★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
๐Ÿข
Trusted Business
Verified & Licensed
๐Ÿ›ก๏ธ
Virus Free Files
100% Safe Downloads
๐Ÿ”’
Secure Payment
SSL Protected
โšก
Instant Delivery
Available Immediately
Sale!

Komatsu PC1250-11 PC1250-11E0 PC1250LC-11 PC1250LC-11E0 PC1250SP-11 PC1250SP-11E0 Hydraulic Excavator Field Assembly Instruction Manual GEN00203-02 – PDF DOWNLOAD

Original price was: $89.95.Current price is: $28.95.

Komatsu PC1250-11 PC1250-11E0 PC1250LC-11 PC1250LC-11E0 PC1250SP-11 PC1250SP-11E0 Hydraulic Excavator Field Assembly Instruction Manual GEN00203-02 – PDF DOWNLOAD

Buy now
โšก
Instant PDF Download
Available immediately
๐Ÿ’พ
Save to Your Device
Download & keep forever
๐Ÿ›ก๏ธ
Antivirus Scanned
100% virus-free
๐ŸŒ
Trusted Worldwide
175,000+ customers

Description

Komatsu PC1250-11 PC1250-11E0 PC1250LC-11 PC1250LC-11E0 PC1250SP-11 PC1250SP-11E0 Hydraulic Excavator Field Assembly Instruction Manual GEN00203-02 – PDF DOWNLOAD

IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:

Komatsu PC1250-11 PC1250-11E0 PC1250LC-11 PC1250LC-11E0 PC1250SP-11 PC1250SP-11E0 Hydraulic Excavator Field Assembly Instruction Manual GEN00203-02 – PDF DOWNLOAD

SERIAL NUMBERS 50001 and up

FOREWORD:

Since this machine is large in size. it is divided into some units to meet the transportation conditions and regulations applied to the transporta- tion route when shipped from our factory. This manual describes how to assemble the units into the complete machine in the field.

  • We hope that this machine wit display its quality and you will use it safety according to the operation manual. Many units are large in stze and heavy In โ€œeight and may be handled in a dangerous place or posture and many workers may have to work togetherto sting them with cranes.
  • Accordingly, before starting the assembly work, the work supervisor is required to hold a safety meeting to oblige tl-e workers to put on pro- tective gear and appoint a work leader and a crane work signal man and allot roles to all the norkers for safe work. In particular, the above meeting is more important when worker of difโ€” feront languages and customs work together.

TABLE OF CONTENTS:

Komatsu PC1250-11 PC1250-11E0 PC1250LC-11 PC1250LC-11E0 PC1250SP-11 PC1250SP-11E0 Hydraulic Excavator Field Assembly Instruction Manual GEN00203-02 – PDF DOWNLOAD

SPECIFICATIONS 1
PRECAUTIONS FOR FIELD ASSEMBLY 4
ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE 5
KIT LAYOUT DIAGRAM 6
FLOW OF FIELD ASSEMBLY WORK 7
TRANSPORTATION 8
LIST OF FIELD ASSEMBLY TOOLS 15
TIGHTENING TORQUE 17
COATING MATERIALS 22
SELECTION OF WIRE ROPES USED FOR ASSEMBLY 24
A ASSEMBLY OF CHASSIS 25
A- 1 Install R H and L H track frames 26
A- 2 Install travel piping 31
A- 3 Install travel piping covers 33
A- 4 Install steps 35
A- 6 Add grease to swing circle
A- 7 Assemble upper structure and undercarriage
38
A- 8 Install R H side step
39
A- 9 Install handrails
41
A-10 Install emergency stop switch on right front step (if equipped)
42
A-11 Install air cleaner cap
43
A-12 Install swivel travel piping
44
A-18 Install KomVision camera
61
A-19 Install counterweight
62
A-20 Install counterweight revolving warning lamp (if equipped)
70
A-21 Install counterweight rear lamp (if equipped)
71
A-13 Install L H side step
45
A-14 Install fixed ladder
46
A-15 Install hydraulic stairway (if equipped)
52
A-16 Install flash light (if equipped)
54
A-17 Install L H side step emergency stop switch (if equipped)
59
A-22 Install radiator cover
73
A-23 Install exhaust tail pipe
75
A-24 Change installed position of step light
76
A-25 Change installed position of wireless LAN antenna
78
A-26 Install operator’s cab revolving warning lamp (if equipped)
79
A-27 Install operator’s cab handrail
80
A-28 Install L H rearview mirror
82
A-29 Install R H rearview mirror
84
A-30 Prepare for bleeding air from travel motor
86
A-31 Bleed air from hydraulic pump section
89
A-32 Tighten swing circle mounting bolts to specified torque
90
A-33 Check and adjust track tension
91
A-34 Check fuel, coolant and oil levels
92
A-35 Parts to be touched up after field assembly
95
A- 5 Install auto-greasing unit assembly (if equipped) 36
98
B ASSEMBLING OF WORK EQUIPMENT OF BACKHOE 99
B- 1 Release remaining pressure in hydraulic circuit 100
B- 2 Install arm cylinder to boom 102
B- 3 Install arm cylinder hose 103
B- 4 Install boom cylinder to revolving frame 104
B- 5 Install boom cylinder hose 105
B- 6 Bleed air from cylinder 106
B- 7 Install boom foot dust seal 107
B- 8 Install boom assembly 108
B- 9 Install boom cylinder to boom assembly 109
B-10 Install boom connection hoses (between chassis and boom assembly) 110
B-11 Install arm assembly 111
B-12 Install bucket cylinder hoses (between boom and bucket cylinder) 113
B-13 Install bucket assembly 114
B-14 Clearance standard for installation of work equipment 117
B-15 Install work equipment grease piping 118
B-16 Install work equipment lamps 119
B-17 Grease after assembling work equipment 120
B-18 Bleed air from swing motor 121
B-19 Bleed air from travel motor 122
B-20 Install travel motor guard 123
B-21 Bleed air from hydraulic stairway (if equipped) 124
M PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION
ASSEMBLY 125
M- 1 Replace return filter (Replace standard filter โ†’ flushing filter) 126
M- 2 Flush hydraulic circuit 128
M- 3 Replace return filter (Replace flushing filter โ†’ standard filter) 130
M- 4 Replace pilot filter 132
M- 5 Setting of KomVision (Camera calibration) 133
M- 7 Method for starting up KOMTRAX terminal and default setting of
KOMTRAX Plus controller 147
M- 6 Inspection method of 12m visibility (KomVision) 145
C PROCEDURE FOR ASSEMBLING OF WORK EQUIPMENT
OF LOADING SHOVEL 149
Transportation posture (only work equipment) 150
C- 1 Release remaining pressure in hydraulic circuit 151
C- 2 Bleed air from cylinder 153
C- 3 Flush hydraulic circuit 154
C- 4 Installation of Arm Cylinder Bottoms 155
C- 5 Connection of Boom and Arm 156
C- 6 Pulling out Boom Foot Pin and Boom Cylinder Foot Pin 158
C- 7 Installation of Boom and Arm Assembly 159
C- 8 Installation of Boom Hoses (Between Chassis and Boom) 160
C- 9 Installation of Hoses Between Boom and Arm (Bottom Dump) 161
C-10 Installation of Boom Cylinder Bottoms 162
C-11 Installation of Boom Cylinder Hoses 163
C-12 Installation of Boom Cylinder Head Pin 164
C-13 Installation of Arm Cylinder Hoses 165
C-14 Installation of Bucket Cylinder 166
C-15 Installation of Bucket Cylinder Hoses 167
C-16 Installation of Bucket Assembly 168
C-17 Installation of Bottom Dump Cylinder Hoses 170
C-18 Maintenance Standard 171
C-19 Installation of Working Lamp 172
C-20 Installation of Work Equipment Greasing Piping 173
C-21 Checking Oil Level in Hydraulic Tank and Adding Oil 174
C-22 Greasing After Assembling Work Equipment 175
Inspection of each part after assembly of loader 176
Field Assembly Inspecton Report

Questions? Email us: [email protected]

https://vimeo.com/743043821

PLEASE NOTE:

  • This is the same manual used by the dealers to diagnose and troubleshoot your vehicle
  • You will be directed to the download page as soon as the purchase is completed. The whole payment and downloading process will take anywhere between 2-5 minutes
  • Need any other service / repair / parts manual, please feel free to contactย [email protected]ย . We still have 50,000 manuals unlisted

S.V

What Our Customers Say

โ˜…โ˜…โ˜…โ˜…โ˜… Live reviews from customers
Loading customer reviews...
0
๐Ÿ›’
Recently Purchased
๐Ÿ•’ verified order