Manitowoc Grove Crane GMK5150L Lattice extension Operating Manual PDF
$29.95
The Manitowoc Grove Crane GMK5150L Lattice Extension Operating Manual (3302532) in PDF provides essential instructions for GMK5150L crane lattice extension operation. It includes safety guidelines, operational details, and technical information, ensuring safe and efficient crane use.
Description
Manitowoc Grove Crane GMK5150L Lattice extension Operating Manual 3302532 – PDF DOWNLOAD
FILE DETAILS:
Manitowoc Grove Crane GMK5150L Lattice extension Operating Manual 3302532 – PDF DOWNLOAD
Language : English
Pages : 468
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:
Manitowoc Grove Crane GMK5150L Lattice extension Operating Manual 3302532 – PDF DOWNLOAD
Fitting the hoist rope on auxiliary single-sheave boom top 1 3
Validity 3
Versions 3
Moving the rod 4
1 About these operating instructions 33
1 1 Validity 33
1 2 Terms used 35
2 Basic safety instructions 37
2 1 Other applicable documents 37
2 2 Safety instructions for working with a lattice extension 38
3 Operating elements 39
3 1 On the lattice extension 39
3 1 1 Overview 39
3 1 2 Connection section 1 – section 2 40
3 1 3 Folded connection 40
3 1 4 Front connection 41
3 1 5 Middle 2 connection 41
3 1 6 Middle 1 connection 42
3 1 7 Run-up rail 42
3 1 8 Rear connection 43
3 1 9 Section2 control unit 44
3 2 In the crane cab 45
3 2 1 Overview 45
3 2 2 On the CCS control unit 46
3 2 3 On the RCL control unit 47
3 2 4 At the control console, right 48
3 3 On the hand-held control 49
3 3 1 Hand-held control connection 51
3 4 Other operating elements 52
3 4 1 Rigging hook 52
4 Rigging work on the main boom 53
4 1 Hose drum 53
4 1 1 Slinging points 53
4 1 2 Transport dimensions and weights 54
4 2 Rigging work on the hose drum 55
4 2 1 Fitting/removing the hose drum 55
4 2 2 Checking the locking device on the hose drum 57
4 2 3 Positions of the hydraulic connections 58
5 Swing-away lattice 63
5 1 Notes on this chapter 63
5 2 Operations planning 64
5 2 1 Assembly 64
5 2 2 Identification 65
5 2 3 Slinging points 66
5 2 4 Transport dimensions and weights 68
5 2 5 Transport condition – removed 70
5 2 6 Transport condition – folded 75
5 3 Checklists for rigging work 79
5 3 1 Overview 79
5 3 2 CHECKLIST: Installing the swing-away lattice – into the operating position 81
5 3 3 CHECKLIST: Installing the swing-away lattice – into the transport position 87
5 3 4 CHECKLIST: Removing the swing-away lattice – from the operating position 92
5 3 5 CHECKLIST: Removing the swing-away lattice – from the transport position 99
5 3 6 CHECKLIST: Rigging the swing-away lattice 1 8 + 9 4 m – in the operating position 103
5 3 7 CHECKLIST: Rigging the swing-away lattice 1 8 + 16 0 m – in the operating position 108
5 3 8 CHECKLIST: Rigging the swing-away lattice 1 8 + 9 4 m – in the transport position 113
5 3 9 CHECKLIST: Rigging the swing-away lattice 1 8 + 16 0 m – in the transport position 119
5 3 10 CHECKLIST: Further rigging work 127
5 4 Rigging work 129
5 4 1 Notes on the position of the telescoping cylinder 129
5 4 2 Secure the swing-away lattice with guide rope 130
5 4 3 Reeving/unreeving the rigging rope 131
5 4 4 Establishing/separating the Rear connection 132
5 4 5 Establishing/separating the Middle1 connection 133
5 4 6 Establishing/disconnecting the Front connection 134
5 4 7 Folding the run-up rail out/in 136
5 4 8 Establishing/separating the slewing connection 137
5 4 9 Establishing/separating the connection between the main boom/section4 139
5 4 10 Establishing/separating connections between lattice extension sections – during installati 141
5 4 11 Section1/section2 – Establish/separate the right-hand connection 147
5 4 12 Section1/section2 – Establish/separate the left-hand connection 148
5 4 13 Section1/section2 – Establishing/separating the Folded connection 150
5 4 14 Swinging the swing-away lattice 151
5 4 15 Slewing section1 152
5 4 16 Establishing/disconnecting the hydraulic connection – Main boom/swing-away lattice 153
5 4 17 Establishing/disconnecting electrical connections – swingaway lattice 155
5 4 18 Fold the deflection sheaves in/out on section2 and section4 167
5 4 19 Folding the deflection sheaves on section3 into the operating position/transport position 169
5 4 20 Attaching/removing the hoist rope 170
5 4 21 Installing / removing the lifting limit switch 172
5 4 22 Installing / removing the anemometer and air traffic control light 174
5 4 23 Installing / removing the camera 176
5 4 24 Derricking cylinder positions 179
5 4 25 Derricking the swing-away lattice for rigging work – hand-held control 180
5 4 26 Derricking the swing-away lattice – Section2 control unit 181
5 4 27 Setting the angle – with an auxiliary crane 182
5 4 28 Setting the angle – without the auxiliary crane 183
5 5 Operation with swing-away lattice 189
5 5 1 Setting the RCL 189
5 5 2 Derricking the main boom 190
5 5 3 Telescoping with rigged swing-away lattice 190
5 5 4 Derricking the swing-away lattice in operation 191
5 5 5 Procedure if permissible wind speed is exceeded 192
5 5 6 Information about the main boom operation when the swing- away lattice is folded/rigged 193
5 5 7 Instructions for turning loads over 194
5 6 Maintenance 195
5 6 5 Description of maintenance work 196
5 7 Finding and eliminating malfunctions 203
5 7 1 Troubleshooting table 203
6 Boom extension 205
6 1 Notes on this chapter 205
6 2 Operations planning 207
6 2 1 Assembly 207
6 2 2 Identification 208
6 2 3 Slinging points 209
6 2 4 Transport dimensions and weights 210
6 2 5 Transport condition 210
6 3 Checklists for rigging work 211
6 3 1 Overview 211
6 3 2 CHECKLIST: Installing the boom extension 212
6 3 3 CHECKLIST: Removing the boom extension 216
6 4 Description of the rigging work 221
6 4 1 Section5 – Folding out/folding in the deflection sheave 221
6 4 2 Section5/main boom – Establish/separate the connection 222
6 4 3 Section5/main boom – Establish/separate the electrical connections 223
6 4 4 Section5/main boom – Establish/separating the hydraulic connection 225
6 4 5 Section4 – Folding out/folding in the deflection sheave 226
6 4 6 Section2 – Folding out/folding in the deflection sheave 227
6 4 7 Section4/section5 – Establishing/separating the connection 228
6 4 8 Section4/section5 – Establishing/separating the electrical connections 229
6 4 9 Section4/section5 – Establishing/separating the hydraulic connection 231
6 4 10 Section5 – Fitting/removing the hoist rope 232
6 5 Operation with boom extension 233
6 5 1 Setting the RCL 233
6 5 2 Derricking, telescoping the main boom 234
6 5 3 Procedure if permissible wind speeds are exceeded 235
6 5 4 Instructions for turning loads over 235
6 6 Maintenance 237
6 6 3 Description of maintenance work 238
7 Integral heavy load lattice extension (ISS) 1 8+2 0m/9 8 + 2 0m 239
7 1 Operations planning 240
7 1 1 Assembly 240
7 1 2 Identification 241
7 1 3 Slinging points 242
7 1 4 Transport dimensions and weights 243
7 1 5 Transport condition – removed 243
7 1 6 Transport condition – folded 245
7 2 Checklists for rigging work 247
7 2 1 Overview 247
7 2 2 CHECKLIST: ISS Installing 1 8 + 2 0m – into the working position 248
7 2 3 CHECKLIST: ISS Removing 1 8 + 2 0m – from the working position 251
7 2 4 CHECKLIST: Rigging ISS 1 8 + 2 0m – into the working position 255
7 2 5 CHECKLIST: Rigging ISS 1 8 + 2 0m – into the transport position 259
7 2 6 CHECKLIST: Rigging ISS 1 8 + 2 0m from the swing-away lattice – into the working position 264
7 2 7 CHECKLIST: Rigging ISS 1 8 + 2 0m from the swing-away lattice – into the transport position 268
7 2 8 CHECKLIST: ISS Installing 9 8 + 2 0m 273
7 2 9 CHECKLIST: ISS Removing 9 8 + 2 0m 277
7 2 10 CHECKLIST: Further rigging work 281
7 3 Rigging work 283
7 3 1 Securing sections with a guide rope 283
7 3 2 Establishing/separating the Middle 2 connection 284
7 3 3 Installing/removing section4 286
7 3 4 Establishing/separating connections between section4 and section2 288
7 3 5 Connecting/disconnecting the electrical connections – section4/main boom 291
7 3 6 Connecting/disconnecting the hydraulic connections – section4 / main boom 293
7 3 7 Folding out / folding in the deflection sheave on section4 294
7 3 8 Folding out / folding in the head sheave on section4 295
7 3 9 Fitting/removing the hoist rope – section4 296
7 3 10 Possible reeving methods on the heavy load lattice extension 297
7 3 11 Connecting/disconnecting the electrical connections – section4/section2 299
7 3 12 Installing / removing the lifting limit switch 301
7 3 13 Installing / removing the anemometer and air traffic control light 302
7 3 14 Installing / removing the camera 304
7 3 15 Folding out / folding in the deflection sheave on section5 305
7 3 16 Section5/main boom – Establish/separate the connection 306
7 3 17 Connecting/disconnecting the electrical connections – section5/main boom 307
7 3 18 Connecting/disconnecting the hydraulic connections – section5 / main boom 309
7 3 19 Installing/removing section4 on section5 310
7 3 20 Connection/disconnecting the electrical connections between section4 and section5 311
7 3 21 Connection/disconnecting the hydraulic connection between section4 and section5 313
7 3 22 Positioning/removing the hoist rope – section5 and section4 314
7 3 23 Derricking cylinder positions 316
7 4 ISS, derricking 317
7 5 Operation with the ISS 319
7 5 1 Setting the RCL 319
7 5 2 Derricking, telescoping the main boom 321
7 5 3 Procedure if permissible wind speeds are exceeded 322
7 5 4 Instructions for turning loads over 322
7 6 Maintenance 323
7 6 5 Description of maintenance work 324
8 Heavy load lattice extension (SLS) 2 0m/10 0m 329
8 1 Operations planning 329
8 1 1 Assembly 329
8 1 2 Identification 330
8 1 3 Slinging points 331
8 1 4 Transport dimensions and weights 332
8 1 5 Transport condition 333
8 2 Checklists for rigging work 335
8 2 1 Overview 335
8 2 2 CHECKLIST: SLS Installing 2 0m – into the working position 336
8 2 3 CHECKLIST: SLS Installing 2 0m – into the transport position 339
8 2 4 CHECKLIST: SLS Removing 2 0m – from the working position 340
8 2 5 CHECKLIST: SLS Removing 2 0m – from transport position 343
8 2 6 CHECKLIST: SLS Rigging 2 0m – into the working position 345
8 2 7 CHECKLIST: SLS Rigging 2 0m – into the transport position 348
8 2 8 CHECKLIST: SLS Installing 10 0m 351
8 2 9 CHECKLIST: SLS Removing 10 0m 355
8 3 Description of the rigging work 359
8 3 1 Section6/main boom– Establish/separate the connection in the working position 359
8 3 2 Section6/main boom – Establish/separate the connection in the transport position 361
8 3 3 Bringing section6 from the transport position into the working position 363
8 3 4 Bringing section6 into the transport position 364
8 3 5 Section6/main boom – Establish/separate the electrical connections 365
8 3 6 Section6 – Setting the angle 367
8 3 7 Section6 – Fitting/removing the hoist rope 369
8 3 8 Possible reeving methods on the heavy load lattice extension 370
8 3 9 Installing / removing the lifting limit switch 372
8 3 10 Installing / removing the anemometer and air traffic control light 373
8 3 11 Installing / removing the camera 375
8 3 12 Section5 – Folding out/folding in the deflection sheave 376
8 3 13 Section5/main boom – Establish/separate the connection 377
8 3 14 Section5/main boom – Establish/separate the electrical connections 378
8 3 15 Section6/section5 – Establishing/separating the connection 380
8 3 16 Section6/section5 – Establishing/separating the electrical connections 381
8 3 17 Section6/section5 – Fitting/removing the hoist rope 383
8 4 Operation with the heavy load lattice extension 385
8 4 1 Setting the RCL 385
8 4 2 Derricking, telescoping the main boom 387
8 4 3 Procedure if permissible wind speeds are exceeded 388
8 4 4 Instructions for turning loads over 388
8 5 Maintenance 389
8 5 4 Description of maintenance work 390
9 Auxiliary single-sheave boom top1 393
9 1 Operations planning 393
9 1 1 Identification 393
9 1 2 Slinging points 394
9 1 3 Transport dimensions and weights 395
9 1 4 Transport condition 395
9 2 Description of the rigging work 397
9 2 1 Moving the auxiliary single-sheave boom top into the operating position 397
9 2 2 Moving the auxiliary single-sheave boom top into the transport position 399
9 2 3 Installing/removing a folded up auxiliary single-sheave boomtop 401
9 2 4 Attaching/removing the hoist rope 402
9 2 5 Installing / removing the lifting limit switch and anemometer 403
9 3 Operation with the auxiliary single-sheave boom top1 405
9 3 1 Setting the RCL 405
9 3 2 Procedure if permissible wind speeds are exceeded 406
9 3 3 Instructions for turning loads over 406
9 4 Maintenance 407
9 4 3 Description of maintenance work 408
10 Auxiliary single-sheave boom top2 409
10 1 Operations planning 409
10 1 1 Identification 409
10 1 2 Slinging points 410
10 1 3 Transport dimensions and weights 411
10 1 4 Transport condition 411
10 2 Description of the rigging work 413
10 2 1 Moving the auxiliary single-sheave boom top into the operating position 413
10 2 2 Moving the auxiliary single-sheave boom top into the transport position 415
10 2 3 Installing/removing a folded up auxiliary single-sheave boom top 417
10 2 4 Connect/disconnect electrical connection for the marker lights 419
10 2 5 Attaching/removing the hoist rope 420
10 2 6 Installing / removing the lifting limit switch and anemometer 421
10 3 Operation with the auxiliary single-sheave boom top2 423
10 3 1 Setting the RCL 423
10 3 2 Procedure if permissible wind speeds are exceeded 424
10 3 3 Instructions for turning loads over 424
10 4 Maintenance 425
10 4 3 Description of maintenance work 426
11 Turning loads over 427
11 1 Setting the RCL 428
11 2 Turning a load over 429
12 Driving with a rigged crane 431
12 1 Safety instructions 431
12 2 Driving path 432
12 3 Permissible rigging modes and axle loads 433
12 3 1 Swing-away lattice 434
12 3 2 Boom extension 440
12 3 3 Integral heavy load lattice extension 446
12 3 4 Heavy load lattice extension 2 0m/10m 450
12 3 5 Auxiliary single-sheave boom top 1 and auxiliary single-sheave boom top 2 454
12 4 Before driving 455
12 5 While driving 455
12 6 After driving 455
13 Index 457
A 459
B 459
D 460
H 461
I 462
L 462
M 462
O 462
P 463
R 463
S 463
T 465
Customer Support: [email protected]
S.M
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Manitowoc Mobile Cranes KMK5120 Hydraulic Diagrams Manual - PDF DOWNLOAD

Manitowoc Mobile Cranes KMK4060 Hydraulic Diagrams Manual - PDF DOWNLOAD

Grove Manitowoc TMS9000E13 Superstructure Operator Manual & Supplement Manual - PDF DOWNLOAD
