Description
Komatsu PC18MR-2 Excavator Shop Manual SEBM038400 – PDF DOWNLOAD
FILE DETAILS:
Komatsu PC18MR-2 Excavator Shop Manual SEBM038400 – PDF DOWNLOAD
Language : English
Pages : 140
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:
Komatsu PC18MR-2 Excavator Shop Manual SEBM038400 – PDF DOWNLOAD
GENERAL PRECAUTIONS :
Mistakes in operation are extremely dangerous. Read the OPERATION & MAINTENANCE MANUAL carefully BEFORE operating the machine.
1. Before carrying out any greasing or repairs, read all the precautions given on the decals which are fixed to the machine.
2. When carrying out any operation, always wear safety shoes and helmet. Do not wear loose work clothes, or clothes with buttons missing.
● Always wear safety glasses when hitting parts with a hammer.
● Always wear safety glasses when grinding parts with a grinder, etc.
3. If welding repairs are needed, always have a trained, experienced welder carry out the work. When carrying out welding work, always wear welding gloves, apron, glasses, cap and other clothes suited for welding work.
4. When carrying out any operation with two or more workers, always agree on the operating procedure before starting. Always inform your fellow workers before starting any step of the operation. Before starting work, hang UNDER REPAIR signs on the controls in the operator’s compartment.
5. Keep all tools in good condition and learn the correct way to use them.
6. Decide a place in the repair workshop to keep tools and removed parts. Always keep the tools and parts in their correct places. Always keep the work area clean and make sure that there is no dirt or oil on the floor. Smoke only in the areas provided for smoking. Never smoke while working.
PREPARATIONS FOR WORK:
7. Before adding oil or making repairs, park the machine on hard, level ground, and block the wheels or tracks to prevent the machine from moving.
8. Before starting work, lower blade, ripper, bucket or any other work equipment to the ground. If this is not possible, insert the safety pin or use blocks to prevent the work equipment from falling. In addition, be sure to lock all the control levers and hang warning signs on them.
9. When disassembling or assembling, support the machine with blocks, jacks or stands before starting work.
10. Remove all mud and oil from the steps or other places used to get on and off the machine. Always use the handrails, ladders or steps when getting on or off the machine. Never jump on or off the machine. If it is impossible to use the handrails, ladders or steps, use a stand to provide safe footing.
PRECAUTIONS DURING WORK :
11. When removing the oil filler cap, drain plug or hydraulic pressure measuring plugs, loosen them slowly to prevent the oil from spurting out. Before disconnecting or removing components of the oil, water or air circuits, first remove the pressure completely from the circuit.
12. The water and oil in the circuits are hot when the engine is stopped, so be careful not to get burned. Wait for the oil and water to cool before carrying out any work on the oil or water circuits.
13. Before starting work, remove the leads from the battery. ALWAYS remove the lead from the negative (-) terminal first.
TABLE OF CONTENTS:
Komatsu PC18MR-2 Excavator Shop Manual SEBM038400 – PDF DOWNLOAD
MAIN MENU 0
COVER 1
CONTENTS 2
SAFETY 3
SAFETY NOTICE 3
FOREWORD 5
GENERAL 5
HOISTING INSTRUCTIONS 7
METHOD OF DISASSEMBLING, CONNECTING PUSH-PULL TYPE COUPLER 8
COATING MATERIALS 10
STANDARD TIGHTENING TORQUE 12
ELECTRIC WIRE CODE 15
CONVERSION TABLE 16
UNITS 22
01 GENERAL 23
SPECIFICATION DIMENSION DRAWING 24
WORKING RANGE DRAWING 25
SPECIFICATIONS 26
WEIGHT TABLE 29
LUBRICANTS, FUEL AND COOLANT SPECIFICATIONS 31
10 STRUCTURE, FUNCTION AND MAINTENANCE STANDARD 33
PTO 34
COOLING SYSTEM 36
POWER TRAIN 38
SWING CIRCLE 39
TRACK FRAME 40
IDLER CUSHION 41
IDLER 43
TRACK ROLLER 44
SPROCKET 45
TRACK SHOE 46
HYDRAULIC COMPONENTS LAYOUT DRAWING 48
HYDRAULIC TANK 49
CENTER SWIVEL JOINT 50
TRAVEL MOTOR 51
HYDRAULIC CYLINDER 60
SOLENOID VALVE 63
VARIABLE GAUGE VALVE 66
MULTI-CONTROL VALVE 67
HYDRAULIC PUMP 68
CONTROL VALVE 74
CLSS 86
OPERATION FOR EACH FUNCTION AND VALVE 90
SWING MOTOR 104
PPC VALVE 108
WORK EQUIPMENT 117
DIMENSIONS OF EACH PART OF WORK EQUIPMENT 120
FLOOR 123
ENGINE CONTROL 124
ELECTRIC CONTROL SYSTEM 126
COMPONENT PARTS OF SYSTEM 131
MONITOR SYSTEM 132
MONITOR PANEL 133
SENSORS 135
90 OTHERS 137
HYDRAULIC CIRCUIT DIAGRAM 139
ELECTRICAL CIRCUIT DIAGRAM 140
S.V 18/12/24