENTIVE DEVICE.....330 8.10.5 ADJUSTMENT OF CRAWLER SHOES................................331 8.11 CONSUMABLE PARTS LIST............................................332 9. REFERENCE MATERIALS....................................................337 9.1 SPECIFICATION.....................................................337 9.1.1 PERFORMANCE.................................................337 9.1.2 OUTSIDE DIMENSIONS..........................................337 9.2 DIMENSIONS AND WEIGHT OF EACH PARTS...............................339 9.2.1 BASE MACHINE................................................339 9.2.2 COUNTERWEIGHT...............................................340 9.2.3 ATTACHMENT..................................................341 9.3 STABILITY IN SWINGING AND TRAVELING...............................345 9.4 SYSTEM SCHEMATIC..................................................346 9.4.1 HYDRAULIC SYSTEM SCHEMATIC..................................346 9.4.2 ELECTRICAL WIRING SCHEMATIC.................................347
Questions? Email us: [email protected]
PLEASE NOTE:
- This is the same manual used by the dealers to diagnose and troubleshoot your vehicle
- You will be directed to the download page as soon as the purchase is completed. The whole payment and downloading process will take anywhere between 2-5 minutes
- Need any other service / repair / parts manual, please feel free to contact [email protected] . We still have 50,000 manuals unlisted
S.M
What Our Customers Say
π Related Products
Discover more professional manuals for your equipment

Kobelco Sk115srdz Sk135sr Sk135srlc Hydraulic Excavators Optional Attachments Parts Manual Download

Kobelco Sk100 L V Sk120 V Sk120lc V Model Service Manual - PDF Download

Kobelco Mark v Sk60v Sk100v Sk120v Sk120lcv Sk200v Sk200lcv Sk220v Sk220lcv Hydraulic Excavator Serviceman Handbook - PDF DOWNLOAD
