Manitowoc Grove Crane GMK5150L Lattice extension Operating Manual 3302532 PDF
$29.95
The Manitowoc Grove Crane GMK5150L Lattice Extension Operating Manual (3302532) in PDF offers crucial instructions for GMK5150L crane lattice extension operation. It includes safety guidelines, operational details, and technical information, ensuring safe and efficient crane use.
Description
Manitowoc Grove Crane GMK5150L Lattice extension Operating Manual 3302532 – PDF DOWNLOAD
FILE DETAILS:
Manitowoc Grove Crane GMK5150L Lattice extension Operating Manual 3302532 – PDF DOWNLOAD
Language : English
Pages : 466
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:
Manitowoc Grove Crane GMK5150L Lattice extension Operating Manual 3302532 – PDF DOWNLOAD
1 About these operating instructions 31
1 1 Validity 31
1 2 Terms used 33
2 Basic safety instructions 35
2 1 Other applicable documents 35
2 2 Safety instructions for working with a lattice extension 36
3 Operating elements 37
3 1 On the lattice extension 37
3 1 1 Overview 37
3 1 2 Connection section 1 – section 2 38
3 1 3 Folded connection 38
3 1 4 Front connection 39
3 1 5 Middle 2 connection 39
3 1 6 Middle 1 connection 40
3 1 7 Run-up rail 40
3 1 8 Rear connection 41
3 1 9 Section2 control unit 42
3 2 In the crane cab 43
3 2 1 Overview 43
3 2 2 On the CCS control unit 44
3 2 3 On the RCL control unit 45
3 2 4 At the control console, right 46
3 3 On the hand-held control 47
3 3 1 Hand-held control connection 49
3 4 Other operating elements 50
3 4 1 Rigging hook 50
4 Rigging work on the main boom 51
4 1 Hose drum 51
4 1 1 Slinging points 51
4 1 2 Transport dimensions and weights 52
4 2 Rigging work on the hose drum 53
4 2 1 Fitting/removing the hose drum 53
4 2 2 Checking the locking device on the hose drum 55
4 2 3 Positions of the hydraulic connections 56
5 Swing-away lattice 61
5 1 Notes on this chapter 61
5 2 Operations planning 62
5 2 1 Assembly 62
5 2 2 Identification 63
5 2 3 Slinging points 64
5 2 4 Transport dimensions and weights 66
5 2 5 Transport condition – removed 68
5 2 6 Transport condition – folded 73
5 3 Checklists for rigging work 77
5 3 1 Overview 77
5 3 2 CHECKLIST: Installing the swing-away lattice – into the operating position 79
5 3 3 CHECKLIST: Installing the swing-away lattice – into the transport position 85
5 3 4 CHECKLIST: Removing the swing-away lattice – from the operating position 90
5 3 5 CHECKLIST: Removing the swing-away lattice – from the transport position 97
5 3 6 CHECKLIST: Rigging the swing-away lattice 1 8 + 9 4 m – in the operating position 101
5 3 7 CHECKLIST: Rigging the swing-away lattice 1 8 + 16 0 m – in the operating position 106
5 3 8 CHECKLIST: Rigging the swing-away lattice 1 8 + 9 4 m – in the transport position 111
5 3 9 CHECKLIST: Rigging the swing-away lattice 1 8 + 16 0 m – in the transport position 117
5 3 10 CHECKLIST: Further rigging work 125
5 4 Rigging work 127
5 4 1 Notes on the position of the telescoping cylinder 127
5 4 2 Secure the swing-away lattice with guide rope 128
5 4 3 Reeving/unreeving the rigging rope 129
5 4 4 Establishing/separating the Rear connection 130
5 4 5 Establishing/separating the Middle1 connection 131
5 4 6 Establishing/disconnecting the Front connection 132
5 4 7 Folding the run-up rail out/in 134
5 4 8 Establishing/separating the slewing connection 135
5 4 9 Establishing/separating the connection between the main boom/section4 137
5 4 10 Establishing/separating connections between lattice extension sections – during installati 139
5 4 11 Section1/section2 – Establish/separate the right-hand connection 145
5 4 12 Section1/section2 – Establish/separate the left-hand connection 146
5 4 13 Section1/section2 – Establishing/separating the Folded connection 148
5 4 14 Swinging the swing-away lattice 149
5 4 15 Slewing section1 150
5 4 16 Establishing/disconnecting the hydraulic connection – Main boom/swing-away lattice 151
5 4 17 Establishing/disconnecting electrical connections – swingaway lattice 153
5 4 18 Fold the deflection sheaves in/out on section2 and section4 165
5 4 19 Folding the deflection sheaves on section3 into the operating position/transport position 167
5 4 20 Attaching/removing the hoist rope 168
5 4 21 Installing / removing the lifting limit switch 170
5 4 22 Installing / removing the anemometer and air traffic control light 172
5 4 23 Installing / removing the camera 174
5 4 24 Derricking cylinder positions 177
5 4 25 Derricking the swing-away lattice for rigging work – hand-held control 178
5 4 26 Derricking the swing-away lattice – Section2 control unit 179
5 4 27 Setting the angle – with an auxiliary crane 180
5 4 28 Setting the angle – without the auxiliary crane 181
5 5 Operation with swing-away lattice 187
5 5 1 Setting the RCL 187
5 5 2 Derricking the main boom 188
5 5 3 Telescoping with rigged swing-away lattice 188
5 5 4 Derricking the swing-away lattice in operation 189
5 5 5 Procedure if permissible wind speed is exceeded 190
5 5 6 Information about the main boom operation when the swing- away lattice is folded/rigged 191
5 5 7 Instructions for turning loads over 192
5 6 Maintenance 193
5 6 5 Description of maintenance work 194
5 7 Finding and eliminating malfunctions 201
5 7 1 Troubleshooting table 201
6 Boom extension 203
6 1 Notes on this chapter 203
6 2 Operations planning 205
6 2 1 Assembly 205
6 2 2 Identification 206
6 2 3 Slinging points 207
6 2 4 Transport dimensions and weights 208
6 2 5 Transport condition 208
6 3 Checklists for rigging work 209
6 3 1 Overview 209
6 3 2 CHECKLIST: Installing the boom extension 210
6 3 3 CHECKLIST: Removing the boom extension 214
6 4 Description of the rigging work 219
6 4 1 Section5 – Folding out/folding in the deflection sheave 219
6 4 2 Section5/main boom – Establish/separate the connection 220
6 4 3 Section5/main boom – Establish/separate the electrical connections 221
6 4 4 Section5/main boom – Establish/separating the hydraulic connection 223
6 4 5 Section4 – Folding out/folding in the deflection sheave 224
6 4 6 Section2 – Folding out/folding in the deflection sheave 225
6 4 7 Section4/section5 – Establishing/separating the connection 226
6 4 8 Section4/section5 – Establishing/separating the electrical connections 227
6 4 9 Section4/section5 – Establishing/separating the hydraulic connection 229
6 4 10 Section5 – Fitting/removing the hoist rope 230
6 5 Operation with boom extension 231
6 5 1 Setting the RCL 231
6 5 2 Derricking, telescoping the main boom 232
6 5 3 Procedure if permissible wind speeds are exceeded 233
6 5 4 Instructions for turning loads over 233
6 6 Maintenance 235
6 6 3 Description of maintenance work 236
7 Integral heavy load lattice extension (ISS) 1 8+2 0m/9 8 + 2 0m 237
7 1 Operations planning 238
7 1 1 Assembly 238
7 1 2 Identification 239
7 1 3 Slinging points 240
7 1 4 Transport dimensions and weights 241
7 1 5 Transport condition – removed 241
7 1 6 Transport condition – folded 243
7 2 Checklists for rigging work 245
7 2 1 Overview 245
7 2 2 CHECKLIST: ISS Installing 1 8 + 2 0m – into the working position 246
7 2 3 CHECKLIST: ISS Removing 1 8 + 2 0m – from the working position 249
7 2 4 CHECKLIST: Rigging ISS 1 8 + 2 0m – into the working position 253
7 2 5 CHECKLIST: Rigging ISS 1 8 + 2 0m – into the transport position 257
7 2 6 CHECKLIST: Rigging ISS 1 8 + 2 0m from the swing-away lattice – into the working position 262
7 2 7 CHECKLIST: Rigging ISS 1 8 + 2 0m from the swing-away lattice – into the transport position 266
7 2 8 CHECKLIST: ISS Installing 9 8 + 2 0m 271
7 2 9 CHECKLIST: ISS Removing 9 8 + 2 0m 275
7 2 10 CHECKLIST: Further rigging work 279
7 3 Rigging work 281
7 3 1 Securing sections with a guide rope 281
7 3 2 Establishing/separating the Middle 2 connection 282
7 3 3 Installing/removing section4 284
7 3 4 Establishing/separating connections between section4 and section2 286
7 3 5 Connecting/disconnecting the electrical connections – section4/main boom 289
7 3 6 Connecting/disconnecting the hydraulic connections – section4 / main boom 291
7 3 7 Folding out / folding in the deflection sheave on section4 292
7 3 8 Folding out / folding in the head sheave on section4 293
7 3 9 Fitting/removing the hoist rope – section4 294
7 3 10 Possible reeving methods on the heavy load lattice extension 295
7 3 11 Connecting/disconnecting the electrical connections – section4/section2 297
7 3 12 Installing / removing the lifting limit switch 299
7 3 13 Installing / removing the anemometer and air traffic control light 300
7 3 14 Installing / removing the camera 302
7 3 15 Folding out / folding in the deflection sheave on section5 303
7 3 16 Section5/main boom – Establish/separate the connection 304
7 3 17 Connecting/disconnecting the electrical connections – section5/main boom 305
7 3 18 Connecting/disconnecting the hydraulic connections – section5 / main boom 307
7 3 19 Installing/removing section4 on section5 308
7 3 20 Connection/disconnecting the electrical connections between section4 and section5 309
7 3 21 Connection/disconnecting the hydraulic connection between section4 and section5 311
7 3 22 Positioning/removing the hoist rope – section5 and section4 312
7 3 23 Derricking cylinder positions 314
7 4 ISS, derricking 315
7 5 Operation with the ISS 317
7 5 1 Setting the RCL 317
7 5 2 Derricking, telescoping the main boom 319
7 5 3 Procedure if permissible wind speeds are exceeded 320
7 5 4 Instructions for turning loads over 320
7 6 Maintenance 321
7 6 5 Description of maintenance work 322
8 Heavy load lattice extension (SLS) 2 0m/10 0m 327
8 1 Operations planning 327
8 1 1 Assembly 327
8 1 2 Identification 328
8 1 3 Slinging points 329
8 1 4 Transport dimensions and weights 330
8 1 5 Transport condition 331
8 2 Checklists for rigging work 333
8 2 1 Overview 333
8 2 2 CHECKLIST: SLS Installing 2 0m – into the working position 334
8 2 3 CHECKLIST: SLS Installing 2 0m – into the transport position 337
8 2 4 CHECKLIST: SLS Removing 2 0m – from the working position 338
8 2 5 CHECKLIST: SLS Removing 2 0m – from transport position 341
8 2 6 CHECKLIST: SLS Rigging 2 0m – into the working position 343
8 2 7 CHECKLIST: SLS Rigging 2 0m – into the transport position 346
8 2 8 CHECKLIST: SLS Installing 10 0m 349
8 2 9 CHECKLIST: SLS Removing 10 0m 353
8 3 Description of the rigging work 357
8 3 1 Section6/main boom– Establish/separate the connection in the working position 357
8 3 2 Section6/main boom – Establish/separate the connection in the transport position 359
8 3 3 Bringing section6 from the transport position into the working position 361
8 3 4 Bringing section6 into the transport position 362
8 3 5 Section6/main boom – Establish/separate the electrical connections 363
8 3 6 Section6 – Setting the angle 365
8 3 7 Section6 – Fitting/removing the hoist rope 367
8 3 8 Possible reeving methods on the heavy load lattice extension 368
8 3 9 Installing / removing the lifting limit switch 370
8 3 10 Installing / removing the anemometer and air traffic control light 371
8 3 11 Installing / removing the camera 373
8 3 12 Section5 – Folding out/folding in the deflection sheave 374
8 3 13 Section5/main boom – Establish/separate the connection 375
8 3 14 Section5/main boom – Establish/separate the electrical connections 376
8 3 15 Section6/section5 – Establishing/separating the connection 378
8 3 16 Section6/section5 – Establishing/separating the electrical connections 379
8 3 17 Section6/section5 – Fitting/removing the hoist rope 381
8 4 Operation with the heavy load lattice extension 383
8 4 1 Setting the RCL 383
8 4 2 Derricking, telescoping the main boom 385
8 4 3 Procedure if permissible wind speeds are exceeded 386
8 4 4 Instructions for turning loads over 386
8 5 Maintenance 387
8 5 4 Description of maintenance work 388
9 Auxiliary single-sheave boom top1 391
9 1 Operations planning 391
9 1 1 Identification 391
9 1 2 Slinging points 392
9 1 3 Transport dimensions and weights 393
9 1 4 Transport condition 393
9 2 Description of the rigging work 395
9 2 1 Moving the auxiliary single-sheave boom top into the operating position 395
9 2 2 Moving the auxiliary single-sheave boom top into the transport position 397
9 2 3 Installing/removing a folded up auxiliary single-sheave boomtop 399
9 2 4 Attaching/removing the hoist rope 400
9 2 5 Installing / removing the lifting limit switch and anemometer 401
9 3 Operation with the auxiliary single-sheave boom top1 403
9 3 1 Setting the RCL 403
9 3 2 Procedure if permissible wind speeds are exceeded 404
9 3 3 Instructions for turning loads over 404
9 4 Maintenance 405
9 4 3 Description of maintenance work 406
10 Auxiliary single-sheave boom top2 407
10 1 Operations planning 407
10 1 1 Identification 407
10 1 2 Slinging points 408
10 1 3 Transport dimensions and weights 409
10 1 4 Transport condition 409
10 2 Description of the rigging work 411
10 2 1 Moving the auxiliary single-sheave boom top into the operating position 411
10 2 2 Moving the auxiliary single-sheave boom top into the transport position 413
10 2 3 Installing/removing a folded up auxiliary single-sheave boom top 415
10 2 4 Connect/disconnect electrical connection for the marker lights 417
10 2 5 Attaching/removing the hoist rope 418
10 2 6 Installing / removing the lifting limit switch and anemometer 419
10 3 Operation with the auxiliary single-sheave boom top2 421
10 3 1 Setting the RCL 421
10 3 2 Procedure if permissible wind speeds are exceeded 422
10 3 3 Instructions for turning loads over 422
10 4 Maintenance 423
10 4 3 Description of maintenance work 424
11 Turning loads over 425
11 1 Setting the RCL 426
11 2 Turning a load over 427
12 Driving with a rigged crane 429
12 1 Safety instructions 429
12 2 Driving path 430
12 3 Permissible rigging modes and axle loads 431
12 3 1 Swing-away lattice 432
12 3 2 Boom extension 438
12 3 3 Integral heavy load lattice extension 444
12 3 4 Heavy load lattice extension 2 0m/10m 448
12 3 5 Auxiliary single-sheave boom top 1 and auxiliary single-sheave boom top 2 452
12 4 Before driving 453
12 5 While driving 453
12 6 After driving 453
13 Index 455
A 457
B 457
D 458
H 459
I 460
L 460
M 460
O 460
P 461
R 461
S 461
T 463
Customer Support: [email protected]
S.M
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Manitowoc Mobile Cranes KMK5160 Hydraulic Diagrams Manual - PDF DOWNLOAD

Manitowoc Mobile Cranes KMK2025 Electric Wiring Diagrams Manual EN_DE - PDF DOWNLOAD

Manitowoc Mobile Cranes KMK4000 Pneumatic Diagrams Manual - PDF DOWNLOAD
