★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Manitowoc Grove Crane GMK5200/6220-L Operating Manual PDF

$28.95

The Manitowoc Grove GMK5200/6220-L Lattice Extension Operating Instructions Manual (2084906) is a vital PDF resource. Download for detailed insights into operating lattice extensions, ensuring safe and efficient usage of the GMK5200/6220-L crane.

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Manitowoc Grove Crane GMK5200/6220-L lattice extension Operating instructions Manual 2084906 – PDF DOWNLOAD

FILE DETAILS:

The Manitowoc Grove GMK5200/6220-L Lattice Extension Operating Instructions Manual (2084906) is a vital PDF resource. Download for detailed insights into operating lattice extensions, ensuring safe and efficient usage of the GMK5200/6220-L crane.

Manitowoc Grove Crane GMK5200/6220-L lattice extension Operating instructions Manual 2084906 – PDF DOWNLOAD

Language : English
Pages :228
Downloadable : Yes
File Type : PDF

IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:

Manitowoc Grove Crane GMK5200/6220-L lattice extension Operating instructions Manual 2084906 – PDF DOWNLOAD

1 Important information
1 1 About these operating instructions 1 – 1
1 2 Fundamental safety instructions for crane operators 1 – 2
1 2 1 Warnings and symbols 1 – 2
1 3 Proper use 1 – 3
1 4 Organisational measures 1 – 5
1 5 Personnel qualifications 1 – 7
1 6 Safety instructions for truck crane work 1 – 8
1 7 Specifications in US units of measurement 1 – 10
1 7 1 Two-stage swing-away lattice extension 1 – 10
1 7 2 Auxiliary single-sheave boom top 1 – 10
1 7 3 Boom extension 1 – 11
1 7 4 Heavy load lattice extension 1 – 11
Dimensions and weights
2 1 Dimensions and weights in metric units 2 – 1
2 1 1 Two-stage swing-away lattice extension 2 – 1
2 1 2 Auxiliary single-sheave boom top 2 – 1
2 1 3 Boom extension 2 – 1
2 1 4 Heavy load lattice extension 2 – 2
2 2 Transport dimensions and weights in US units 2 – 3
2 2 1 Two-stage swing-away lattice extension 2 – 3
2 2 2 Auxiliary single-sheave boom top 2 – 3
2 2 3 Boom extension 2 – 3
2 2 4 Heavy load lattice extension 2 – 4
3 Two-stage swing-away lattice extension
3 1 Operating and display elements 3 – 1
3 1 1 Operating elements in the crane cab 3 – 1
3 1 2 Operating elements on two-stage swing-away lattice extension 3 – 3
3 2 Identification 3 – 5
3 3 Assembly 3 – 7
3 4 Slinging points 3 – 9
3 5 Checklists for rigging work 3 – 11
3 5 1 Overview of the required rigging work 3 – 11
3 5 2 CHECK LIST: Installing two-stage swing-away lattice extension 3 – 12
3 5 3 CHECK LIST: Removing two-stage swing-away lattice extension 3 – 14
3 5 4 CHECK LIST: Rigging 13 m (43 ft) swing-away lattice extension 3 – 16
3 5 5 CHECK LIST: Unrigging 13 m (43 ft) swing-away lattice extension 3 – 20
3 5 6 CHECK LIST: Rigging 22 m (72 ft) two-stage swing-away lattice extension 3 – 24
3 5 7 CHECK LIST: Unrigging 22 m (72 ft) two-stage swing-away lattice extension 3 – 28
3 6 Description of rigging work 3 – 33
3 6 1 Preparing the truck crane for rigging 3 – 33
3 6 2 Checking the transport condition 3 – 35
3 6 3 Hose drum for hydraulic supply 3 – 38
3 6 4 Connections with folded-up lattice extension 3 – 43
3 6 5 Pin connections to swing the lattice extension 3 – 48
3 6 6 Pin connections for working with the lattice extension 3 – 52
3 6 7 Lowering/raising retaining mandrel on main boom 3 – 57
3 6 8 Swinging the lattice extension when rigging 3 – 61
3 6 9 Run-up rail 3 – 63
3 6 10 Swinging the lattice extension onto the main boom head 3 – 64
3 6 11 Electrical connection on the lattice extension 3 – 65
3 6 12 Establishing/disconnecting the hydraulic connection 3 – 67
3 6 13 Folding out/in the deflection sheaves on the 12 5 m (41 ft) section 3 – 68
3 6 14 Positioning hoist rope 3 – 70
3 6 15 Lifting limit switch on the lattice extension 3 – 72
3 6 16 Anemometer on the lattice extension 3 – 74
3 6 17 Derricking lattice extension 3 – 75
3 6 18 Transportation on a separate vehicle 3 – 76
3 7 Raising the setting down the main boom with rigged lattice extension 3 – 77
3 7 1 Telescoping with rigged lattice extension 3 – 78
3 7 2 Operation with the lattice extension 3 – 78
3 8 Turning loads with the two-stage swing-away lattice extension 3 – 81
3 8 1 Requirements 3 – 81
3 8 2 Setting SLI 3 – 82
2 084 906 en Operating instructions lattice extension
GMK 5200/6220-L
04 08 2004
3 9 Driving with rigged crane and two-stage swing-away lattice extension
installed 3 – 87
3 9 1 Driving route 3 – 87
3 9 2 Rigging mode and axle loads GMK 5200 3 – 88
3 9 3 Rigging mode and axle loads GMK 6220-L 3 – 91
3 9 4 Driving the rigged crane 3 – 95
3 10 Malfunctions 3 – 99
3 10 1 Two-stage swing-away lattice extension malfunctions 3 – 99
3 10 2 Malfunctions on the SLI 3 – 100
3 11 Maintenance plan 3 – 103
3 11 1 Maintenance plan M 1: monthly / after 100 Oh 3 – 103
3 12 Table of lubricants 3 – 105
3 13 Maintenance work 3 – 107
3 13 1 Modules in need of protection during cleaning work 3 – 107

Customer Support: [email protected]

S.M

 

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order